GovChime
Notice ID: e3be8ed927814e29b0c20e14481d0434Presolicitation

Mission-Integrated Network Control (MINC)

Archived on November 26, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−04:00
Posted
June 24, 2021
Notice type
Presolicitation
Agency
Department of WarDEFENSE ADVANCED RESEARCH PROJECTS AGENCY (DARPA)

Notice details

Office
DEF ADVANCED RESEARCH PROJECTS AGCY
Last updated
Sep 9, 2025

Identifiers

Solicitation number
HR001121S0028
Notice ID
e3be8ed927814e29b0c20e14481d0434

Description

The objective of the MINC program is to ensure that critical data finds a path to the right user at the right time in highly contested, highly dynamic communication environments using secure control of any available communication or networking resources (communications, compute, or storage capabilities). The MINC approach is designed to interoperate with a heterogeneous mix of legacy and future systems to ensure timely and reliable delivery of data that is not guaranteed today. This capability replaces the manual, static configuration of individual, tactical networks and the associated limited internetworking capabilities. The growing emphasis on all-domain warfare compounds the complexity of controlling heterogeneous networks. MINC embraces these challenges by introducing the mosaic warfare concepts of optionality, diversity, and rapid adaptability to the orchestration of networks of networks. The MINC program will realize on-demand connectivity between kill web services by focusing on the development and integration of three key capabilities: 1) Creating an always-on network overlay to access available networking and communications resources and control parameters; 2) Using a cross-network approach for optimizing and managing network configuration and information flows; and 3) Creating a mission-driven approach in determining the critical information flows for kill web services. Amendment 1: Removes the deliverable entitled Phase 3 Demonstrations and Experiments, Software and User Guide , due at Month 45, from Table 6, Phase 3 Deliverables (page 24), and moved the due date for Phase 3 Final Report from Month 48 to Month 42 (After Contract Award), in Table 6, Phase 3 Deliverables (page 24). Amendment 2: Please see page 2 of the amendment for a summary of changes.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:HR001121S0028
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 8×
    Pre-SolicitationCurrentApr 28, 2021

    Mission-Integrated Network Control (MINC)

    Notice e3be8ed927814e29b0c20e14481d0434 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

HR001121S0028

Archive Date

Nov 26, 2021

Office Address

ARLINGTON, VA, 222032114