GovChime
Notice ID: 7fdccc08dacc4a079b622da2574a2f75Sources Sought

Integrated Battle Command System (IBCS) Modernization

Archived on December 24, 2025. Original response deadline: . Full description on SAM.gov.

Description

Purpose of Amendment 01:

  • Post Q&A
  • Revise Call for Solutions to correct admin errors and revise listing of Non-Government Advisors
  • Submission date remains unchanged of 9 December 2025, 1500 EST

PEO Missiles and Space (PEO MS) supports the Fires Enterprise by integrating sensors, effectors, and fire control into a system-of-systems (SoS) that delivers offensive and defensive fires for the Joint Force.

The IFMC Project Office develops and sustains mission command and fire control capabilities across all Army Air and Missile Defense (AMD) echelons. IFMC closes key operational gaps such as the Single Integrated Air Picture (SIAP), Integrated Fire Control (IFC), and critical asset defense while enabling adaptability against evolving threats.

The Integrated Air and Missile Defense (IAMD) Program builds on this foundation by unifying all Army AMD components into a SoS, delivering operational capabilities not achievable by individual systems. IAMD strengthens homeland defense, protects forces and critical assets, and preserves freedom of action by countering adversary air and missile threats.

At the center of IAMD is the Integrated Battle Command System (IBCS), the Army’s materiel solution that links current and future AMD sensors, effectors, and mission command nodes on a single common network. IBCS consists of Engagement Operations Center (EOC), Integrated Fire Control Network (IFCN) Relays, and integration kits to network-enable current and future AMD components (current IBCS MEIs are shown at the enclosure).

Initial IAMD fielding includes Sentinel A3 and PATRIOT system integration with future expansion to additional sensors and effectors.

See attachment for further instruction. 

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Army
Office:AMC.ACC.ACC-CTRS.ACC RSA.W6QK ACC-RSA
Posted:November 20, 2025
NAICS:Not specified
Last Updated:Aug 21, 2026
PSC:Not specified
Set-Aside:No Set aside used
Type:Sources Sought
Place of Performance:Huntsville, Alabama

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Select documents to download

Showing 4 of 4 items

Document
Source
Agency
Posted Date
File Size
Actions
Sources SoughtDEPT OF THE ARMYNov 20, 2025474.96 KB
Sources SoughtDEPT OF THE ARMYNov 20, 20254.34 MB
Sources SoughtDEPT OF THE ARMYNov 20, 202529.49 KB
Sources SoughtDEPT OF THE ARMYNov 20, 2025427.75 KB

Lifecycle

Solicitation:IBCS_26-01
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. 2×
    Market ResearchCurrentOct 1, 2025

    Integrated Battle Command System (IBCS) Modernization

    Notice 7fdccc08dacc4a079b622da2574a2f75 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

IBCS_26-01

Archive Date

Dec 24, 2025

Office Address

REDSTONE ARSENAL, AL, 35898-5090