GovChime
Notice ID: 7744f034fbe11ce47efd17697a83cde5Solicitation

Rehabilitation of the Upper Brownsville Levee (UBL) in Cameron County, Texas

Archived on August 26, 2014. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 PM UTC+02:00
Posted
August 1, 2012
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction

Notice details

Place of performance
USIBWC Mercedes Field Office, 325 Golf Rd., Mercedes, 78750-9677
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 4, 2025

Identifiers

Solicitation number
IBM12B0005
Notice ID
7744f034fbe11ce47efd17697a83cde5

Description

General Description of the Work - The work for this project generally consists of rehabilitation of approximately 12.0 miles of river levee (REACH 4 of Donna Pump to Brownsville Levee Rehabilitation) in order to meet the Federal Emergency Management Agency's (FEMA) Levee Certification Requirements of National Flood Insurance Program (NFIP) regulations (44 CFR 65.10). This stretch of river levee is situated entirely in Cameron County, Texas and extends along the Rio Grande from the town of San Pedro to near the Gateway International Bridge in Brownsville. Major Construction Tasks -(1) Preparation of right of way (clearing and grubbing) (2) Improvement of existing top of levee (3) Construction of Flex Base (4) Construction of ramps (5) Re-seeding and establishment of vegetation for erosion control on the side slopes of the levee (6) Replacement of sluice gate assemblies inside existing gatewell structures (7) Cleaning and removing debris from openings of culverts, and inlet and outlet structures of the existing gatewell systems (8) Construction of a 3-foot deep cutoff wall under roadway. NOTE: There is a non-mandatory site visit requirement which potential bidders are strongly encouraged to attend (non-mandatory site date visit details to be provided in forthcoming solicitation, which will include the Plans and Specifications attachments on FBO) at the USIBWC Mercedes Field Office, 325 Golf Rd., Mercedes, Texas 78750. Please remember this is only a pre-solicitation notice. The magnitude of this project is between $10,000,000 and $12,000,000. Performance Period - All work shall be completed within four hundred eighty-five (485) calendar days. All flood control levee and structure work, excluding maintenance of seeding, shall be completed within, three hundred sixty-five (365) calendar days. All maintenance of seeding shall be completed within one-hundred twenty (120) calendar days of completion of all other levee work. THIS IS A 100% TOTAL SMALL BUSINESS SET-ASIDE PROJECT.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Ruben Pino
Contracting Officer

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:IBM12B0005
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 12×
    Pre-SolicitationOct 5, 2011

    Rehabilitation of the Upper Brownsville Levee (UBL) in Cameron County, Texas

    Notice ca26ec2454efbb78853d74e6abca5191 on SAM.gov

  2. SolicitationCurrentAug 1, 2012

    Rehabilitation of the Upper Brownsville Levee (UBL) in Cameron County, Texas

    Notice 7744f034fbe11ce47efd17697a83cde5 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

IBM12B0005

Archive Date

Aug 26, 2014