GovChime
Notice ID: b03a3efc46ed48889f192034a5e4eb8aSources SoughtArchived

CFA-608/609 HVAC

Archived on May 1, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:59 PM MDT
Posted
November 19, 2025
Notice type
Sources Sought
Agency
Department of Energy

Notice details

Office
BATTELLE ENERGY ALLIANCE–DOE CNTR
Place of performance
Idaho Falls, Idaho, 83415
Last updated
Nov 6, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
INL-26-007
Notice ID
b03a3efc46ed48889f192034a5e4eb8a

Description

1. INTRODUCTION
Battelle Energy Alliance, LLC (BEA) Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors for the replacement and upgrade of HVAC systems at CFA-608 and CFA-609. These systems are critical to maintaining environmental control and operational reliability in laboratory and high-bay spaces.


2. BACKGROUND
INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. The HVAC systems at CFA-608 and CFA-609 are past their useful life, rely on outdated fuel oil-powered steam boilers, and are increasingly difficult to maintain due to part availability and aging infrastructure.
Work summary will include:
    • CFA-608:
         o Replace the existing steam boiler with an electric boiler
         o Install a global building controller to integrate with the site-wide network
         o Maintain the existing 100% outside air unit and six heating-only fan coils in the high-ceiling lab
     • CFA-609:
          o Replace the existing steam boiler (installed in 1985) with an electric boiler of equivalent capacity
          o Replace the multizone air handling unit (AHU) controls, currently pneumatic, with modern equivalents
          o Maintain the DX coil for colling and steam coil for heating
          o Replace three unit heaters (UH-1: 30,650 BTU/HR; UH-2 & UH-3: 44,109 BTU/HR each)
          o Install a global building controller to tie into the site-wide network


3. PROCESS
This EOI is the first step in identifying interested and qualified vendors. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Quote (RFQ) process for award consideration.

4. SUBMITTAL REQUIREMENTS
Interested vendors should submit an Expression of Interest that includes the following:

    • Company name and point of contact
    • Description of HVAC system capabilities relevant to the CFA-608/609 scope
    • NAICS codes and business size classification
    • Any existing DOE or federal contracting experience (if applicable)

Deadline for submission: 05/01/2026 Submit to: Chase.Egbert@inl.gov
Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFQ solicitation.


5. PROPRIETARY INFORMATION
Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (1)

  • CFA-608-609 HVAC EOI.pdf

    215 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    CFA-608/609 HVAC

    Notice b03a3efc46ed48889f192034a5e4eb8a on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

INL-26-007

Archive Date

May 1, 2026

Office Address

Idaho Falls, ID, 83415