UCEP Integrated Cooling, Piping, Valve, and Instrumentation Systems Services
Archived on May 1, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:30 PM UTC+00:00
- Posted
- April 9, 2026
- Notice type
- Sources Sought
- Set-aside
- No Set aside used
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of Energy
Notice details
- Office
- MSTS – DOE CONTRACTOR
- Place of performance
- Mercury, Nevada
- Last updated
- Aug 21, 2026
Identifiers
- Solicitation number
- KP-26-1
- Notice ID
- 78d95a98906247c9bd04c5e5f7205386
Description
This Source Sought Notice is being posted and is intended only as an Expression of Interest (EOI). This is not a solicitation, and no reimbursement will be made for any costs associated with providing information in response to this notice. The work requested consists of design and construction services at the Nevada National Security Sites (NNSS). The potential offeror(s) will be required to travel and provide construction services to Mission Support and Testing Services (MSTS) at the NNSS.
This Source Sought is for a potential award of a Construction Subcontract. This work will encompass comprehensive flush and test (F/T) services for the new cooling water systems piping, executed precisely according to the design documents. Furthermore, the SUBCONTRACTOR shall be responsible for the end-to-end provision of critical components: including the design, procurement, and fabrication of three Cooling Water Distribution Units (CDWUs), nine associated distribution manifolds, and 25 associated Chilled Doors. This also entails providing all necessary specialty valves, flowmeters, level, pressure, differential pressure, and temperature sensors for various UCEP support systems. Beyond component provision, the SUBCONTRACTOR will furnish highly skilled and technically adequate support for the installation of all components, as well as the identification, vetting, and management of a qualified sub-tier to execute the specialized flush and test services for the entire integrated system. While MSTS's Project Management Office retains oversight of project controls, the inherent complexities of these interconnected systems, coupled with their critical role within the PULSE facility's SCE mission, necessitate a SUBCONTRACTOR with a proven, system-wide understanding and the capability to manage all facets of this integrated effort, rather than fragmented expertise.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
KP-26-1- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentApr 9, 2026
UCEP Integrated Cooling, Piping, Valve, and Instrumentation Systems Services
Similar Opportunities
Additional Details
Solicitation Number
KP-26-1
Archive Date
May 1, 2026
Office Address
North Las Vegas, NV, 89030