GovChime
Notice ID: 5cf0771e3a4945e55e6be4c04878d86dAward NoticeAwarded

RECOVERY--Z--- TANGLE LAKES ACCESS ROAD IMPROVEMENTS

Awarded on May 18, 2010. Full description on SAM.gov.

Awarded tounder L10PC00517 (source: SAM.gov award notice)• $428.2K

Overview

Posted
May 18, 2010
Notice type
Award Notice
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of the InteriorBUREAU OF LAND MANAGEMENT

Notice details

Office
OREGON STATE OFFICE
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
May 18, 2010
Award amount (SAM.gov award notice)
$428.2K

Identifiers

Solicitation number
L10PS01969
Notice ID
5cf0771e3a4945e55e6be4c04878d86d
Award number (PIID)
L10PC00517

Description

No Description Provided

Full description on SAM.gov

Award Overview

Award Number

L10PC00517

Award Amount (SAM.gov award notice)

$428.2K

Award Date

May 18, 2010

Awardee

Original Solicitation

Notice ID: 5cf0771e3a4945e55e6be4c04878d86d

Posted Date: May 18, 2010

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Shapiro, Steven D 503-808-6227, sshapiro@blm.gov Shapiro, Steven D

Documents

No documents available.

Lifecycle

Solicitation:L10PS01969
  1. Pre-Solicitation
  2. Awarded

This opportunity has been awarded.

  1. 5×
    Pre-SolicitationFeb 11, 2010

    RECOVERY--Z--- TANGLE LAKES ACCESS ROAD IMPROVEMENTS

    Notice 1867012116f3aadf0ea19b34e801a6ef on SAM.gov

  2. AwardedCurrentMay 18, 2010

    RECOVERY--Z--- TANGLE LAKES ACCESS ROAD IMPROVEMENTS

    Notice 5cf0771e3a4945e55e6be4c04878d86d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Cripple Creek Veg Management Roads Reconstruction CHUGACH NF This project includes subgrade construction, unsuitable material excavation and endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing,disposal site contouring, switchback realignment, waterbar construction and reconstruction,and all other work required to get these roads to a condition to place aggregate surface materials. Option item is road surfacing. Questions Due:11/20 Proposals due: 12/04/2026 1700 PT
-Combined Synopsis12/04/2026
-AwardedOpen
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number: 1240BE27Q0007 is issued as a Request for Quotation (RFQ) Project: USFS, Dakota Prairie Grasslands, Little Missouri NG Road Maintenance This acquisition is set-aside for Small Business concerns. The applicable North American Industry Classification Standard Code is 237310 Highway, Street, and Bridge Construction, Subdivision 13 – Repair and Maintenance. The small business size standard is $45 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation to be considered by the Agency. Award Type: It is anticipated that a Firm Fixed Price Purchase Order will be awarded as a result of this synopsis/solicitation. The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items. Statement of Requirement: Project consists of performing annual road, campground road, and trailhead maintenance throughout the National Forest System Roads and Trailheads within the Little Missouri National Grassland. The Contractor shall furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the Performance Work Statement (PWS), Attachment 3. All work shall be performed in accordance with all applicable codes, and standards. Schedule of Items See Attachment 2 - Schedule of Items. Complete the Schedule of Items with quoter’s business information and pricing. Unit of Issue: Mile=MI or LM (lane mile), Cubic Yard=CY, Lump Sum=LS, Each=EA The quantities specified in the Schedule of Items are estimates only and not guaranteed quantities. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract, or Lump Sum quantity. No payment will be made for work performed more than that staked, ordered, or otherwise authorized. Location: All work performed National Forest System Roads and Trailheads within the Little Missouri National Grassland in Golden Valley, Billings, Slope, and McKenzie Counties, North Dakota Vicinity Map included (see Attachment 4) Estimated Start Work Date: Spring 2027 Period of Performance: Date of Award through November 15, 2027 VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM TO RECEIVE A CONTRACT AWARD. This registration can take a multiple weeks to complete. If you are interested in quoting this project, start registration immediately, at website www.sam.gov. If you need assistance with registration, reach out to the the APEX Accelerator referenced above. Questions shall be submitted via email to paula.winningham@usda.gov and are due no later than three days prior to quote due date and time. To respond to this quote, email the following documents to paula.winningham@usda.gov: 1) Attachment 2 – Schedule of Items – filled in and signed. Include your Unique Entity ID (UEI #) issued from www.sam.gov on form. 2)Your written response to the Evaluation Factors. The Factors are found within the first five pages of the Solicitation document. Adobe Acrobat or Word documents accepted. Failure to respond to evaluation factors will result in exclusion from the evaluation. 3) Attachment 7 SF-1449: Sign Blocks 17a and 30 a, b, and c QUOTE PACKAGE IS DUE BY DECEMBER 1, 2027, 2PM PACIFIC STANDARD TIME
-Combined Synopsis12/01/2026
OR FS FREWN602 28(1), Road 28 Reconstruction Total Small Business Set-Aside This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches. Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February 2027 Tentative Fixed Completion Date: Base: July 2027 Option X: July 2027 Option Y: September 2027 Option Z: August 2027 INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (IFB) (specifications and plans) will be posted at this link.
-Pre-SolicitationOpen
*** 20 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment affects changes to the Block 14 (Description of Amendment/Modification): CHANGE IN SOLICITATION SPECIFICATIONS: Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS Paragraph 1.18.4 Traffic Control Plan (TCP) edited. CHANGE IN SOLICITATION ATTACHMENTS: Attachment A16 BN NL Bridge As Builts_combined drawings edited. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 14 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment affects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 01 45 00.00 25 QUALITY CONTROL Paragraph 3.8.1 GOVERNING FIELD TESTING STANDARDS AND FREQUENCIES added. Solicitation Specifications, Section 03 30 00.00 99 CAST-IN-PLACE REINFORCED CONCRETE Paragraph 3.13.1 GENERAL added. Remove drawing C-104 and replace with C-104 - MARK 1 - AMD-0006 – UPDATE TO DEMOLITION NOTES. Remove drawing C-106 and replace with C-106 - MARK 1 - AMD-0006 – UPDATE TO PAVING AREA AND NOTES, MARK 2 - AMD-0006 – UPDATE TO DEFINE FENCING AND GATE. Remove drawing C-102 and replace with C-102 – MARK 1 - AMD-0006 – UPDATE TO DEMOLITION NOTES. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 01 October 2026 - Amendment W9127N26BA0240005 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): The Solicitation Period is extended by 21 calendar days which changes the Solicitation Closing Date from October 8, 2026, to October 29, 2026. Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS, Paragraph 1.18.4 Traffic Control Plan (TCP) edited. Solicitation Specifications, Section 01 45 00.25 25 CONSTRUCTION MANAGEMENT PLATFORM (CMP), Technical Section added in its entirety. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 18 September 2026 - Amendment W9127N26BA0240004 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 31 68 13.00 99 – GROUND ANCHORS, Part 1 GENERAL, Paragraph 1.5.2 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 31 73 20.00 99 – JET GROUTING, Part 1 GENERAL, Paragraph 1.7.1 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 00 73 00 – Supplementary Conditions, Paragraph L. - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), the Period of Performance is amended as detailed in the SUMMARY OF CHANGES. This will allow for work to occur during the 2029 and 2030 In Water Work Window years. Environmental permits remain unchanged by this amendment. Marine Mammal protections as listed in the specification, and as governed by the IHA, included with the Attachments, remain in effect for the permitted years. No in water work, that is governed by IHA, will be allowed beyond the IHA permit years allowed. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 09 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 01 57 19.00 25 - TEMPORARY ENVIRONMENTAL CONTROLS, Part 3 EXECUTION, Paragraph 3.4.3 PROFESSIONAL ARCHAEOLOGICAL MONITOR. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specifications, Section 00 21 13 – Instruction to Bidders, and Section 00 21 00 – Instructions. Additionally, it extends the solicitation period and provides for an additional site visit. The Solicitation Period is extended by 20 calendar days which changes the Solicitation Closing Date from September 18, 2026, to October 8, 2026. Site Visit Registration. Send an email to Michael R. Carl via email at michael.r.carl@usace.army.mil and Courney R. Hollins at courtney.r.hollins@usace.army.mil by COB Wednesday, 09 September 2026, to register for the site visit and provide first name, last name, and company/organization name. Site visit attendees must be U.S. citizens and possess a REAL ID to access the site. Acceptable forms of proof of citizenship for anyone born outside the USA are: US Birth Certificate: Must be certified & issued by either a US State or the US State Department. US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current. US Certificate of Citizenship: Issued by US Citizenship and Immigration Service. Consular Report of Birth Abroad: Issued by the US State Department. US Naturalization Certificate: Issued by US Citizenship and Immigration Service. Enhanced Driver’s License: from Michigan, Minnesota, New York, Vermont, or Washington. Acceptable ID: Real ID driver’s license. Enhanced driver’s license. Federal Identification Cards PIC/CAC/PIV/Etc. Transportation Worker Identification Card (TWIC). United States Passport or United States Passport Card. Driver’s license issued by the Department of State. *** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file “Power Line Layout” is provided for the Contractor’s information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence. The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
-Solicitation10/29/2026

Additional Details

Solicitation Number

L10PS01969

Archive Date

Jun 2, 2010