GovChime
Notice ID: 615dc138bc331a68647cd078254e88eeSolicitation

Y--PDO-INTRABASIN WATER MANAGEMENT PROJECT

Archived on October 14, 2012. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
September 12, 2012
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of the InteriorBUREAU OF LAND MANAGEMENT

Notice details

Office
ARIZONA STATE OFFICE
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
L12PS01121
Notice ID
615dc138bc331a68647cd078254e88ee

Description

Bureau of Land Management (BLM) - Arizona has a requirement to repair erosion damage to the repository cap at the Saginaw Hill Mine Site. A mine waste repository was completed at the Saginaw Hill Site in August 2009. The mine wastes held in the repository contain hazardous metals including lead and arsenic. The repository includes a two acre earthen cap. The cap shows poor vegetation growth as a result of erosion with rills forming in the cover material. Rills up to two feet deep have developed in the cover material. The cap is a multilayer earthen cap comprised of a compacted clay layer with a geotextile layer overlain with more clay and includes a cover system comprised of fill material and topsoil. A layer of orange construction site fencing was placed on the surface of the upper clay layer to act as an erosion indicator. The erosion rills have cut the topsoil and fill layers but have not reached the upper clay layer. The toe of the repository cap is protected by riprap. Approximately 150 yards of cover material has eroded and approximately 50 yards of riprap has eroded. This Work will repair the erosion damage by filling the voids caused by erosion with topsoil, surface preparation for and seeding the entire two (2) acres and replacing the riprap along the toe of the repository cap. Incidental work includes repairing cuts in the 4- strand, barbed-wire fence that the Contractor must make in order to access the cap. The Saginaw Hill Site is located on the north side of W Valencia Road opposite the Casino Del Sol casino in Tucson, AZ.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Shawna R. Rogers

Documents

No documents available.

Lifecycle

Solicitation:L12PS01121
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 6×
    Pre-SolicitationAug 1, 2012

    Y--PDO-INTRABASIN WATER MANAGEMENT PROJECT

    Notice 0a5acd3cc05020e5897901996b39306a on SAM.gov

  2. SolicitationCurrentSep 12, 2012

    Y--PDO-INTRABASIN WATER MANAGEMENT PROJECT

    Notice 615dc138bc331a68647cd078254e88ee on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

L12PS01121

Archive Date

Oct 14, 2012