Notice ID: 615dc138bc331a68647cd078254e88eeSolicitation
Y--PDO-INTRABASIN WATER MANAGEMENT PROJECT
Archived on October 14, 2012. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- September 12, 2012
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of the InteriorBUREAU OF LAND MANAGEMENT
Notice details
- Office
- ARIZONA STATE OFFICE
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- L12PS01121
- Notice ID
- 615dc138bc331a68647cd078254e88ee
Description
Bureau of Land Management (BLM) - Arizona has a requirement to repair erosion damage to the repository cap at the Saginaw Hill Mine Site. A mine waste repository was completed at the Saginaw Hill Site in August 2009. The mine wastes held in the repository contain hazardous metals including lead and arsenic. The repository includes a two acre earthen cap. The cap shows poor vegetation growth as a result of erosion with rills forming in the cover material. Rills up to two feet deep have developed in the cover material. The cap is a multilayer earthen cap comprised of a compacted clay layer with a geotextile layer overlain with more clay and includes a cover system comprised of fill material and topsoil. A layer of orange construction site fencing was placed on the surface of the upper clay layer to act as an erosion indicator. The erosion rills have cut the topsoil and fill layers but have not reached the upper clay layer. The toe of the repository cap is protected by riprap. Approximately 150 yards of cover material has eroded and approximately 50 yards of riprap has eroded. This Work will repair the erosion damage by filling the voids caused by erosion with topsoil, surface preparation for and seeding the entire two (2) acres and replacing the riprap along the toe of the repository cap. Incidental work includes repairing cuts in the 4- strand, barbed-wire fence that the Contractor must make in order to access the cap. The Saginaw Hill Site is located on the north side of W Valencia Road opposite the Casino Del Sol casino in Tucson, AZ.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Shawna R. Rogers
Documents
No documents available.
Lifecycle
Solicitation:
L12PS01121- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 6×Pre-SolicitationAug 1, 2012
Y--PDO-INTRABASIN WATER MANAGEMENT PROJECT
- SolicitationCurrentSep 12, 2012
Y--PDO-INTRABASIN WATER MANAGEMENT PROJECT
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
L12PS01121
Archive Date
Oct 14, 2012