Z--West Fork Brummet Creek Road Culverts Replacement

Archived on January 1, 2022. Full description on SAM.gov.

Overview

Posted
May 25, 2017
Notice type
Special Notice
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of the InteriorBUREAU OF LAND MANAGEMENT

Notice details

Office
OREGON STATE OFFICE
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
L17PS00347
Notice ID
ebbbd74ffd6c2eca1638dc64b08652c7

Description

Bid Abstract for Solicitation L17PS00347 West Fork Brummet Creek Road Culvert Replacement

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Chen, Lily

Documents

No documents available.

Lifecycle

Solicitation:L17PS00347
  1. Pre-Solicitation
  2. Solicitation
  1. 4×
    Pre-SolicitationMar 30, 2017

    Z--WEST FORK BRUMMET CK RD ERFO

    Notice c74030a01f97f03a98822fb841ac48c0 on SAM.gov

  2. SolicitationMay 17, 2017

    Z--WEST FORK BRUMMET CK RD ERFO

    Notice ae9751a5e55638d1ad0ed00bd6299e19 on SAM.gov

  3. Special NoticeCurrentMay 25, 2017

    Z--West Fork Brummet Creek Road Culverts Replacement

    Notice ebbbd74ffd6c2eca1638dc64b08652c7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Only Civil/Paving MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
66%
Combined Synopsis12/01/2026
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
66%
Solicitation11/17/2026
Cripple Creek Veg Management Roads Reconstruction CHUGACH NF This project includes subgrade construction, unsuitable material excavation and endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing,disposal site contouring, switchback realignment, waterbar construction and reconstruction,and all other work required to get these roads to a condition to place aggregate surface materials. Option item is road surfacing. Questions Due:11/20 Proposals due: 12/04/2026 1700 PT
62%
Combined Synopsis12/04/2026
SOLICITATION ID: 6982AF27B000004 PROJECT NUMBER: CO FTNP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities. SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. The site is accessible on foot a quarter mile past the locked gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100’ west of the bridge. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10’ wide x 48’ long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68” dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – December 2026 NTP – December 2026 Contract Completion – November 2027 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.
60%
Solicitation10/27/2026
Project: AK NPS DENA 10(64), Re-pave Riley Creek CG Roads This work consists of: Aggregate base, paving, striping and pavement repairs of the Riley Creek Campground in Denali National Park and Pavement repairs along the park Road. Project Location: This project is located approximately 125 Miles SW of Fairbanks, AK. Project Length: 2.02 Miles Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: Fall 2026/ Winter 2027 Tentative Fixed Completion Date: Fall 2027 INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220. THIS SOLICITATION IS OFFERED AS A FULL AND OPEN. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link. See attachments for additional information.
60%
Pre-SolicitationOpen

Additional Details

Solicitation Number

L17PS00347

Archive Date

Jan 1, 2022