Backflow Preventer Assemblies
Archived on October 6, 2026. Original response deadline: . Full description on SAM.gov.
Description
Marine Corps Air Station, Installation, Logistics and Environmental Department has a requirement to replace Backflow Preventers to comply with Arizona Department of Environmental Quality (ADEQ) cross-connection-control and backflow-prevention requirements under Arizona Administrative Code R18-4-215.
The contractor shall provide backflow-prevention assemblies see Exhibit A for required items. All items must be Brand Name or Equal to required items in Exhibit A. See all attached documents.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (6)
- Download
D1-M0068126Q0096.pdf
1.8 MBAdded in Solicitation version 3Posted - Download
A1-B Backflow Spec sheets.pdf
1.3 MBAdded in Solicitation version 3Posted - Download
A1-Series 009RP Watts.pdf
336 KBAdded in Solicitation version 3Posted - Download
A1-Series 957RP Watts.pdf
312 KBAdded in Solicitation version 3Posted - Download
A1-Minimum Salient Characteristics.pdf
88 KBAdded in Solicitation version 3Posted - Download
A1-Exhibit A-54 BACKFLOW ORDER.pdf
49 KBAdded in Solicitation version 3Posted
Lifecycle
- 3Version 3SolicitationArchivedCurrent
Backflow Preventer Assemblies
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
M0068126Q0096
Archive Date
Oct 6, 2026
Office Address
CAMP PENDLETON, CA, 92055-5001