DRAFT SOLICITATION - USACE SPK DB Construction NSA-U Consolidation Mission Facility - Camp Williams, Utah
Archived on September 15, 2026. Original response deadline: . Full description on SAM.gov.
Superseded — see the current version
Overview
- Response deadline
- 10:00 AM PDT
- Posted
- July 7, 2026
- Notice type
- Special Notice
- Set-aside
- No Set aside used
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH PACIFIC.ENDIST SACRAMENTO.W075 ENDIST SACRAMENTO
- Place of performance
- Bluffdale, Utah, 84065
- PSC
- Y1AZ: CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- None assigned
- Notice ID
- 376126073c484aac9701536df37c6485
Description
THIS IS A DRAFT REQUEST FOR PROPOSALS (RFP) PROVIDED FOR INFORMATIONAL PURPOSES ONLY. This notice is issued solely for advance planning and to provide the construction industry with early visibility into upcoming requirements. It does not constitute a Request for Proposals (RFP) nor does it commit the Government to solicit or award a contract as a result of this posting.
QUESTIONS AND FEEDBACK ARE NOT BEING ACCEPTED AT THIS TIME. The Government will not respond to any inquiries, comments, or questions regarding these draft documents. Submitted questions, feedback, or unsolicited submissions will not be reviewed or provided response.
PROJECT DESCRIPTION: The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a forthcoming solicitation for design-build (DB) construction services for the National Security Agency-Utah (NSA-U) Consolidation Mission Facility (CMF) at Camp Williams, Utah. Draft solicitation and requirements documents are being posted to allow potential Offerors time to familiarize themselves with the anticipated scope of work prior to issuance of the solicitation.
PROJECT SCOPE: The proposed construction project includes, but is not limited to all design and construction services requirement to build new mission and support facilities at the NSA-U campus, including:
• A multi-story, secure Mission Facility built to Intelligence Community Directive (ICD) 705 Sensitive Compartmented Information Facility (SCIF) standards.
• An unclassified Commons Facility to provide workforce support amenities and mission-support functions.
• A structured parking facility and new Vehicle Control Point (VCP).
• All required supporting facilities, site work, environmental measures, and infrastructure.
FUTURE SOLICITATION INFORMATION: The Government anticipates issuing the solicitation on or about July 2026. Once the RFP is published, a specific window for formal Requests for Information (RFIs) will be established. Interested parties are responsible for monitoring the www.SAM.gov website for the official solicitation release, subsequent amendments, or further updates.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (10)
- Download
B08 - DRAFT W9123826RA012 - 20260707 v2.pdf
6.9 MBAdded in Special Notice version 4Posted - Download
B08 - W9123826RA012 A01 - DRAFT Plans Vol 1 - NSA-U CMF Site - 20260521.pdf
112 MBAdded in Special Notice version 4Posted - Download
B08 - W9123826RA012 A02 - DRAFT Plans Vol 2 - NSA-U CMF Admin Facility - 20260521.pdf
96 MBAdded in Special Notice version 4Posted - Download
B08 - W9123826RA012 A03 - DRAFT Plans Vol 3 - NSA-U CMF Commons Facility - 20260521.pdf
37 MBAdded in Special Notice version 4Posted - Download
B08 - W9123826RA012 A04 - DRAFT Plans Vol 4 - NSA-U CMF Parking - 20260521.pdf
118 MBAdded in Special Notice version 4Posted - Download
B08 - W9123826RA012 A05 - DRAFT Plans Vol 5 - NSA-U CMF Vehicle CP - 20260521.pdf
3.9 MBAdded in Special Notice version 4Posted - Download
B08 - W9123826RA012 A06 - DRAFT Specification 2585 Vol 1 - NSA-U CMF - 20260521.pdf
5.5 MBAdded in Special Notice version 4Posted - Download
B08 - W9123826RA012 A07 - DRAFT Specification 2585 Vol 2 - NSA-U CMF - 20260521.pdf
30 MBAdded in Special Notice version 4Posted - Download
B08 - W9123826RA012 A11 - DoL CWRR UT20260085 - 20260518.pdf
617 KBAdded in Special Notice version 4Posted - Download
B08 - W9123826RA012 A12 - SF 330 - AE Qualifications - 20210701.pdf
1.0 MBAdded in Special Notice version 4Posted
Lifecycle
- 3Version 3PresolicitationArchived
USACE SPK Design Build (DB) Construction, NSA-U Consolidation Mission Facility, Utah
- 4Version 4Special NoticeArchivedCurrent
Type changed from Presolicitation to Special Notice
DRAFT SOLICITATION - USACE SPK DB Construction NSA-U Consolidation Mission Facility - Camp Williams, Utah
- 5Version 5Special NoticeArchived
DRAFT SOLICITATION - USACE SPK DB Construction NSA-U Consolidation Mission Facility - Camp Williams, Utah
Similar Opportunities
Additional Details
Solicitation Number
Not available
Archive Date
Sep 15, 2026
Office Address
SACRAMENTO, CA, 95814-2922