GovChime
Notice ID: 5bdfaa2bc67b442cd77bf4e481e00b86Justification and Approval (J&A)Awarded

19--LHA-7 Long Lead Time Material, Advanced Engineering and Planning Services and Special Studies

Awarded on June 30, 2010. Full description on SAM.gov.

Overview

Posted
July 14, 2010
Notice type
Justification and Approval (J&A)
NAICS
336611: Ship Building and Repairing

Notice details

Place of performance
1000 Access Road, Pascagoula, MS 39567 USA
PSC
19: SHIPS, SMALL CRAFT, PONTOON, DOCKS
Last updated
Dec 3, 2025
Award date
Jun 30, 2010
Award amount (SAM.gov award notice)
Not specified

Identifiers

Solicitation number
N0002410R2229
Notice ID
5bdfaa2bc67b442cd77bf4e481e00b86

Description

No Description Provided

Full description on SAM.gov

Award Overview

Award Number

N0002410C2229

Award Amount (SAM.gov award notice)

Not specified

Award Date

Jun 30, 2010

Awardee

Not specified

Original Solicitation

Notice ID: 5bdfaa2bc67b442cd77bf4e481e00b86

Posted Date: Jul 14, 2010

Original Response Deadline: Not specified

Contract Details

No FPDS record matches this award number at the same department yet

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

More From This Vendor

Top 5 most recent

5
  • N0002416C2427
    HUNTINGTON INGALLS INCORPORATED
    Department of DefenseNAICS 336611
    $3.4BSigned Aug 13, 2026
  • N0002416C2427
    HUNTINGTON INGALLS INCORPORATED
    Department of DefenseNAICS 336611
    $3.4BSigned Aug 13, 2026
  • N0002418C2307
    HUNTINGTON INGALLS INCORPORATED
    Department of DefenseNAICS 336611
    $7.0BSigned Aug 13, 2026
  • N0002418C2307
    HUNTINGTON INGALLS INCORPORATED
    Department of DefenseNAICS 336611
    $7.0BSigned Aug 13, 2026
  • N0002418C2307
    HUNTINGTON INGALLS INCORPORATED
    Department of DefenseNAICS 336611
    $7.0BSigned Aug 13, 2026

Contacts

Contracting Officer

Primary Contact

Linda C. Squires 202-781-3942 linda.squires@navy.mil

Documents

No documents available.

Lifecycle

Solicitation:N0002410R2229
  1. Pre-Solicitation
  2. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationFeb 3, 2010

    19--ISSUANCE OF REQUEST FOR PROPOSAL FOR ADVANCE PROCUREMENT OF LONG-LEAD-TIME MATERIAL, DESIGN ENGINEERING SERVICES, ASSOCIATED SPECIAL STUDIES, AND CONSTRUCTION OF LHA 7 AMPHIBIOUS ASSAULT SHIP

    Notice 305989c5e49c6d067ec4806410ad010b on SAM.gov

  2. OtherCurrentJul 14, 2010

    19--LHA-7 Long Lead Time Material, Advanced Engineering and Planning Services and Special Studies

    Notice 5bdfaa2bc67b442cd77bf4e481e00b86 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Proposed procurement for NSN 1005011140080 BREECH ASSEMBLY: Line 0001 Qty 18 UI AY Deliver To: DLA DISTRIBUTION PUGET SOUND By: 0296 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: DLA DISTRIBUTION PUGET SOUND By: 0090 DAYS ADO All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
-Combined Synopsis11/23/2026
The Southwest Regional Maintenance Center (SWRMC) intends to issue Request for Proposal (RFP) No. N5523627R0001 to accomplish the Commercial Industrial Services (CIS) Heat Exchanger and Cooler Cleaning Support Follow-on MAC-IDIQ in support of U.S. Navy ships within a 50-mile radius of San Diego, CA. The offeror(s) shall provide labor, equipment, services and materials for the cleaning (high-pressure water jet, mechanical, and/or acid) of various shell-and-tube type heat exchangers, condensers, and/or coolers onboard U.S. Navy ships within a 50-mile radius of San Diego, CA. The offeror(s) is responsible for the use of the latest revision of all references, specifications, and NAVSEA Standard Items. This will be a multiple award contract (MAC), indefinite-delivery, indefinite-quantity (IDIQ) type contract with five (5) ordering year periods. This will be a total Small Business Set-Aside and the applicable NAICS code 336611, Ship Building and Repairing (the small business size standard is 1,300 in number of employees). Award will be based on a best-value procurement utilizing past performance, technical, and price as evaluation factors. FAR 52.216-27 Single or Multiple Awards (OCT 1995) applies. This is a follow-on procurement. All responsible sources may submit a proposal, which shall be considered by this agency. The successful offeror(s) will be required to have a Southwest Regional Maintenance Center approved Quality System (IAW NAVSEA Standard Item 009-004), approved and in place at the time of contract award. Offerors that are interested in this procurement may send an e-mail providing all point of contact information (company name and address, CAGE code, primary and secondary points of contact, telephone phone number, and e-mail addresses) to 410B_RFP_27R0001_CIS_Heat_Exchanger@us.navy.mil and subsequently will receive a courtesy notification when the solicitation is posted.
-Pre-Solicitation11/24/2026
This is a combined synopsis/solicitation for commercial items, prepared in accordance with the format in subpart 12.6 of the FAR Part 12 - Acquisition of Commercial Products and Commercial Services | Acquisition.GOV and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 70ZU0327Q50475B00 applies and is used as a Request for Quote (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01, effective, 13 MARCH 2026. It is anticipated that a Best Value purchase order shall be awarded as a result of this synopsis/solicitation. All responsible sources may submit a quotation, which if timely received, shall be considered by this agency. Best Value will be evaluated by who can provide the complete requirement, who meets our required time frame and by price. All vendors providing a quotation must either have an active SAM.Gov registration or provide proof they have submitted their entity for registration. Payments are NET 30 and will be made in accordance with the FAR 52.232-25 Prompt payment clause 52.232-25 Prompt Payment. | Acquisition.GOV. The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) intends to award a Firm Fixed Price Purchase Order. The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: Vendor Information: Vendor shall provide: ITEM 1: FILTER ELEMENT, FLUI NSN: 2940-20-014-2093 MFG NAME: JASTRAM ENGINEERING LTD. P/N: JB-547025 QUANTITY: 100 EA UNIT PRICE: TOTAL AMOUNT: REQUIRED DELIVERY DATE ON OR BEFORE: ON OR BEFORE. 01/28/2027 PROMISED DELIVERY DATE: _________________ * Delivery address and terms stated below. * *Any proposed substitutions must be accompanied by a Specification Sheet to undergo evaluation by the requiring officials for compatibility to the Requirement. * *All Deliveries are Required by their respective due date. Partial shipment is acceptable. ** Total cost shall have delivery, and any Freight charges included. ** ** SHIPPING: FOB DESTINATION REQUIRED. ** Preparation For Delivery All material must be shipped to: FOB DESTINATION UNITED STATES COAST GUARD(SFLC) RECEIVING ROOM- BLDG 88 2401 HAWKINS POINT ROAD BALTIMORE MD 21226. for this Purchase Order. Material must be accompanied by an itemized packaging list securely attached to the outside of the shipment. All packing lists shall cite the Purchase Order Number with the packaging in such a manner to ensure identification of the material provided. Material shall be packed for shipment using Military Packaging, for example in packaging please reference MIL-STD-2073-1E. Material must be packaged in such a manner as to afford adequate protection to the item against corrosion, deterioration, and physical damage during shipment from the supply course to Surface Forces Logistics Center locations. Packaging shall provide adequate protection for warehouse storage and shipments from the warehouse. All materials shall be marked in accordance with MIL-STD-129R and barcoded unless otherwise authorized by the Contracting Officer. All material will have the Purchase Order Number, National Stock Number (if applicable), Vendor name and Part Number clearly marked on the exterior of all material shipped. All Deliveries are to be made Monday through Friday between the hours of 7:00AM to 1:00PM. Please make sure that Quotes, any changes in Delivery Timeframes or tracking information get sent to YANNICK KASSI at Yannick.a.kassi@uscg.mil no later than 11/25/2026 Invoicing In IPP It is a requirement that all invoicing for Purchase Orders will now be entered and processed through https://www.ipp.gov. All invoices must contain the following information: CG Purchase Order number, vendor’s invoice number, cage number, PO item number, description of supplies or services, unit prices and extended totals (INVOICES FOR PURCHASE ORDERS AWARDED BY SURFACE FORCE LOGISTICS CENTER, BALTIMORE ARE TO BE SUMITTED AS NON-PO IN IPP). Shipping costs will be indicated as a separate line item on the invoice (if applicable). Shipping costs of $100 or more must be accompanied by a separate freight invoice when submitting an invoice(s) for payment (if applicable). To submit an invoice, the vendor must have access to www.ipp.gov. To gain access please indicate if you don’t have an account so the issuing office can establish one for you. Far Clauses This order is subject to but is not limited to the following Federal Acquisition Regulations: 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. 52.204-26 Covered Telecommunications Equipment or Services-Representation. 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services. 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services
-Combined Synopsis11/25/2026
This is a combined synopsis/solicitation for commercial items, prepared in accordance with the format in subpart 12.6 of the FAR Part 12 - Acquisition of Commercial Products and Commercial Services | Acquisition.GOV and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 70Z0U0327Q50472B00 applies and is used as a Request for Quote (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01, effective, 13 MARCH 2026. It is anticipated that a Best Value purchase order shall be awarded as a result of this synopsis/solicitation. All responsible sources may submit a quotation, which if timely received, shall be considered by this agency. Best Value will be evaluated by who can provide the complete requirement, who meets our required time frame and by price. All vendors providing a quotation must either have an active SAM.Gov registration or provide proof they have submitted their entity for registration. Payments are NET 30 and will be made in accordance with the FAR 52.232-25 Prompt payment clause 52.232-25 Prompt Payment. | Acquisition.GOV. The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) intends to award a Firm Fixed Price Purchase Order. The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: Vendor Information: Vendor shall provide: ITEM 1: EXHAUST RISER NSN: 2815-01-627-1486 MFG NAME: CUSTOM MARINE ACQUISITION EXHAUST DRY RISER, FOR YANMAR 6LP, INCLUDES FOIL INSULATION BLANKET. INDIVIDUAL PACKAGE IN ACCORDANCE WITH MIL-STD-2073-1E METHOD 10, CUSHIONING MATERIALS, DUNNAGE, BLOCKING AND BRACING SHALL BE APPLIED AS REQUIRED TO PROTECT THE ITEMS AND THE ENCLOSED MEDIA AND RESTRICT THE MOVEMENT OF THE ITEM WITHIN THE CONTAINER. EACH ITEM SHALL BE INDIVIDUALLY PACKAGED IN A RIGID CONTAINER COMPLIANT WITH ASTM D3951 OR MIL-STD-2073-1 LEVEL B AND MARKED PER MIL-STD-129, ENGINEERED TO SURVIVE WAREHOUSE STORAGE AND MULTIPLE RESHIPMENT CYCLES WITHOUT REPACKING; UNBOXED ITEMS WRAPPED SOLELY IN BUBBLE WRAP OR FLEXIBLE FILM ARE STRICTLY NON-COMPLIANT AND SUBJECT TO REJECTION. MULTIPACK IS ACCEPTABLE, WHERE APPLICABLE. ITEMS INDIVIDUALLY PACKAGED, SHIPPED IN SAME CONTAINER. MARKING IAW MIL-STD-129R EXCEPT BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. P/N: 39605 QUANTITY: 30 EA UNIT PRICE: TOTAL AMOUNT: REQUIRED DELIVERY DATE ON OR BEFORE: ON OR BEFORE. 12/12/2027 PROMISED DELIVERY DATE: _________________ * Delivery address and terms stated below. * *Any proposed substitutions must be accompanied by a Specification Sheet to undergo evaluation by the requiring officials for compatibility to the Requirement. * *All Deliveries are Required by their respective due date. Partial shipment is acceptable. ** Total cost shall have delivery, and any Freight charges included. ** ** SHIPPING: FOB DESTINATION REQUIRED. ** Preparation For Delivery All material must be shipped to: FOB DESTINATION UNITED STATES COAST GUARD(SFLC) RECEIVING ROOM- BLDG 88 2401 HAWKINS POINT ROAD BALTIMORE MD 21226. for this Purchase Order. Material must be accompanied by an itemized packaging list securely attached to the outside of the shipment. All packing lists shall cite the Purchase Order Number with the packaging in such a manner to ensure identification of the material provided. Material shall be packed for shipment using Military Packaging, for example in packaging please reference MIL-STD-2073-1E. Material must be packaged in such a manner as to afford adequate protection to the item against corrosion, deterioration, and physical damage during shipment from the supply course to Surface Forces Logistics Center locations. Packaging shall provide adequate protection for warehouse storage and shipments from the warehouse. All materials shall be marked in accordance with MIL-STD-129R and barcoded unless otherwise authorized by the Contracting Officer. All material will have the Purchase Order Number, National Stock Number (if applicable), Vendor name and Part Number clearly marked on the exterior of all material shipped. All Deliveries are to be made Monday through Friday between the hours of 7:00AM to 1:00PM. Please make sure that Quotes, any changes in Delivery Timeframes or tracking information get sent to YANNICK KASSI at Yannick.a.kassi@uscg.mil no later than 11/25/2026 Invoicing In IPP It is a requirement that all invoicing for Purchase Orders will now be entered and processed through https://www.ipp.gov. All invoices must contain the following information: CG Purchase Order number, vendor’s invoice number, cage number, PO item number, description of supplies or services, unit prices and extended totals (INVOICES FOR PURCHASE ORDERS AWARDED BY SURFACE FORCE LOGISTICS CENTER, BALTIMORE ARE TO BE SUMITTED AS NON-PO IN IPP). Shipping costs will be indicated as a separate line item on the invoice (if applicable). Shipping costs of $100 or more must be accompanied by a separate freight invoice when submitting an invoice(s) for payment (if applicable). To submit an invoice, the vendor must have access to www.ipp.gov. To gain access please indicate if you don’t have an account so the issuing office can establish one for you. Far Clauses This order is subject to but is not limited to the following Federal Acquisition Regulations: 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. 52.204-26 Covered Telecommunications Equipment or Services-Representation. 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services. 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services
-Combined Synopsis11/25/2026
This is a Sources Sought Notice / Request for Information (RFI) only. This is NOT a Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ). No solicitation is currently available. The U.S. Army Corps of Engineers (USACE), Jacksonville District, is conducting market research to identify potential sources that possess the expertise, capabilities, and experience to meet the requirements for Drydocking and repair services for USACE Vessels. A Virtual Industry Day is currently being contemplated, and a Microsoft Teams Link will be added to this notice. Currently, the Vistural Industry Day is scheduled for 15 December 2026, beginning at 9 am Eastern. A Site Visit is also being contemplated for 7 January 2027. Questions will be due on 17 January 2027 by noon Eastern. The U.S. Army Corps of Engineers - Jacksonville District has a requirement for the following boat troubleshooting and repair services: Hull and Structural Maintenance (per ER 750-1-1): Hull Inspection and Repair: Capability to perform ultrasonic thickness testing, steel plating repair/replacement, underwater hull repairs and cathodic protection testing and anode replacement, window, hatches and door maintenance and repair, and bilge and interior cleaning. Surface Preparation and Coating: Capability to perform abrasive blast cleaning and painting of the underwater body, freeboard, main decks and superstructure. Mechanical and Electrical Systems (per ER 750-1-1): Propulsion and Power: Overhaul and repair of main propulsion engines and auxiliary generators including the diesel engines, outboard gasoline engines, propulsion shaft, propeller, waterjet and rudder repair, HVAC equipment, hydraulic components and load handling equipment, galley and head equipment troubleshooting and repair, and boat trailer maintenance and repair. Piping and Electrical: Maintenance of all vessel piping, electrical installations, and onboard electronic equipment including bridge electronic systems, tank inspection, cleaning and repair, electrical system grooming and repair (12/24vdc and 120/240vac), Safety Systems: Servicing of life-saving appliances, fire detecting/extinguishing equipment, pollution prevention systems, life raft and associated safety equipment service and repair, intrusion detection and CCTV system maintenance and repair. Naval Architects/Marine Engineers to perform naval architecture analysis, determining crane safety, structural integrity, and stability during major conversions or rehabilitation. Qualified Paint/Coating Inspectors to oversee surface preparation and coating applications. These inspectors ensure compliance with standards established by the Steel Structures Painting Council (SSPC) and the National Association of Corrosion Engineers (NACE) / AMP. USCG/ABS certification inspections for vessels holding a Certificate of Inspection (COI) or load line to ensure compliance with Subchapter I and/or American Bureau of Shipping (ABS) classification rule. Marine Surveyor Services accredited by the National Association of Marine Surveyors (NAMS) or the Society of Accredited Marine Surveyors (SAMS) with at least 5 years of experience in commercial marine plant. They perform annual inspections and condition surveys. Marine Chemist to certify tanks and spaces as safe for hotwork/personnel. Vessel characteristics: Vessel Name/Type: Survey Vessel FLORIDA-II Length/Beam/Draft: 62’ / 24’ / 3’ Displacement: 42.5 tons Vessel Name/Type: Survey Vessel SALZER Length/Beam/Draft: 40’ / 13’-6” / 3’ Displacement: 14 tons Vessel Name/Type: Tug LEITNER Length/Beam/Draft: 50’ / 20’ / 8’ Displacement: 51.2 Tons Vessel Name/Type: Tug CHOBEE Length/Beam/Draft: 25’ / 16’ / 6’ Displacement: 25 tons Vessel Name/Type: Barge CFBC-1 Length/Beam/Draft: 104’ / 38’ / 8’ Displacement: 100-150 tons Vessel Name/Type: Barge CN-4 Length/Beam/Draft: 120’ / 45’ / 10’ Displacement: 150-200 tons Vessel Name/Type: Multiple Small Survey Vessels Length/Beam/Draft: 25-40’ / 7-12’ / 19” – 30” Displacement: 2.5 to 10 tons Specific Capabilities may include: Business and Contracting Capabilities (per EP 715-1-8): Experience with Local Conditions: Ability to navigate specific waterways to the facility, handle local environmental constraints, and manage seasonal weather impacts Drydocking and Facility Capabilities: Lifting/Docking/Blocking Capacity: Dimensions and tonnage capacity of the drydock, marine railway, or travel lift to safely accommodate the specific USACE vessel class. Location: Physical location of the shipyard to calculate transit time and fuel costs. Interested firms are asked to email the Contract Specialists, Ms. Brittany Jackson, at brittany.r.jackson@usace.army.mil, or Ms. Kelly Koger, at kelly.l.koger@usace.army.mil.
-Market Research01/17/2027

Additional Details

Solicitation Number

N0002410R2229

Archive Date

Sep 30, 2010