GovChime
Notice ID: 732e344b31e0ff21c276ab951b934446Presolicitation

Z--FACILITIES RESTORATION

Archived on February 22, 2011. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
6:00 AM UTC+01:00
Posted
January 21, 2011
Notice type
Presolicitation
NAICS
236220: Commercial and Institutional Building Construction

Notice details

PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 4, 2025

Identifiers

Solicitation number
N0002411R4310
Notice ID
732e344b31e0ff21c276ab951b934446

Description

The Naval Sea Systems Command anticipates awarding a sole source facilities restoration contract to Alliant Techsystems, Inc., Rocket Center, WV for the restoration of Government-owned buildings, utilities, and facilities located at the Allegany Ballistic Laboratory (ABL) in Rocket Center, WV. This solicitation is contemplated as a sole source procurement with Alliant Techsystems, Inc., as this firm is currently the operator of this Government-owned facility. Firms interested in subcontracting opportunities should contact Mr. Paul Corwell, Alliant Techsystems,lnc., #210 State Route 956, Rocket Center, WV 26726-0210, (304) 726-5050.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Angela Butler-Franco (202) 781-1789 Graham Irby (202) 781-0079

Documents

No documents available.

Lifecycle

Solicitation:N0002411R4310
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. Pre-SolicitationCurrentJan 21, 2011

    Z--FACILITIES RESTORATION

    Notice 732e344b31e0ff21c276ab951b934446 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Only General MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
76%
Combined Synopsis12/02/2026
AMENDMENT 0001 TO SOURCES SOUGHT NOTICE The purpose of this amendment is to announce that an Industry Day will not be held for this requirement due to the high level of interest received in response to the Sources Sought notice. Prospective contractors should continue to monitor SAM.gov for all updates pertaining to this requirement. This amendment is for notification purposes only. Do not respond to this posting. 1. NOTICE AND DISCLAIMER This is a Sources Sought Notice and Request for Information (RFI) issued solely for market research and acquisition planning purposes. It does not constitute a formal Solicitation, Request for Proposal (RFP), or Invitation for Bid (IFB). There are no bid packages, solicitations, specifications, or drawings available with this announcement. It does not constitute a procurement commitment by USACE, implied or otherwise. No contract will be awarded from this Sources Sought Notice. Participation in this RFI is strictly voluntary. No reimbursement will be made for any cost associated with providing information in response to this Sources Sought or any follow-up information requests. Submission of a response does not obligate the Government in any way and will not affect a firm's ability to submit a proposal if a solicitation is issued in the future. If a solicitation is released, it will be synopsized on the Governmentwide Point of Entry (GPE). It is the responsibility of potential contractors to monitor the GPE for additional information pertaining to this requirement. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to contractors regarding their submissions. Additional information may be requested after initial response, either from individual respondents or all respondents. 2. PURPOSE The U.S. Army Corps of Engineers (USACE), Seattle District, on behalf of Joint Base Lewis-McChord (JBLM), is conducting market research to support acquisition of an estimated $300M MATOC to support Facilities Sustainment, Restoration, and Modernization (FSRM) construction efforts. This Market Research will help USACE determine the availability and capabilities of firms working within this NAICS code. The responses to this Notice will also be used to help determine whether a small business or socio-economic set-aside may be suitable to apply to this potential procurement. 3. PROGRAM DESCRIPTION The purpose of this MATOC will be to support primarily general construction activities at JBLM and its sub-installations (Lewis Main, McChord Field, and Yakima Training Center), including but not limited to renovation, repairs, minor building expansions and pre-engineered buildings (not to exceed the statutory limit for new construction), preventative maintenance, environmental abatement, erosion control and earthwork. The JBLM FSRM Program includes operational facilities, training sites, administrative spaces, barracks/troop housing, utility infrastructure systems (HVAC, electrical, fire protection), and site work for JBLM Garrison facilities. Projects will span multiple facility types across JBLM. Task Orders under this MATOC are primarily intended to provide a timely procurement response to general construction work such as remediation of facilities, e.g., maintenance, repair, asbestos and lead-based paint abatement, and minor construction situations relating to but not limited to: civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), and anti-terrorism and force protection. Projects will be primarily general construction activities including but not limited to renovation, repairs, building expansions, and pre-engineered buildings (not to exceed the statutory limit for new construction), or repair by replacement. Scope may also include preventative maintenance, environmental abatement (e.g., asbestos and lead-based paint abatement), erosion control, and earthwork. Construction situations may include but are not limited to civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), fire protection systems, communications systems, and anti-terrorism and force protection. The MATOC may also be used for Task Orders expected to require some Incidental Design Work or extension of design effort by the Contractor, to include, but not be limited to fire alarm systems, fire sprinkler systems, HVAC system installation and balancing, communications systems, structural design of minor facilities or components and licensed professional engineer certification of site adaptation of pre-engineered structures. 4. POTENTIAL ACQUISITION STRATEGY The USACE Seattle District intends to award a MATOC to offerors determined to be qualified in accordance with the evaluation criteria. Aggregate Program Value: Approximately $300 Million ordering capacity, shared among all MATOC contractors. Structure: Qualified firms will be issued a MATOC contract, establishing a pool of multiple contractors available to support JBLM FSRM. Period of Performance: A 5-year base period with a single two (2) year option period. Exercise of options is at the Government's discretion. Project Size and Task Order Limits: The project size for Task Orders under this MATOC are anticipated to be between $250,000.00 and $25,000,000.00, and the average project duration is expected to be between six months to two years. Based on previous similar contracts, the occurrence of Task Orders may be frequent, especially in emergency situations, and during the 3rd and 4th quarters of the Government’s fiscal year. Project Delivery Methods: Projects will primarily be executed using Design-Bid-Build project delivery, with task orders representing the construction portion of project delivery. Task Order Selection: Competition for task orders will be held among all MATOC participants. Source selection methods will be determined for individual projects and may include various prices, performance, schedule or other trade-offs on the best-value spectrum. 5. ANTICIPATED INDUSTRY DAY USACE Seattle District anticipates hosting an Industry Day in the JBLM area on or about 15 October 2026. Exact date, time, location, registration instructions, and agenda will be published (SAM.gov and/or direct distribution to respondents to this RFI) later. Firms that respond to this RFI will be prioritized for Industry Day communications. 6. RESPONSE INSTRUCTIONS Interested parties are requested to submit responses by completing the online questionnaire at: https://forms.osi.apps.mil/r/k6LtDRMKPP The questionnaire is the Government's primary mechanism for obtaining detailed market research needed for determining the number and availability of contractors interested in this acquisition. Interested parties are also asked to submit a brief capabilities statement containing relevant information not otherwise addressed in the questionnaire. Capability statements shall not exceed 5 pages in length. Supplemental capability statements are requested to be submitted via email to the individual(s) listed below no later than 10:00 AM Pacific Time on 20 September 2026. Late responses may still be considered at the Government’s discretion but are not guaranteed review prior to strategy finalization. John McGuire, Contract Specialist Jeffrey Ross, Contracting Officer JBLM Special Projects Branch Contracting Division, Seattle District, Northwestern Division Email: john.e.mcguire@usace.army.mil Subject line: “Sources Sought Response – JBLM FSRM MATOC $300M – [Firm Name]” The Government welcomes candid industry feedback, recommendations, and other considerations that could improve successful execution of this program. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach.
75%
Market Research12/01/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX26Q0069 is issued as a Request for Quotation (RFQ) for the design, removal and replacement of the Barillas Lookout Tower cab with a new cab and lighting protection system. An optional bid item for the Encino Vista Lookout Tower is to replace/install a brand-new comprehensive lightning protection system. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 236220, Commercial and Institutional Building Construction. The small business size standard is $45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The purpose for amendment 00001 is to; 1) Update the Site Visit Dates as follows; a) Barillas Peak Lookout Tower: October 13, Meet at Pecos Ranger District Office @ 9:00am (MST); 32 South Main Street, Pecos, NM 87552, leave office for site by 9:30am (MST) b) Encino Vista Lookout Tower: October 14, Meet at the Coyote Ranger District Office @ 9:00am (MST); 20 Private Drive 1707, Coyote, NM 87012, leave office for site by 9:30am (MST) Provide name of company representative(s) attending the visit to Aaron Trujillo by email aaron.trujillo@usda.gov or phone 575-779-7756. 2) Extend RFI Due Date from 10/01/2026 to 10/19/2026, 2:00 PM Pacific Time. Please submit all RFI's to the following POC's a) Richard Ortega at Richard.ortega@usda.gov b) Troy McCullough at troy.mccullough@usda.gov 3) Extend the Quote Due Date from 10/12/2026 to 11/06/2026, 2:00 PM Pacific Time. Amendment 2 provides the following information: Attachment 2 - Revises/corrects typo's on Schedule of Items Attachment 7 - adds WD NM2026001 Attachment 8 - provides responses to RFI's 001-044 Attachment 9 - provides list of attendees for site visit Attachments 10-17 - requested drawings and specifications
73%
Combined Synopsis11/25/2026
AMENDMENT 2 The purpose of this amendment is to add Attachment 4 Outdoor Fitness Building B-389 Set of Drawings ---------------------------------------------------------------------------------------------------------- AMENDMENT 1 The purpose of this amendment is to add Attachment 3 Spec 26 41 01.0010 Lightning Protection System ----------------------------------------------------------------------------------------------------------- Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support Notice Type: Sources Sought / Market Research Notice Number: HARBSS-2027-01 Contracting Office: 482d CONF/PK Location of Performance: Homestead Air Reserve Base, Florida Response Due Date/Time: November 26, 2026, 5:00 PM EST Response Submission: Nika Salemi, nika.salemi.2@us.af.mil Proposed NAICS Code: 236220, Commercial and Institutional Building Construction Proposed Product Service Code (PSC): 5670 Building Components, Prefabricated 1. Notice Purpose THIS IS A SOURCES SOUGHT NOTICE ISSUED FOR MARKET-RESEARCH AND PLANNING PURPOSES ONLY. THIS NOTICE IS NOT A SOLICITATION, REQUEST FOR PROPOSAL, REQUEST FOR QUOTATION, INVITATION FOR BID, OR COMMITMENT BY THE GOVERNMENT TO AWARD A CONTRACT. The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL, seeks information from capable commercial sources, including all small-business socioeconomic categories, to determine the availability and capability of firms that can perform the requirement described in Attachment 1 KYJM19-9003 Outdoor Fitness SOW, Red Horse Project, 12 Nov 2026. Responses will be used to support acquisition planning, including consideration of the appropriate contract type, acquisition approach, and potential small-business set-aside strategy. The Government will not reimburse respondents for any costs associated with preparation or submission of information in response to this notice. A response to this notice is not required to respond to a future solicitation, if issued. Any future solicitation will be announced separately. 2. Requirement Overview The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL is conducting market research for the Outdoor Fitness Facility, Building 389 project at Homestead Air Reserve Base (HARB), Florida. The anticipated requirement is primarily for the procurement, delivery, and associated submittals for construction materials and equipment required to support construction of an outdoor fitness facility. Air Force RED HORSE personnel will perform the majority of construction and installation activities. Contractor installation responsibilities are limited principally to the steel picket fence and, if applicable, a separate lightning-protection system. The contractor would be expected to: Procure and deliver all materials identified in the Government-furnished bill of materials (BOM), Attachment 2 Outdoor Fitness Facility, BOM Template. Furnish the Pre-Engineered Building (PEB) package, including engineered shop drawings and all associated structure materials. Coordinate concrete-truck deliveries to support Government construction execution. Furnish the specified construction equipment for the required durations, fueled and ready for operation at the work site. Install a new steel picket fence, including site restoration for areas disturbed by fence installation. Install a lightning-protection system if the proposed PEB cannot include a compliant built-in lightning-protection system. The provided BOM identifies, among other materials and equipment, rubber fitness flooring, concrete masonry materials, electrical distribution materials, outdoor fans, motion-activated lighting, concrete, base course, PEB-related items, and construction-equipment rentals. 3. Anticipated Scope 3.1 Material Procurement and Delivery The contractor shall be capable of procuring, delivering, and warranting the materials and equipment identified in the Government-furnished BOM. The contractor shall provide required material and equipment submittals before ordering materials, and the Government will approve final submittals in writing before purchase. Anticipated submittals include: Steel picket fence; PEB signed and sealed shop drawings; Outdoor ceiling fans; Lighting; Smart meter; Electrical panel; Fitness flooring; Bird netting; Material warranty plan, including roof, flooring, and other applicable equipment warranties; and Fence material and labor warranty. 3.2 Pre-Engineered Building Package The contractor shall be capable of providing a complete PEB material package based on Government design drawings, including digitally signed and sealed shop drawings prepared by a Professional Engineer. The PEB package is expected to include, at a minimum: Lifting-rack/support beams; A fixed steel beam with predrilled holes for 25-foot ropes; Toe-hold bars located three inches above the finished floor; Factory coating and painting, with Government-selected colors; Medium-bronze exterior roof panels and manufacturer-standard light interior roof panels; Standing seam metal roofing; Gutters and downspouts; Built-in copper lightning protection, where available; and Black, heavy-duty polyethylene bird netting with ¾-inch mesh meeting or exceeding the specified mesh-quality and break-strength requirements. The PEB shall be designed in accordance with the SOW’s specified structural and high-velocity-wind requirements. The SOW requires a minimum 20-year material warranty, a current Miami-Dade Notice of Acceptance for the PEB and insulation, and a roof assembly capable of the stated uplift and wind criteria. Zinc-plated metal is prohibited. 3.3 Lightning Protection System — Conditional Installation If a compliant PEB with built-in lightning protection is unavailable, the contractor shall be capable of furnishing and installing a conventional lightning-protection and grounding system following completion of RED HORSE construction activities. The contractor’s capability should include: Copper lightning-protection materials; Installation shop drawings; UL-listed and labeled components; Fence-bonding connections; Grounding-system testing and test-point documentation; Third-party inspection and written certification by an entity independent of the system designer and installer; and Compliance with the project’s cited lightning-protection requirements. 3.4 Steel Picket Fence Installation and Site Restoration The contractor shall be capable of furnishing and installing a steel picket fence around the outdoor-fitness-facility overhang structure. The fence must be located at least five feet from the roof overhang and include an accessible, lockable gate/door. The fence-related scope includes required access and equipment doors, hardware, and restoration of disturbed areas using St. Augustine sod. 3.5 Construction Equipment The contractor shall be capable of furnishing the construction equipment identified in the BOM for the stated rental periods or project duration. Anticipated equipment includes a 12,000-pound telehandler forklift, skid loaders with buckets and forks, a water truck, scissor lifts, straight-track manlifts, a double-drum roller, a mini excavator with hammer, a dump truck, and concrete forms with pins. Equipment shall be delivered to the project site, fueled, and ready for operation. The contractor will not be responsible for subsequent refueling unless otherwise established in a future solicitation. 3.6 Installation Access and On-Site Requirements Potential sources should be capable of working on an active military installation and complying with applicable installation access, identification, safety, security, and operations-security requirements. For contractor-performed installation work, the contractor must be capable of providing an English-fluent site superintendent who remains on site during contract performance. Excavation, if required, will require coordination and permits before work begins; the SOW specifies that permit requests must be submitted at least three weeks before excavation. Normal anticipated work hours for fence installation are 0730–1630, Monday through Friday, excluding Federal holidays, unless alternate hours are approved in writing. 4. Requested Capability Statement Information Interested firms should submit a capability statement of no more than 10 pages, excluding product literature and certifications. Responses should address the following: Company Information Legal business name; Unique Entity Identifier (UEI); CAGE code, if assigned; SAM registration status and expiration date Physical address; Point of contact, telephone number, and email address; and Identification of any General Services Administration schedule, multiple-award contract, or other contract vehicle the Government could consider, if applicable. Business size and Socioeconomic Status under the proposed NAICS code(s) Business Size Under Proposed NAICS Code 236220 Small Business Status Small Disadvantaged Business Status 8(A) Business Development Program Status HUBZone Small Business Status Service-Disabled Veteran-Owned Small Business Status Veteran-Owned Small Business Status Women-Owned Small Business Status Economically Disadvantaged Women-Owned Small Business Status Technical Capability Demonstrated capability to procure, deliver, and manage the full BOM; Demonstrated capability to furnish a PEB meeting the project’s engineering, wind-resistance, warranty, and Miami-Dade Notice of Acceptance requirements; Ability to provide shop drawings signed and sealed by a qualified Professional Engineer; Capability to provide construction equipment in the quantities and durations described in the BOM; Capability to install steel picket fencing and restore disturbed site areas; and If applicable, capability to install, test, and obtain independent third-party certification of a lightning-protection system. Relevant Experience Provide up to three recent projects of similar size, complexity, and technical characteristics completed within the past five years. For each project, identify the customer, location, period of performance, brief scope, total contract value, and a customer point of contact if release is authorized. Schedule and Supply-Chain Information Estimated lead time for PEB engineering, fabrication, and delivery; Estimated lead time for major material categories and equipment rentals; Known supply-chain risks or long-lead items; Ability to coordinate concrete deliveries; and Recommended phasing approach to support RED HORSE construction. Commerciality and Alternatives Identify whether the proposed supplies are commercial products; Identify any commercially available alternatives that meet or exceed the salient project requirements; Identify material substitutions or specification clarifications that may improve availability, schedule, resiliency, or lifecycle cost; and Clearly identify any requirement that the respondent believes limits competition, along with a technically acceptable alternative. Rough-Order-of-Magnitude Information Provide a nonbinding rough-order-of-magnitude estimate, broken out by: PEB package; Materials procurement and delivery; Construction equipment; Fence installation and site restoration; Conditional lightning-protection installation; and Any other significant cost driver. This information is requested for planning only and will not be treated as an offer or proposal. 5. Response Instructions Submit responses via email to nika.salemi.2@us.af.mil no later than 5:00 PM EST on November 26, 2026. Use the following subject line: Sources Sought Response – Outdoor Fitness Facility B-389 – [Company Name] Email X of X (insert number of the email and total number of emails) Do not submit classified information. If a respondent believes its submission contains proprietary information, the respondent shall clearly identify the specific proprietary portions of its submission. 6. Government Reservation of Rights This Sources Sought notice is issued solely for planning and market-research purposes. The Government may use information received in response to this notice to refine the requirement, determine the appropriate acquisition strategy, assess the availability of capable small-business concerns, and determine whether to issue a future solicitation. The Government is not obligated to issue a solicitation or award a contract as a result of this notice. The Government may revise, cancel, or take no further action regarding this requirement. 7. System for Award Management Firms are encouraged to provide their SAM registration status and expiration date with their response. While SAM registration is not required to submit a response to this Sources Sought notice, any firm submitting an offer or quotation under a future solicitation must be registered in the System for Award Management at the time required by the applicable solicitation and Revolutionary FAR Overhaul requirements.
71%
Market Research11/26/2026
The U.S. Army Corps of Engineers (USACE) Europe District (NAU) intends to solicit and award a target of three (3) to five (5) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOCs) under which subsequent task orders may be executed as Design-Build (DB) or Design-Bid-Build (DBB) construction requirements. The scope of work will encompass construction, real property repair, and maintenance of new and existing secure facilities, including Sensitive Compartmented Information Facilities (SCIFs), in support of national defense operations throughout the U.S. European Command (EUCOM) and U.S. Africa Command (AFRICOM) Areas of Responsibility (AORs). This upcoming acquisition under Solicitation Number W912GB27RA012 is a direct continuation of the market research and planning efforts initiated under Sources Sought Notice ID W912GB26X1C29.
69%
Pre-SolicitationOpen

Additional Details

Solicitation Number

N0002411R4310

Archive Date

Feb 22, 2011