GovChime
Notice ID: 3260c54b1f54463ebcc9fbc1495da785Sources Sought

T-AO Detail Design and Construction Sources Sought

Archived on September 30, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:59 PM UTC−04:00
Posted
September 2, 2022
Notice type
Sources Sought
NAICS
336611: Ship Building and Repairing
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVSEA HQ
Last updated
Dec 4, 2025

Identifiers

Solicitation number
N0002423R2501
Notice ID
3260c54b1f54463ebcc9fbc1495da785

Description

NOTE: This notice is for market research purposes only and does NOT constitute a request for proposal. This notice shall not be construed as a contract, a promise to contract, or as a commitment of any kind by the Government. The Government is NOT seeking or accepting unsolicited proposals. This Sources Sought notice is issued by the Department of the Navy, Naval Sea Systems Command (NAVSEA), Program Executive Office Ships (PEO Ships), and the Auxiliary and Special Mission Shipbuilding Program Office (PMS 325) for the purpose of conducting market research in accordance with FAR Part 10 to determine if sources exist that are capable of satisfying the Navy's anticipated program requirement for the detail design and construction (DD&C) of T-AO 205 John Lewis-class Fleet Replenishment Oiler ships using a technical data package as guidance. The John Lewis-class T-AOs replaces the legacy T-AO 187 Class Fleet Replenishment Oilers as well as the Fast Combat Support Ships. The John Lewis-class T-AOs carry jet fuel, diesel fuel and lubricating oil, small quantities of fresh and frozen provisions, stores, potable water and more. The T-AOs will be operated by the U.S. Navys Military Sealift Command and provide underway replenishment of fuel and stores to U.S. Navy ships at sea and jet fuel for aircraft assigned to aircraft carriers. The Navy anticipates a total of twenty John Lewis-class T-AOs. The Navy accepted delivery of the lead ship of its new class of fleet replenishment oilers, John Lewis (T-AO 205) on July 26, 2022. Harvey Milk (T-AO 206), Earl Warren (T-AO 207), and Robert F. Kennedy (T-AO 208) are currently under construction. The future Lucy Stone (T-AO 209), Sojourner Truth (T-AO 210), Thurgood Marshall (T-AO 211), Ruth Bader Ginsberg (T-AO 212), and T-AO 213 are under contract. General characteristics of the John Lewis-class include: Twin shaft propulsion, geared medium speed diesels with PTO generators/PTI, 227.3 meters in length, 32.2 meters beam, 10.2 meters draft, Lightship Displacement of 22,173 metric tons, Full Load Displacement of 49,850 metric tons, Speed of 20 knots, Crew of 99 civilian mariners, Dry store capacities of 1,576 m3 freeze and a chill capacity of 1,362 m3, Landing platform for vertical replenishment can accommodate H-1, H-53, H-60, MV-22, and MSCs commercial logistics helicopters, In accordance with 10 U.S.C. 8679, neither the vessel nor the hull, midbody, or other major fixed structural component of the vessel shall be constructed in a foreign shipyard. Following a review of the responses received, NAVSEA may elect to schedule one-on-one meetings with some respondents or ask follow-up questions to gain additional information regarding the companys response. ANSWERING THIS NOTICE: Respondents should provide a company profile to include, at a minimum, the following: Full Business Name Business Address (include mailing address if different) Cage Code At least two points of contact with name, email address, mailing address, and telephone number to contact for any necessary clarifications, to receive additional information, for additional data required by the analysis, and for information on any necessary non-disclosure agreements. Business size status (i.e., LB, SB, VOSB, SDVOSB, HUBZone SB, SDB, WOSB) for the identified NAICS Code(s). Describe your companys ability to manage, secure and transmit information up to the SECRET level Describe your companys organizational resources and facilities for the detailed design and construction of T-AOs assuming one ship per year starting with T-AO 214 in fiscal year 2024. However, the contract is anticipated to include pricing flexibility to contain option pricing for an additional ship each fiscal year (upto two ships total per year). The companys narrative should define the processes and resources that will be implemented and administered to manage the total ship construction effort. Include shipyard capabilities, capacity, resource planning, and a notional production delivery dates. Describe the companys manufacturing software tools (engineering design tools) that would be used for detail design and construction of the T-AOs using a technical data package as guidance. Describe the current production facilities that could be used to construct the T-AOs. Graphically depict the layout and relative locations of the test facilities; offices; ways, drydocks, or other erection facilities; facilities for storage of intermediate construction products, including warehouses; piers and other waterfront facilities; shops and other fabrication facilities; and subcontractor facilities, if applicable, where T-AO construction could take place to demonstrate the capability and capacity of the company to construct, launch, test, and outfit T-AOs that meet the technical requirements of the Navy. Describe any planned or in-process facility upgrades, noting whether these upgrades would be required in order to construct T-AOs. Identify any facilities and/or environmental limitations that would affect the companys ability to construct T-AOs, including predominant weather conditions, water depths (high/low tides) and any physical limitations between outfitting piers and trial areas (e.g. all navigating restrictions including but not limited to channel depths, bridge heights, ice restriction, etc.), and discuss planned mitigations. Identify the companys recent experience constructing ships of a similar size and complexity as a T-AO. The desired format for submissions is white paper or similar narrative (contractors format). The response should be in 12-point font with no less than 1-inch margins. Submissions should be in Microsoft Word 2010 or searchable Adobe Acrobat Portable Document Format (PDF). Respondents are requested to limit submissions to 10 pages in length, including figures. In order to be considered in this market survey, your response must be received on or before 30 September 2022 by 11:59PM EST. Companies are encouraged to submit prior to the closing date. Proprietary information, if any, must be clearly marked. To aid the Government in its review and evaluation, please segregate proprietary information. Please be advised that all submissions become Government property and will not be returned. Respondents shall mark any data included in its submissions that they do not want disclosed to the public for any purpose. All responses must be sent via electronic mail to the following addresses: TO: Mr Brett Bikowski (Contracting Officer) at brett.t.bikowski.civ@us.navy.mil CC: Ms. Jennifer Ede (Contract Specialist) at jennifer.a.ede.civ@us.navy.mil Mr. Rob Gerstein at robert.m.gerstein.civ@us.navy.mil Ms. Brie Lang at brienne.g.lang.civ@us.navy.mil SUBJECT LINE: T-AO Sources Sought (insert name of company) Inclusion of a delivery receipt with an email submission will be the only indication of successful receipt of Sources Sought Response. File size is limited to 10 Megabyte (MB) per email. Vendors are responsible for ensuring their email size does not exceed the 10MB limitation. File sizes larger than 10MB and .zip file extensions will be stripped by the Navy email system. Modifications, amendments, or withdrawal of a response should also be made to the above email addresses. One email is acceptable as long as it does not exceed 10MB. If it exceeds 10MB, Companies may separate their submission among multiple emails and should number them email 1 of 3, 2 of 3, 3 of 3, etc. NO CLASSIFIED MATERIAL SHALL BE SUBMITTED UNDER ANY CIRCUMSTANCE. DISCLAIMER AND IMPORTANT NOTES: Respondents are advised that CACI International Inc. and Serco Inc. may assist the Government in its review of responses received under this notice. Respondents shall provide notification on its cover page if the respondent does not consent to the use of the aforementioned contractor(s). Unless otherwise stated by the respondent, a submission received to this notice constitutes consent that the abovementioned contractors can have access to all information provided in the respondent's submission. This notice is not a request for proposals and is not to be construed as a commitment by the Government to issue a solicitation. This notice does not obligate the Government to award a contract or otherwise pay for the information provided in response. Sources choosing to respond to this notice are wholly responsible for any costs/expenses associated with submitting a response. Therefore, any cost associated with the market survey submission is solely at the interested vendor's expense. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. Respondents will not be notified of the results of this notice. The information obtained from submitted responses may be used in development of an acquisition strategy and a future solicitation. Submissions will not be returned. No reimbursement will be made for any costs to provide information in response to this announcement or any follow-up information requests. Information contained herein is based on the best information available at the time of publication, is subject to revision, and is not binding upon the Government.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:N0002423R2501
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentSep 2, 2022

    T-AO Detail Design and Construction Sources Sought

    Notice 3260c54b1f54463ebcc9fbc1495da785 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Post-Event Update #2 A sanitized record of questions and answers that resulted from the Auxiliary Ships Industry Day event and one-on-one discussions is now available and may be requested using the link below by the response date indicated in this notice. https://forms.osi.apps.mil/r/8HeWPqXax4 Please note: The Government retains sole discretion in granting requests for Q&A materials. Submission of a request does not guarantee access to the materials. The Government reserves the right to deny any request or restrict distribution to ensure acquisition integrity, operational security, or for any other reason deemed appropriate by the Contracting Officer. Information presented in connection with this notice is subject to change. Post-Event Update #1 Thank you to all who expressed interest, submitted feedback, or attended the Auxiliary Ships Industry Day. If you were not in attendance but wish to request a copy of the presentation materials from the event, please a request using the link below by the response date indicated in this notice. https://forms.osi.apps.mil/r/ZnG900sUgS Please note: The Government retains sole discretion in granting requests for presentation materials. Submission of a request does not guarantee access to the materials. The Government reserves the right to deny any request or restrict distribution to ensure acquisition integrity, operational security, or for any other reason deemed appropriate by the Contracting Officer. Information presented in the briefing slides is subject to change. Industry Day Notice Update: As of 22 July 2026, registration for this event has reached maximum capacity. We regret that we cannot accept additional registration requests at this time. Please contact the point of contact listed in this posting with any questions. Thank you for your interest in this opportunity. The Department of Navy’s Portfolio Acquisition Executive (PAE) Maritime, in coordination with the Department of Transportation Maritime Administration (MARAD), invites interested firms to attend an Auxiliary Ships Industry Day covering the following acquisition programs: PAE Maritime’s Bulk Fuel Consolidated Cargo (CONSOL) Tanker PAE Maritime’s Next Generation Hospital Ship (T-AH(X)) MARAD’s Roll-on/Roll-off (RO/RO) Vessel Program MARAD’s Vessel Acquisition Manager (VAM) 2.0 The purpose of this engagement is to provide an overview of each program's requirements and engage with Vessel Construction Managers (VCMs), shipyards, and key suppliers to obtain industry feedback that will support market research and inform ship design and acquisition strategies. The Auxiliary Ships Industry Day will span two days, Wednesday, 5 August 2026 and Thursday, 6 August 2026. PAE Maritime and MARAD will offer presentations on the covered programs during a morning session on Wednesday, 5 August 2026. Registered attendees will have the opportunity to schedule a one-on-one session with PAE Maritime and/or MARAD officials starting the afternoon of 5 August and continuing into Thursday, 6 August 2026. The event will be held in-person at a location in the vicinity of the Washington Navy Yard in the District of Columbia. Organizations interested in attending the event and scheduling an individual breakout session must complete and submit the registration form at [link removed due to capacity limit]. Registration is required for all attendees. Verified registrants will receive further details regarding the event and event location. The Government anticipates a high degree of interest for this event. Submission of a registration form does not guarantee attendance. The Government will notify registered attendees of approval to attend this event no later than Wednesday, 29 July 2026. The Government reserves the right to modify or cancel this event at any time. This announcement is not a contract, request for proposal, a promise to contract, or a commitment of any kind on the part of the Government. The Government does not assume liability for costs incurred by an attendee or for travel expenses or marketing efforts; therefore, any costs associated with this notice, including participation at the industry day, are not considered an allowable charge to the Government. This event is closed to media attendance. For further information regarding the acquisition programs covered by this event, please refer to the following previously issued notices: N00024-26-R-4160 Request for Information: Medium-Range Bulk Fuel Tanker Vessels N00024-26-R-2433 Next Generation Hospital Ship T-AH(X) Request for Information 06032026 Request for Information (RFI) regarding the potential to lease new RO/ROs vessels.
71%
Special Notice09/23/2026
Update Number 0012: The purpose of amendment A0010 is to clarify how the Government is evaluating the number of ships. Therefore, the following sections of the solicitation have been updated accordingly: Add language in Sections L.2.1.2 and M.4.2 in red, and revise language in Section M.4.4 in red.
67%
Combined Synopsis05/04/2026
Multiple-award contract indefinite-delivery indefinite-quantity (MAC IDIQ) for discrete production, non-discrete production and other production work to support Navys four public shipyards, Trident Refit Facilities (TRFs) at Kings Bay and Bangor (TRFKB and TRFB), Naval Submarine Base New London (SUBASE New London) and Naval Base Point Loma (NBPL) in accomplishing repair, maintenance, and modernization of all submarines. The initial solicitation N00024-25-R-4321 established a MAC IDIQ framework for procuring work during Chief of Naval Operations (CNO) availabilities on SSNs. This baseline capability is now designated as Requirement 1. This solicitation N00024-27-R-4320 provides for a rolling admissions period for Requirement 1 and also incorporates two new requirements designated as Requirement 2 and Requirement 3.Requirement 2 consists of procuring work during availabilities on SSBNs and SSGNs at designated Submarine Maintenance Repair Facilities. Participating locations include Norfolk Naval Shipyard (NNSY), Puget Sound Naval Shipyard (PSNS), Pearl harbor Naval Shipyard (PHNSY), Portsmouth Naval Shipyard (PNSY), Trident Refit Facilities (TRFs) at Kings Bay and Bangor (TRFKB and TRFB), Naval Submarine Base New London (SUBASE New London) and Naval Base Point Loma (NBPL). Requirement 3 consists of procuring work during availabilities on SSNs specifically at TRFKB, TRFB, SUBASE New London, and NBPL. Existing MAC IDIQ contract holders (Requirement 1) electing to compete for Requirement 2 and/or Requirement 3 shall submit a formal proposal in strict compliance with the solicitation requirements for each applicable requirement they seek an award of. The specific requirements will be defined at the delivery order level, and will encompass efforts such as preservation, structural/non-destructive testing, shipboard work, electrical services, component repair, and engineering support. Efforts include performing drydock submarine repairs, maintenance and alterations at NNSY, PSNS and IMF, PHNSY and IMF, PNSY, TRFKB, TRFB, SUBASE New London, and NBPL and performing the repair and restoration of select critical components. Offerors are not required to have their own drydock. Work would be performed under delivery orders anticipated to be completed among MAC IDIQ awardees over a base period ending on 1 September 2030 with three additional option years concluding on 1 September 2033, previously established under N00024-25-R-4321 if all options are exercised. The contract periods were established as follows: Base Period - Contract award through 1 September 2030; Option Year 1 - 2 September 2030 through 1 September 2031;Option Year 2 - 2 September 2031 through 1 September 2032; Option year 3 - 2 September 2032 through 1 September 2033.Any new awards made because of this Request for Proposal (RFP) will follow the same contract ordering period periodicity as provided above. The Navy will include rolling admissions provisions enabling the Navy to annually announcement an interim competition for the purpose of adding additional contractors to the MAC IDIQ. The Navy has categorized each of these requirements (1, 2 and 3) to be procured under the MAC IDIQ into two tiers: Critical (Lot 1) and Non-Critical (Lot 2), as defined as follows: Critical (Lot 1) requirements consist of efforts that involve critical systems. Due to the nature of critical systems onboard the submarine the likelihood that delays in completing the work associated with these systems will have a significant impact on the overall availability schedule, the Navy will require contractors to possess capability and capacity to meet technical requirements for critical systems to be eligible for Lot 1 scope. To complete this work, awardees are expected to have the knowledge, skills, and experience necessary to compete for multiple concurrent complex availabilities on critical systems. Critical systems (Lot 1), although not all inclusive, the following is a list of the most common critical systems. All systems listed imply areas of the system and equipment requiring work certifications that are not subject to special emphasis program controls (e.g., submarine safety program (SUBSAFE), fly by wire (FBW), deep submergence systems/scope of certification (DSS/SOC).Vertical Launch Systems (VLS)Ship control systems components Torpedo tube Bow planes Sonar Dome Large vertical array Shipboard hydraulics systems Normal fuel oil tank and systems Lube oil systems on-Critical (Lot 2) requirements consist of efforts that do not involve critical systems but may include systems and equipment requiring work certifications. Lot 2 scope is expected to require fewer specialized contractor capabilities, both in terms of personnel and equipment. The Navy intends to issue Non-Critical (Lot 2) efforts under a Small Business Set-Aside.All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. DISCLAIMER: Prior Questions and Answers documentation provided with this RFP is for information purposes only. Interested parties should carefully review the current solicitation for any changes.
57%
Solicitation12/31/2026
This is a Request for Proposal (RFP) from PAE Maritime to transport, dismantle, de-militarize, and dispose of ex-Long Beach (CGN9), including the defueled reactor plants. It is related to the N00024-26-I-CGN9 Request for Information, which included information from the Industry Day, Tours and Data Library Access instructions.
57%
Solicitation11/23/2026
This event is closed to media attendance. Registration is open for the Portfolio Acquisition Executive Maritime (PAE Maritime) Fall 2026 Industry Day. Please register using the link provided below under the Attachments/Links section of this notice. PAE Maritime invites industry partners to an in-person industry day on December 8, 2026, to engage with PAE leadership on the latest developments, requirements, and priorities across the PAE Maritime portfolio. PAE Maritime officials will deliver leadership portfolio updates, showcase how we are doing business differently, and highlight upcoming contracting opportunities. PAE Maritime has responsibility for aircraft carrier, surface, expeditionary, mine warfare, and auxiliary Fleet ship construction and sustainment. WHO: Those interested in potential collaborations with PAE Maritime are encouraged to attend. Attendance is open to representatives of large and small companies; academia; consortiums; and other government organizations. WHAT: PAE Maritime Fall 2026 Industry Day WHEN: Tuesday, December 8, 10:00 am – 5:00 pm WHERE: Washington, D.C. Join us to build on the dialogue started at our inaugural Industry Day in May this year. We look forward to seeing you! NOTE: Due to space limitations, attendance from each organization will be limited to a maximum of two representatives. Organizations should deconflict attendees internally before submission. Additional registrations may be declined.
57%
Special Notice11/19/2026

Additional Details

Solicitation Number

N0002423R2501

Archive Date

Sep 30, 2022

Office Address

WASHINGTON NAVY YARD, DC, 20376-5000