GovChime
Notice ID: 575b485acfd04e9bb578c10a8728b76dSolicitationArchived

MOTOR,ALTERNATING C

Archived on February 14, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:30 PM EST
Posted
January 12, 2026
Notice type
Solicitation
Set-aside
No Set aside used
NAICS
335312: Motor and Generator Manufacturing
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVSUP.NAVSUP WEAPON SYSTEMS SUPPORT.NAVSUP WSS MECHANICSBURG.NAVSUP WEAPON SYSTEMS SUPPORT MECH
PSC
6105: MOTORS, ELECTRICAL
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
N00104-26-Q-LA58
Notice ID
575b485acfd04e9bb578c10a8728b76d

Description

TEARDOWN, EVALUATE, REPAIR AND/OR MODIFY
NSN 7HH 6105-01-500-3042
MOTOR,ALTERNATING C SHELF LIFE 0-00
SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E, AND ATTACHMENTS
HM QUP ICQ PMT CD PM WM CUD CT UC LP IC UCL SP MK PACK UNIT PKWT UNIT PKCU OPI
N 001 000 51 1 00 JA LK 0 FW A 00 A 03 FFF 1920.0 19.078 M
PACKAGING IS IN ACCORDANCE WITH MIL-STD-2073
SHIP TO
0001AA N00104-24-U-1139 W25G1U 4 EA
M/F: "A" CONDITION STOCK 
TP: 3
0001AB N00104-24-U-2840 W25G1U 2 EA
M/F: "A" CONDITION STOCK
TP: 3
SOLICITATION NOTES:
** Accelerated delivery is encouraged and accepted before the delivery date(s)
listed in the schedule. **
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be
issued bilaterally, requiring the contractor’s written acceptance prior to
execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 256
Government Source Inspection (GSI) is required.
Please note freight is handled by Navy CAV or Proxy CAV as stated in
NAVSUPWSSFA24 or NAVSUPWSSFA25.
Your quote should include the following information:
***************QUOTE AMOUNT AND RTAT ***************
Unit Price:__________
Total Price:__________
Repair Turnaround Time (RTAT): _______ days
If your company is not quoting the Government’s Required Repair Turnaround
Time (RTAT) or earlier, provide your company’s capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms
of the contract. For purposes of this section, Return is defined as physical
receipt of the F-condition asset at the contractor’s facility as reflected in
the Action Date entry in the Commercial Asset Visibility (CAV) system. In
accordance with the CAV Statement of Work, the contractor is required to 
accurately report all transactions by the end of the fifth regular business day
after receipt and the Action Date entered in CAV must be dated to reflect the
actual date of physical receipt. The Contractor must obtain final inspection
and acceptance by the Government for all assets within the RTATs established
in this contract.
*Check one: Firm-fixed-Price ___ Estimated ___ NTE ___
*Return Material Authorization # (RMA), if applicable:__________
*Delivery Vehicle (if Delivery Order requested) (if your company has a current
BOA/IDIQ, for example) :__________________
***************TESTING AND EVALUATION IF BEYOND REPAIR***************
* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
and the contractor provides documentation that costs were incurred during
evaluation and determination of BR, the contracting officer will negotiate a
reduced contract price, not-to exceed (NTE) $___________associated with the
repair effort to reflect the BR status of the equipment.
* The T&E fee (if asset is determined BR/BER) was determined/computed based
on:______________________________________.
***************AWARDEE INFO & PERFORMANCE LOCATION***************
Awardee CAGE: __________
*Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________
* Facility/Subcontractor CAGE (where the asset should be shipped), if not same
as ""awardee CAGE"":__________
*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************
*New unit price:__________
*New unit delivery lead-time:__________
IMPORTANT NOTE: Any asset for which the contractor does not meet the required
RTAT will incur a price reduction per unit/per month the contractor is late -
any delay determined to be excusable (e.g. Government Delay) will not result
in a price reduction. If a price reduction is required due to unexcusable
contractor delay, the Contracting Officer will implement the aforementioned
price reduction via a ""reconciliation modification"" at the end of the
contract performance. Price reductions made pursuant to this section shall
not limit other remedies available to the Government for failure to meet
required RTATs, including but not limited to the Government’s right to
terminate for default.
In reference to the above important note, the contractor provides the
following price reduction amount per unit per month the contractor does not
meet the RTAT: $__________, up to a maximum of: $_________.

INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN

POC EMAIL: JOSEPH.D.WEAVER22.CIV@US.NAVY.MIL

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Joseph Weaver
Fax: 7176057296

Documents

Files (1)

  • 3.01_Solicitation_24202-0340.PDF

    677 KBAdded in Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3SolicitationArchivedCurrent

    MOTOR,ALTERNATING C

    Notice 575b485acfd04e9bb578c10a8728b76d on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

N00104-26-Q-LA58

Archive Date

Feb 14, 2026

Office Address

MECHANICSBURG, PA, 17050-0788