GovChime
Notice ID: d197f5eb87a0413ab97af9574c356569JustificationAwarded

4320 - Redacted J and A

Awarded on April 21, 2023. Full description on SAM.gov.

Overview

Posted
April 24, 2023
Notice type
Justification
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH
Place of performance
1710 Airport Roa, Monroe, NC, 28110
Last updated
Sep 25, 2026
Award date
Apr 21, 2023
Award amount (SAM.gov award notice)
Not specified

Identifiers

Solicitation number
N0010422RZA65
Notice ID
d197f5eb87a0413ab97af9574c356569

Description

CONTACT INFORMATION amber.l.miller.civ@us.navy.mil ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022) INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996) INSPECTION AND ACCEPTANCE - SHORT VERSION X X TIME OF DELIVERY (JUNE 1997) CLIN 0001 THREE (3) STOP-WORK ORDER (AUG 1989) WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018) Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo Material - Inspect & Accept at Source TBD TBD TBD TBD TBD N/A N/A N/A TBD N/A N/A TBD 1-866-618-5988 - WAWF Helpd esk NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18)) VALUE ENGINEERING (JUN 2020) CONTRACT DEFINITIZATION (DEC 2012) Firm-Fixed Price (FFP FFP 90 Days after receipt of the carcasses FFP TBD EQUAL OPPORTUNITY (SEP 2016) LIMITATION OF GOVERNMENT LIABILITY (APR 1984) TBD TBD SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019) INTEGRITY OF UNIT PRICES (NOV 2021) EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) WARRANTY OF DATA--BASIC (MAR 2014) SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021) SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (SEP 1999)) EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) PROGRESS PAYMENTS (NOV 2021)(DEVIATION 2020-O0010) LIMITATION OF LIABILITY--HIGH-VALUE ITEMS ($100K)(FEB 1997) LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020) REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021)) ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020) X BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014) ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022) COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018)) TYPE OF CONTRACT (APR 1984) Firm-Fixed Price NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008)) X REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JUN 2019)) 1. Subject amendment hereby incorporates the required language and official DD254 document. 2. Offerors must have a valid U.S. security clearance of CONFIDENTIAL or higher in order to respond to this RFP N00104-22 -R-ZA65, because RFP N00104-22-R-ZA65 includes an annex (information) classified at the CONFIDENTIAL level which will be released only to the offerors possessing the appropriate clearance. All classified material must be handled in accordance with the National Security Program Operating Manual (NISPOM)(DoD 5220-22-M) and Industrial Security Regulation (DoD 522-22-R). 1. Subject amendment updates the Technical Data Package (TDP). \ 1. Offerors must have a valid U.S. Security clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010422RZA65, because RFP N0010422RZA65 includes an annex (information) classified at the CONFIDENTIAL level which will be released only to the offerors possessing the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM)(DoD 5220.22-M) and Industrial Security Regulation (DoD 5220.22-R). 1. This solicitation is for the repair of NIIN LLH0D2897 (PUMP AND MOTOR ASSY), quantity 3. 2. Proposal is to be submitted as an Estimated, Not-To-Exceed Price for the full repair effort of the requirement. Vendor will have 90 days to complete ateardown and evaluation of the carcasses and submit a Firm-Fixed Price Proposal. 3. When submitting a proposal, make sure you specify any exceptions, i.e. MIL-STD packaging, MIL-STD Labeling, Inspection and Acceptance Locations, Packaging Houses, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted fromunit price. 4. Include in Estimated/Not-To-Exceed Repair Price all costs associated withreceipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. Also, please provide the following: a. Teardown and Evaluation rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration Date: - PRICE REDUCTIONS Any assets for which the contractor does not meet the required RTAT will incura price reduction of XXXX per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's rights to terminate for default. - RECONCILIATION A reconciliation modification will be issued after final inspection and acceptance of all assets included under this contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, the price adjustment as stated shall be applicable. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. The Contractor must obtain final inspection and acceptance by the Government for ll assets within the RTATs established in this contract. Requested RTAT: 612 Days Proposals shall reference the proposed RTAT and any capacity constraints. 5. If supplies will be packaged at a location different from the Offeror's addrss, the Offeror will provide the Name, Street Address, and CAGE of the Packaging Facility. 6. If you are not the manufacturer of the material called out in the requirement, the actual manufacturer must be stated (Name and CAGE) and be a ble to provide traceability documentation if requested. Examples of traceability documentation include but are not limited to the following: - Purchase order/Invoice between you and the manufacturer identifying the part number, revision level and quantities - Manufacturer's packing slip or certification identifying the part number, revision level and quantities 7. Any contract awarded as a result of this solicitation will be DO certified for nationa defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contracted to ne awarded will be a rated order. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the PUMP AND MOTOR ASSY . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;Noise testing in accordance with EB Spec 4020 and PSSN21C-68 which when filled out is CONFIDENTIAL; DRAWING DATA=ADDITIONAL - D - 0008916 DRAWING DATA=EB-4020 F D 0000000 3. REQUIREMENTS 3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;59180; , drawing ;SF11217; ,and the applicable SUBMEPP Repair Instruction ;5560-012-0003 Rev - CHG 1 (CSD383); , except as amplified or modified herein. 3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD381, CSD382, and CSD383; in ECDS at https://register.nslc.navy.mil/ 3.3 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;EB spec 4020 Rev F; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

Full description on SAM.gov

Award Overview

Award Number

N00104CZA10

Award Amount (SAM.gov award notice)

Not specified

Award Date

Apr 21, 2023

Awardee

Not specified

Original Solicitation

Notice ID: d197f5eb87a0413ab97af9574c356569

Posted Date: Apr 24, 2023

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Amber Miller 717-605-3261

Documents

No documents available.

Lifecycle

Solicitation:N0010422RZA65
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationApr 8, 2022

    43--PUMP AND MOTOR ASSY, IN REPAIR/MODIFICATION OF

    Notice d72970de75304e7ebb716e0773d9a123 on SAM.gov

  2. 9×
    SolicitationJun 8, 2022

    43--PUMP AND MOTOR ASSY, IN REPAIR/MODIFICATION OF

    Notice c7eda83522404de0947301eb316a05be on SAM.gov

  3. AwardedApr 22, 2023

    43--PUMP AND MOTOR ASSY, IN REPAIR/MODIFICATION OF

    Notice d6297f9552134dec9854521ba41b4da3 on SAM.gov

  4. Sole Source / J&ACurrentApr 24, 2023

    4320 - Redacted J and A

    Notice d197f5eb87a0413ab97af9574c356569 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

N0010422RZA65

Archive Date

May 22, 2023

Office Address

MECHANICSBURG, PA, 17050-0788