GovChime
Notice ID: 001dc202b79041f49c0759b400d1dee2Solicitation

CONTROL MODULE

Archived on June 2, 2026. Original response deadline: . Full description on SAM.gov.

Description

All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be
issued bilaterally, requiring the contractor’s written acceptance prior to
execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 78 DAYS
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset
Visibility (CAV) Statement of Work.
Your quote should include the following information:
***************QUOTE AMOUNT AND RTAT ***************
o Unit Price:__________
o Total Price:__________
o Repair Turnaround Time (RTAT): _______ days
o Number of Days Quote is Valid (ideally 60 days or longer): ________ Days
If your company is not quoting the Government’s Required Repair Turnaround
Time (RTAT) or earlier, provide your company’s capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms

of the contract. For purposes of this section, Return is defined as physical
receipt of the F-condition asset at the contractor’s facility as reflected in
the Action Date entry in the Commercial Asset Visibility (CAV) system. In
accordance with the CAV Statement of Work, the contractor is required to
accurately report all transactions by the end of the fifth regular business
day after receipt and the Action Date entered in CAV must be dated to reflect
the actual date of physical receipt. The Contractor must obtain final
inspection and acceptance by the Government for all assets within the RTATs
established in this contract.
*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
*Return Material Authorization # (RMA), if applicable:__________
*Delivery Vehicle (if Delivery Order requested) (if your company has a current
BOA/IDIQ, for example) :__________________
***************TESTING AND EVALUATION IF BEYOND REPAIR***************
* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
and the contractor provides documentation that costs were incurred during
evaluation and determination of BR, the contracting officer will negotiate a
reduced contract price, not-to exceed (NTE) $___________associated with the
repair effort to reflect the BR status of the equipment.
* The T&E fee (if asset is determined BR/BER) was determined/computed based
on:______________________________________.
***************AWARDEE INFO & PERFORMANCE LOCATION***************
o Awardee CAGE: __________
*Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________
* Facility/Subcontractor CAGE (where the asset should be shipped), if not same
as "awardee CAGE":__________
*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************
*New unit price:__________
*New unit delivery lead-time:__________
IMPORTANT NOTE: Any asset for which the contractor does not meet the required
RTAT will incur a price reduction per unit/per month the contractor is late -
any delay determined to be excusable (e.g. Government Delay) will not result
in a price reduction. If a price reduction is required due to unexcusable
contractor delay, the Contracting Officer will implement the aforementioned
price reduction via a "reconciliation modification" at the end of the contract
performance. Price reductions made pursuant to this section shall not limit
other remedies available to the Government for failure to meet required RTATs,
including but not limited to the Government’s right to terminate for default.
In reference to the above important note, the contractor provides the
following price reduction amount per unit per month the contractor does not
meet the RTAT: $__________, up to a maximum of: $_________.
*************** OPTION QUANTITY ***************

The Government intends to add an option quantity to the resultant contract.
In reference to the option quantity, the Government may increase the quantity
of supplies called for in the Schedule at the unit price specified. The
Contracting Officer may exercise the option by written notice to the
Contractor within the number of days in FAR 52.217-6 herein. Delivery of the
added items shall continue at the same rate as the like items called for under
the contract, unless the parties otherwise agree.
o Please indicate the pricing for the option quantity:
o Price Each: $_____________
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: XAVIER.A.KELLAM.CIV@US.NAVY.MIL

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Navy
Office:NAVSUP.NAVSUP WEAPON SYSTEMS SUPPORT.NAVSUP WSS MECHANICSBURG.NAVSUP WEAPON SYSTEMS SUPPORT MECH
Posted:April 22, 2026
NAICS:334290: Other Communications Equipment Manufacturing
Last Updated:Aug 21, 2026
PSC:5895: MISCELLANEOUS COMMUNICATION EQUIPMENT
Set-Aside:No Set aside used
Type:Solicitation
Place of Performance:Not specified

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:N0010426QSC36
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. SolicitationCurrentApr 22, 2026

    CONTROL MODULE

    Notice 001dc202b79041f49c0759b400d1dee2 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

N0010426QSC36

Archive Date

Jun 2, 2026

Office Address

MECHANICSBURG, PA, 17050-0788