Notice ID: a502f0775e0a43d79b673f6c144f5482Solicitation
Command Post (CP) and Mountain Top Relay (MTR) Kits
Archived on October 21, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- September 16, 2022
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 334290: Other Communications Equipment Manufacturing
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVSUP FLT LOG CTR SAN DIEGO
- Place of performance
- 24100, NV, 89406
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- N0024422R0086
- Notice ID
- a502f0775e0a43d79b673f6c144f5482
Description
NAWDC has a requirement for the design, fabrication, delivery, installation, and testing of three (3) Command Post Kits and one (1) Mountain Top Relay kit to support a standalone, threat-representative communications network to be used by exercise OPFOR. A portion of RH takes place on the Fallon Range Training Complex (FRTC). The FRTC is a very challenging geographic area for ground-based communications due to the prevalence of mountain ranges and corresponding valleys. The command post and mountain top relay kits will upgrade and modernize the capability employed by the RED and GREEN forces during RH. RED and GREEN force commanders are given commanders intent and objectives for each event, but are allowed to be a thinking enemy, requiring real-time command and control of RED and GREEN forces. Upgrading the command posts and adding a mountain top relay capability will enable the RED and GREEN forces to more effectively communicate, yielding a more lethal adversary and adding to the complexity of the problem RH exercise participants are tasked with solving. If RH range communications equipment is not purchased, RED and GREEN forces will continue to use the existing legacy equipment and will not be able to evolve and adapt to provide a realistic and challenging OPFOR during RH. 3.0 Requirements 3.1 Locations and Description COMMAND POST KITS. Three (3) CP kits shall be delivered to and installed in CP vehicles which are located aboard the FRTC, adjacent to NAS Fallon, NV. All (3) CP vehicles are government-owned vehicles, and all equipment installed will become property of the U.S. Government. CP vehicles consist of one HMMWV, one military box truck, and one towed enclosed trailer. Any existing communications equipment removed to install the CP kits will remain the property of the U.S. Government and will be stored aboard the FRTC, coordinated via the MISRWS. MOUNTAIN TOP RELAY KIT. One (1) MTR kit shall be delivered to and installed aboard the FRTC, adjacent to NAS Fallon, NV. The mountain range area upon which the kit is to be installed is approximately 8,000 feet elevation accessible via gravel road. Upon installation, the MTR kit will become property of the U.S. Government. Any existing communications equipment removed to install the MTR kits will remain the property of the U.S. Government and will be stored aboard the FRTC, coordinated via the MISRWS. The (3) CP kits and (1) MTR kit, once installed, will operate as a standalone network utilized by RH exercise OPFOR. RH OPFOR will utilize the CPs throughout the FRTC as assigned by exercise control, with communications relay accomplished by the Mountain Top Relay. The network will be used solely for scripted, unclassified exercise communications, and will not interface with any military or civilian communications networks on the FRTC. Kit components have been selected to provide the best possible threat-representative network for blue force exploitation. The kits and resulting network cannot route or redirect user data traffic or permit outside visibility into transmitted data due to the standalone nature of the network. Equivalent components may be substituted by the contractor, so long as they are approved by the Technical POC or COR, and are configured in a standalone network.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
N0024422R0086- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationSep 15, 2022
Command Post (CP) and Mountain Top Relay (MTR) Kits
- SolicitationCurrentSep 16, 2022
Command Post (CP) and Mountain Top Relay (MTR) Kits
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
N0024422R0086
Archive Date
Oct 21, 2022
Office Address
SAN DIEGO, CA, 92136