GovChime
Notice ID: b06da81a017f4fcca6dce409ae627372Award NoticeAwarded

Building 514 Crane Rail Cross Bracing Installation

Awarded on November 6, 2026. The description is published on SAM.gov: Full description on SAM.gov.

Awarded tounder N0025327P0001 (source: SAM.gov award notice)• $216.2K

Overview

Posted
November 6, 2026
Notice type
Award Notice
Set-aside
Small Business Set Aside - Total
NAICS
333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVSEA.NAVSEA WARFARE CENTER.NAVAL UNDERSEA WARFARE CENTER
Place of performance
Keyport, Washington, 98345
PSC
K049: MODIFICATION OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT
Last updated
Nov 6, 2026
First published
Last updated on SAM.gov
Award date
Nov 6, 2026
Award amount (SAM.gov award notice)
$216.2K

Identifiers

Solicitation number
N0025327P0001
Notice ID
b06da81a017f4fcca6dce409ae627372
Award number (PIID)
N0025327P0001

Description

No description in the SAM.gov data feed for this notice.

Full description on SAM.gov

Award Overview

Award Number

N0025327P0001

Award Amount (SAM.gov award notice)

$216.2K

Award Date

Nov 6, 2026

Awardee

Awardee UEI

DNG5B13PTJL8

Awardee CAGE Code

3XRC6

Awardee Address

Bremerton, WA 98310, UNITED STATES

Original Solicitation

Notice ID: b06da81a017f4fcca6dce409ae627372

Posted Date: Nov 6, 2026

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (19)

  • N0025326Q00080002.pdf

    567 KBAdded in Solicitation version 6Posted
    Download
  • C7_Att13_Statement_Of_Work_Bldg514_Crane_Final.pdf

    474 KBAdded in Solicitation version 6Posted
    Download
  • N0025326Q0008_Amendment_0001.pdf

    586 KBAdded in Solicitation version 4Posted
    Download
  • C7_Att13_Statement_Of_Work_Bldg514_Crane_Rev1.pdf

    921 KBAdded in Solicitation version 4Posted
    Download
  • C7_Building_514_Crane_Support_Study_Drawing_Final.pdf

    632 KBAdded in Solicitation version 4Posted
    Download
  • C7_PPI_Answers_Final.docx

    34 KBAdded in Solicitation version 4Posted
    Download
  • C7_N0025326Q0008.pdf

    1.8 MBAdded in Solicitation version 1Posted
    Download
  • C7_Att01_Materials_Equipment_In_Place_List.xlsx

    26 KBAdded in Solicitation version 1Posted
    Download
  • C7_Att02_Wage_Determination.pdf

    1.7 MBAdded in Solicitation version 1Posted
    Download
  • C7_Att03_Safety_Requirements_for_Contractors.pdf

    651 KBAdded in Solicitation version 1Posted
    Download
  • C7_Att04_Contractors_Guide_to_Env_Compliance.pdf

    340 KBAdded in Solicitation version 1Posted
    Download
  • C7_Att05_OPSEC_Guide.pdf

    3.2 MBAdded in Solicitation version 1Posted
    Download
  • C7_Att06_Schedule_Of_Values.xlsx

    59 KBAdded in Solicitation version 1Posted
    Download
  • C7_Att07_Past_Performance_References.docx

    35 KBAdded in Solicitation version 1Posted
    Download
  • C7_Att08_Bid_Form.xlsx

    23 KBAdded in Solicitation version 1Posted
    Download
  • C7_Att09_PPI_Form.docx

    30 KBAdded in Solicitation version 1Posted
    Download
  • C7_Att10_Safety_Data_Sheet.docx

    24 KBAdded in Solicitation version 1Posted
    Download
  • C7_Att11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf

    2.1 MBAdded in Solicitation version 1Posted
    Download
  • C7_Att12_Security_Requirements.docx

    23 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 2
    Version 2SolicitationArchived

    Building 514 Crane Rail Cross Bracing Installation

    Notice 85153882a17848c9baff111ad34a67e3 on SAM.gov

  2. 3
    Version 3Award NoticeCurrent

    Type changed from Solicitation to Award Notice

    Building 514 Crane Rail Cross Bracing Installation

    Notice b06da81a017f4fcca6dce409ae627372 on SAM.gov

Similar Opportunities

Title
Phase
Deadline
Fleet Logistics Center Puget Sound (FLCPS) intends to solicit for Winch Assembly. This requirement is sole sourced to Lake Shore Systems due to the company owns and controls the engineering design, manufacturing processes, technical specifications, inspection requirements, and quality standards associated with this component. Interested companies may identify their interest and capability to respond to the requirement, which will be considered solely for the purpose of determining whether to conduct a competitive procurement. A determination not to compete this action based upon responses received to this notice is solely within the discretion of the Government. The Government will evaluate the offeror’s price for reasonableness and past performance as part of the responsibility determination in accordance with RFO 12.203. Anticipated Award Date: NOV 2026 Contracting Officer: Adia Robers, adia.m.roberts.civ@us.navy.mil
Solicitation11/12/2026
SolicitationOpen
AwardedOpen
Fleet Logistics Center Puget Sound (FLCPS) intends to solicit for Original Equipment Manufacturer (OEM) IRON Pumps CNLB 80-80/200. This acquisition is an OEM IRON Pumps BRAND NAME requirement IAW Revolutionary FAR Overhaul (RFO) 12.102 Restricting competition. OEM IRON Pumps sole US-based representative is Leistritz Advanced Technologies Corp. Interested AUTHORIZED DISTRIBUTORS may identify their interest and capability to respond to the requirement or submit quotes prior to the solicitation closing date. Offeror quotes shall include an AUTHORIZED DISTRIBUTOR letter and documentation establishing that the parts are genuine including traceability to the manufacturer and manufacturer warranties. The Brand Name equipment is a ship critical safety item: Main Propulsion Diesel Engines/Main Propulsion Motors/Gas Turbine Engines. Per COMSCINST 4490.1C, MSC N7, the Design Control Activity, has determined that only qualified sources may produce and service these critical safety items. Only authorized field service technicians have access to necessary technical data and have the expertise to identify and provide direct replacement parts for existing equipment, which must be compatible in terms of form, fit, and function with existing equipment or configurations. This ensures equipment reliability. Improperly installed or deficient parts could cause system failure and loss of the affected system or equipment while at sea. All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. Anticipated Award Date: Nov 2026 Contracting Officer: Joseph Ibrahim, joseph.m.ibrahim.civ@us.navy.mil
Solicitation11/06/2026
Please be advised that all communications regarding this requirement are governed by the Procurement Integrity Act. In accordance with FAR 3.104, no proprietary bid information, pricing data, or source selection-sensitive metrics may be exchanged or solicited outside of authorized contracting channels. Thank you for your cooperation in maintaining a fair and ethical procurement process. FOR YOUR BID TO BE DEEMED RESPONSIVE A SIGNED AND COMPLETED SOLICITATION MUST BE SUBMITTED VIA EMAIL OR FAX. ENSURE YOU CHECK APPLICABLE BOXES IN CLAUSE 52.204-24 (2)(d) (1) and (2) AND THAT YOU HAVE COMPLETED ITEMS 1 THROUGH 10 NOTED BELOW. THIS SOLICITATION AND ANY SUBSEQUENT AMENDMENTS WILL BE POSTED TO THE SAM WEBSITE: SAM.GOV ELECTRONIC SUBMISSION OF QUOTES IS AVAILABLE THROUGH THE SAM WEBSITE. To be considered for award, if the contractor (awardee) is required to implement NIST SP 800-171, the contractor (awardee) shall have a current assessment as detailed in DFARS 252.204-7019 (I.E., not more than 3 years old unless a lesser time is specified in the solicitation) **Items deemed to be Commercial Off The Shelf (COTS) are exempt from NIST SP 800-171 requirement. Must identify and provide information to contracting officer on bid during solicitation period** Please read the contract in its entirety. If you are able to provide a quote be sure to provide the following information in the sections provided below: Page 1 BLK 17a. Provide Contractor's info and cage code. Page 1 - Read box 28 and sign boxes 30 a, b, and c. Section A. A1 – 1. Enter The Contractor's POC Section B. – Enter your Quote and any other info we should know. Please quote FOB Destination Section K. K21 – Check the appropriate box and provide the Manufacturer’s Name__________, Address_______ and the Country of Manufacturing________ and part number_________. Section F. – Provide the Lead Time and/or Delivery Date. Section K. - 52.204-24 (d)(1) and (2) Check the applicable boxes Section K.- 52.212-3(b)-(p) Check the applicable boxes Return the signed and filled out solicitation with your quote by the due date listed. FOR YOUR BID TO BE DEEMED RESPONSIVE A SIGNED AND COMPLETED SOLICITATION MUST BE SUBMITTED VIA EMAIL. EMAIL: donna.todd@dla.mil PHONE: 385-591-1057
Solicitation10/28/2026

Additional Details

Solicitation Number

N0025327P0001

Archive Date

Nov 21, 2026

Office Address

KEYPORT, WA, 98345-7610