GovChime
Notice ID: eb4b7d124b19403cace794cd3a242aa9Solicitation

28--ENGINE,DIESEL, IN REPAIR/MODIFICATION OF

Responses closed . Full description on SAM.gov.

Overview

Response deadline
3:30 PM EST
Posted
October 9, 2026
Notice type
Solicitation
NAICS
333618: Other Engine Equipment Manufacturing
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVSUP.NAVSUP WEAPON SYSTEMS SUPPORT.NAVSUP WSS PHILADELPHIA.NAVSUP WEAPON SYSTEMS SUPPORT
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
N0038326QPD19
Notice ID
eb4b7d124b19403cace794cd3a242aa9

Description

CONTACT INFORMATION ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT x WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) Invoice and receiving report combo type Source TBD TBD TBD See Schedule TBD TBD NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18)) MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003) 12 Months 60 Days After Discovery of Defect EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026) BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)) BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026)) ROYALTY INFORMATION (APR 1984) NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008)) x Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ##49 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: ENGINE,DIESEL ;2815 014553750; NSN , ;1D81C-9246; Part Number, Shall be performed IAW: ENGINE,DIESEL ;LATEST; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: ENGINE,DIESEL ;1D81C-9246; P/N, ;2815 014553705; NSN, ;LATEST; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. ENGINE,DIESEL ;MELTON SALES & SERVICE; Company Name , ;13 PETTICOAT BRIDGE ROAD, COLUMBUS, NJ 08022; Address , ;4X8W5; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1SolicitationCurrent

    28--ENGINE,DIESEL, IN REPAIR/MODIFICATION OF

    Notice eb4b7d124b19403cace794cd3a242aa9 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeSep 18, 2026

    28--ENGINE,DIESEL, IN REPAIR/MODIFICATION OF

    Notice a3e9fb513ee64cfead6b2d5fa43c5d0f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
-Solicitation11/03/2026
-Solicitation10/29/2026
-Solicitation10/29/2026
Sources Sought Notice/Request for Information Repair of LCS 2 Class Waterjet and Impeller Shaft Assemblies SUBJECT – The Naval Surface Warfare Center, Philadelphia Division (NSWCPD) is seeking sources for LM2500 Gas Turbine Assembly Repairs THIS SOURCES SOUGHT IS NOT A REQUEST FOR PROPOSAL. It is a market research tool being used to determine potential firms capable of providing the supplies/services described herein prior to determining the method of acquisition. SOURCES SOUGHT DATE: 6 November 20226 The scope of this contract is to perform the repair of the following items: Item Titanium Compressor Casings Steel Compressor Cases Compressor Rear Frames (CRF) Power Turbine Cases Turbine Rear Frames (TRF) Current Contract – N64498-22-D-4001 (Firm Fixed Price (FFP) single Indefinite Delivery Indefinite Quantity (IDIQ) contract) INCUMBENT – Component Repair Technologies, Inc. Anticipated Contract Type – Two year extension of a Firm Fixed Price (FFP) single Indefinite Delivery Indefinite Quantity (IDIQ) contract is anticipated. Period of Performance – The performance period will span two additional years. NAICS – 333618 CLASSIFICATION CODE (PSC/FSC): – J028 TECHNICAL CODE – 424 ANTICIPATED AWARD DATE – January 2027 Response Date – 24 November 2026 Contact Points – Anthony Piccari, anthony.j.piccari.civ@us.navy.mil Capability Statements: Interested businesses are invited to submit capability statements, not to exceed five (5) double spaced, single-sided pages in length, demonstrating their ability to fulfill this requirement. Capability Statements must address, at a minimum the following: Section 1: Introduction. Identify the Sources Sought Number and Title Section 2: Corporate Description. Name of Company and address Ownership and business size, including whether 8(a), based on identified NAICS Points of contact, including: Name, title, phone, and e-mail address CAGE Code and SAM UID Company’s Current Facility Clearance Level (if any) A statement that the company either has or does not have an approved accounting system, as required in Federal Acquisition Regulation (FAR) 16.301-3(a)(3) for cost-reimbursement contracts. Section 3. Past/Current Performance. Suggested language: Provide one (1) example of prior/current corporate experience performing efforts of similar scope within the last three years, including contract number, organization supported, indication of whether as a prime or subcontractor, contract values, Government point of contact with current telephone number, and a brief description of how the referenced contract relates to the services described in the Draft SOW. Section 4. Technical Response. Provide a detailed technical response that addresses the tasks identified in the Draft SOW. Information should include: Contractors technical ability, or potential approach to achieving technical ability, to perform at least 51% of the cost with its’ own employees in accordance with FAR 52.219-14 The contractor’s capacity, or potential approach to achieving capacity, to execute the requirements of the SOW. This response should include a discussion of resources available such as corporate management and currently employed personnel to be assigned to tasks under this effort to include professional qualifications, specific experience of such personnel, and the ability to have personnel located at the locations specified Contractor’s ability to begin performance upon contract award. Attachments: Attachment (1) PWS_SOW LM2500 LCR Extension Note: The requested information is for planning purposes and does not constitute a commitment, implied or otherwise, that a procurement action will be issued nor will the Government pay for the information solicited. All information and data received in response to this sources sought notice that is marked or designated a corporate proprietary information will be fully protected and held in strict confidence. Milestones – It is anticipated that procurement milestones will occur on or around the following dates: Extension Modification: January 2027 Note: No telephone responses will be accepted. No company response received after the advertised due date and time will be accepted. No exceptions to this receipt deadline will be granted under any circumstances. Responses must be received no later than 5:00pm EST on 24 November 2026 by e-mail to anthony.j.piccari.civ@us.navy.mil. This Sources Sought is for market research purposes only and does NOT constitute a Request for Proposal (RFP). This notice shall not be construed as a contract, a promise to contract, or as a commitment of any kind by the Government. The Government is NOT seeking or accepting unsolicited proposals. This Sources Sought Notice is issued solely for conducting market research in accordance with FAR Part 10 and gathering information for planning purposes. The Government WILL NOT PAY for any information received in response to this Sources Sought, and the Government will not compensate the respondent for any cost incurred in developing the response to this Sources Sought. The Government will not release any information marked with a proprietary legend received in response to this Sources Sought to any firms, agencies or individuals outside the Government without written permission in accordance with the legend. Please be advised that all submissions become Government property and will not be returned.
-Market Research11/24/2026
Login at https://piee.eb.mil and search for 'N6449826R0547' to obtain more details.*
-Solicitation12/03/2026

Additional Details

Solicitation Number

N0038326QPD19

Archive Date

Nov 24, 2026

Office Address

PHILADELPHIA, PA, 19111-5098