GovChime
Notice ID: 401c4876ee9f4a9e8904bf42915551adAward NoticeAwardedArchived

Dismantle of Monarch Milling Machine

Awarded on September 22, 2026. The description is published on SAM.gov: Full description on SAM.gov.

Awarded tounder N32253-26-P-0066 (source: SAM.gov award notice)• $36.9K

Overview

Posted
September 23, 2026
Notice type
Award Notice
Set-aside
Small Business Set Aside - Total
NAICS
238910: Site Preparation Contractors
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVSEA.NAVSEA SHIPYARD.PEARL HARBOR NAVAL SHIPYARD IMF
Place of performance
JBPHH, Hawaii, 96860
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Sep 22, 2026
Award amount (SAM.gov award notice)
$36.9K

Identifiers

Solicitation number
N32253-26-P-0066
Notice ID
401c4876ee9f4a9e8904bf42915551ad
Award number (PIID)
N32253-26-P-0066

Description

No description in the SAM.gov data feed for this notice.

Full description on SAM.gov

Award Overview

Award Number

N32253-26-P-0066

Award Amount (SAM.gov award notice)

$36.9K

Award Date

Sep 22, 2026

Awardee

Awardee Address

Waianae, HI 96792, UNITED STATES

Original Solicitation

Notice ID: 401c4876ee9f4a9e8904bf42915551ad

Posted Date: Sep 23, 2026

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (11)

  • Solicitation Amendment N3225326Q00790001 SF 30 - issued.pdf

    177 KBAdded in Solicitation version 4Posted
    Download
  • PWS_Monarch Milling Machine rev1_2026.09.08.pdf

    273 KBAdded in Solicitation version 4Posted
    Download
  • Vendor_QandA_Milling_Machine_Dismantle.pdf

    89 KBAdded in Solicitation version 4Posted
    Download
  • Solicitation - N3225326Q0079 - issued.pdf

    275 KBAdded in Solicitation version 1Posted
    Download
  • PWS_Monarch Milling Machine.pdf

    213 KBAdded in Solicitation version 1Posted
    Download
  • Appendix I Health and Safety.pdf

    147 KBAdded in Solicitation version 1Posted
    Download
  • Appendix II Environmental Guidelines.pdf

    187 KBAdded in Solicitation version 1Posted
    Download
  • Appendix III Contractor Security Requirements.pdf

    303 KBAdded in Solicitation version 1Posted
    Download
  • Contractor Crane Requirement.pdf

    7.7 MBAdded in Solicitation version 1Posted
    Download
  • Operations Security Contract Requirements (OPSEC).pdf

    1.2 MBAdded in Solicitation version 1Posted
    Download
  • Wage Determination.pdf

    383 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 3
    Version 3SolicitationArchived

    Dismantle of Monarch Milling Machine

    Notice 8bf3638884294a78998ed4104e034418 on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Dismantle of Monarch Milling Machine

    Notice 401c4876ee9f4a9e8904bf42915551ad on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The Tonto National Forest is looking to achieve a more sustainable recreation program. Through this project, several recreation areas will be decommissioned in the Tonto Basin Ranger District (RD), and Globe RD. The decommission of campgrounds at the Tonto Bassin RD is the base bid and at Globe RD, it is an option bid. The intent of this work is to remove and safely dispose outside of the National Forest boundaries, recreational accommodations that include but not limited to Entry station buildings, toilets buildings, sidewalks, asphalt pavement, fish cleaning stations, septic system, and parking lots.
-Combined Synopsis11/30/2026
This project includes all work to demolish the existing fuel system. The existing fuel system consists of, but is not limited to, a 5,000-gallon diesel tank, diesel dispenser, concrete containment, light poles, and Automatic Tank Gauge.
-Market Research10/01/2026
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details.
-Combined Synopsis11/23/2026
Fermi National Accelerator Laboratory (Fermilab) is soliciting proposals for an Indefinite Delivery Indefinite Quantity (IDIQ) type Master Subcontract for Utilities Excavation and Repair Services for Fermilab located in Batavia, IL. Fermi Forward Discovery Group (FFDG) seeks to find a qualified subcontractor to perform on-call, scheduled, and emergency excavation services and utility repairs, as described in Exhibit C, Statement of Work, and the requirements of each task order. Work will be performed across the Fermilab site, which covers approximately 6,800 acres in Kane and DuPage Counties and includes approximately 375 buildings and structures. The site contains a wide variety of soil types and terrain, such as clay soils, fill, and saturated soils, in settings that include developed areas, open prairie, woodlands, wetlands, and areas adjacent to ponds and waterways. Offerors should consider these conditions in their technical approach, equipment selection, and pricing. Fermilab operates 24 hours per day, 365 days per year, and the work must support uninterrupted laboratory operations. The Request for Proposal and all Exhibits are located at Sam.gov under Solicitation number 385439GMK. Questions Close on November 18, 2026 at 5:00 pm CST. All questions must be submitted in writing to ginakern@fnal.gov. The Request for Proposal (RFP) CLOSES on December 7, 2026 at 3:00 pm CST. Please email your proposals with all required documents to ginakern@fnal.gov.
-Solicitation12/07/2026
**********UPDATE 11-5-2026********** AMENDMENT 001 posted today with the following five (5) updated and/or new attachments: 1. 127EAX27Q0007_0001 2. RFI Questions and Responses_127EAX27Q0007_Amendment 001 3. Attachment F1_Wage Determination_Grant County_NM20260019 5.18.2026 4. Attachment F2_Wage Determination_Catron County_NM20260010_5.18.2026 5. Attachment F3_Wage Determination_Sierra County_NM20260012_5.18.2026 **********End of Amendment 001********** Commercial Construction Requirement Furnish all materials, labor, equipment, supervision, tools, and utilities required to perform operations necessary to (A) demolish five existing vault toilets and to (B) decommission and then relocate three other CXT® style vault toilets. There is one option item that includes the demolition of one single user Romtec® vault toilet and the procurement and installation of a new CXT® “Gunnison” single user vault toilet. A second option is to procure a toilet and have it delivered but with no installation.
-Solicitation11/17/2026

Additional Details

Solicitation Number

N32253-26-P-0066

Archive Date

Oct 7, 2026

Office Address

PEARL HARBOR, HI, 96860-5033