GovChime
Notice ID: ca6e95f8900e93abe91091a90bae71d9Solicitation

Z--Replacement of Water Distribution Line near Galley at NAS II Sigonella, Sicily, Italy

Archived on July 3, 2019. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
June 15, 2012
Notice type
Solicitation
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFACSYSCOM EUROPE AFRICA CENTRAL
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
N3319112T0014
Notice ID
ca6e95f8900e93abe91091a90bae71d9

Description

This is not a request for either a quote or proposal, or an invitation for bid. The intent of this pre-solicitation synopsis is to identify potential offerors for the Replacement of Water Distribution Line near Galley at NAS II Sigonella, Sicily, Italy by means of by means of a firm-fixed-price construction contract. All contractors proposing on Department of Defense solicitations must be registered in the Central Contractor Registration (CCR) prior to award of the contract. The requirements will be procured utilizing Federal Acquisition Regulation (FAR) Part 13 Simplified Acquisition Procedures. The North American Industry Classification System (NAICS) code is 237110. The estimated price range is 18,727–74,900 Euros. The anticipated requirement includes, but is not limited to, all labor, material, and equipment to replace approximately 150 meters of 200mm iron pipe and associated fittings from Gate Valve MH-1 to Gate Valve MH-2. New water line shall be type PN16 200mm High Density polyethylene (HDPE). All joints shall be mechanical or heat fused. Replace fire hydrant #46 and isolation valve. Fire hydrant shall have American standard hose fittings. New pipe shall be laid on a 20cm sand bed and it shall have minimum of 20cm of sand cover prior to fill. Thrust blocks shall be provided at all changes in direction greater that 30 degrees and at the fire hydrant base. Old line shall be removed and disposed and new line may be installed in the same trench. The new water line shall be pressure tested with final approval of Construction manager (CM). New distribution piping shall be disinfected to prevent bacterial contamination and flushed prior to putting into service. All work shall be performed in accordance with the most current version of the Army Corps of Engineers Safety Manual, EM-385-1-1, and in accordance with all applicable Italian safety laws and norms. The anticipated period of performance is 60 calendar days from the date of contract award. Offerors can download a copy of when it becomes available on the EURONECO website. The solicitation is expected to be issued on our about 31 May 2012. Quotes are expected to be due 30 days after issuance of the solicitation. All dates are tentative and are subject to change. A pre-quote conference and site visit will be indicated on the solicitation documents. All technical and contractual questions regarding this pre-solicitation notice must be submitted in writing to the Contract Specialist at: mark.gelsinger@eu.navy.mil.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Mark A. Gelsinger 095-86-6276

Documents

No documents available.

Lifecycle

Solicitation:N3319112T0014
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationMay 15, 2012

    Z--Replacement of Water Distribution Line near Galley at NAS II Sigonella, Sicily, Italy

    Notice c1b2b56eb182586c5e3ab01e49bd613c on SAM.gov

  2. SolicitationCurrentJun 15, 2012

    Z--Replacement of Water Distribution Line near Galley at NAS II Sigonella, Sicily, Italy

    Notice ca6e95f8900e93abe91091a90bae71d9 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

N3319112T0014

Archive Date

Jul 3, 2019