Intent to Sole Source: Chant Vertical Pull Test Machine Troubleshoot and Repair
Archived on January 23, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:30 PM EST
- Posted
- December 29, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 541380: Testing Laboratories and Services
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVSEA.NAVSEA SHIPYARD.PORTSMOUTH NAVAL SHIPYARD GF
- Place of performance
- Kittery, Maine, 03904
- PSC
- J052: MAINT/REPAIR/REBUILD OF EQUIPMENT- MEASURING TOOLS
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- N3904026Q5120
- Notice ID
- 8b8c72d04ded4c50930248bf0ccba57b
Description
NOTICE OF INTENT TO SOLE SOURCE:
Portsmouth Naval Shipyard intends to award a firm-fixed-price contract to Chant Engineering under the authority of FAR 13.106-1(b). Chant Engineering is the Original Equipment Manufacturer (OEM) of the Chant Model 31375-01-Proof Test Machine and the only known source capable of providing the repairs due to the proprietary nature of the requirement. This notice is not a request for competitive proposals; however, any responsible source who believes they can meet this requirement may submit a capability statement which will be considered by the agency.
SCOPE:
Troubleshooting and repair for the CHANT vertical Pull Test Machine, in addition this contract will also cover a yearly Preventative maintenance service yearly. This will be for Base +4 years. After each visit the contractor shall provide a detailed Service report, stating all findings and corrective actions needed to bring this machine back to OEM specs.
MACHINE IDENTIFICATION:
ALPHA DESIGNATION- FAP
Model# 9753-01
Serial# N00189-08-P-PY74
LOCATION:
Portsmouth Naval Shipyard; Kittery, Maine
Period of Performance:
Base Period of Performance: 1/13/2026 to 1/11/2027
- Option 1 Period of Performance: 1/12/2027-1/10/2028
- Option 2 Period of Performance: 1/11/2028-1/9/2029
- Option 3 Period of Performance: 1/10/2029-1/8/2030
- Option 4 Period of Performance: 1/9/2030-1/7/2031
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (6)
- Download
N3904026Q5120 Combined Synopsis Solicitation.pdf
1.0 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
N3904026Q5120 Attachment 1 CDRL Exhibit A.pdf
183 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
N3904026Q5120 Attachment 2 Work Request Form.pdf
234 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
N3904026Q5120 Attachment 3 Limited Source Justification Redacted.pdf
498 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
N3904026Q5120 Attachment 4 Wage Determination.pdf
3.8 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
N3904026Q5120 Attachment 5 OPSEC Security Form Redacted Sig.pdf
859 KBAdded in Combined Synopsis/Solicitation version 3Posted
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
Intent to Sole Source: Chant Vertical Pull Test Machine Troubleshoot and Repair
Similar Opportunities
Additional Details
Solicitation Number
N3904026Q5120
Archive Date
Jan 23, 2026
Office Address
PORTSMOUTH, NH, 03801-5000