Notice of Intent to Sole Source – NSA Annapolis, Maryland UESC
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM EST
- Posted
- October 26, 2026
- Notice type
- Presolicitation
- NAICS
- 221122: Electric Power Distribution
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVFAC.NAVFAC ATLANTIC CMD.NAVFAC WASHINGTON.NAVFACSYSCOM WASHINGTON
- Place of performance
- Annapolis, Maryland
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- N40080-27-R-9901
- Notice ID
- 5a20de63cc1c43fd82f61d00ca7b03e7
Description
The Naval Facilities Engineering Systems Command (NAVFAC) intends to award a Utility Energy Service Contract (UESC) to Baltimore Gas and Electric Company (BGE) for the design, construction, commissioning, and financing of a comprehensive energy resilience project at Naval Support Activity (NSA) Annapolis, Maryland.
The proposed project, estimated at approximately $45 million, will include a Combined Heat and Power (CHP) cogeneration plant integrated with a microgrid to enhance installation energy resilience. Major project elements include:
A CHP system supporting an estimated 19 MW peak electrical demand, including three natural gas-fired turbines and associated heat-recovery systems;
An integrated microgrid control system capable of island-mode operation during utility grid outages;
An absorption chiller at the Lejeune Chilled Water Plant (597U) utilizing recovered waste heat;
Relocation and upgrade of the 13C-1 electrical substation;
Required natural-gas infrastructure upgrades and electric-grid interconnection activities;
An Investment Grade Audit (IGA), design, engineering, construction, testing, commissioning, and construction management; and
Operator training and project turnover documentation.
Basis for Intended Sole Source
The Government intends to use other than full and open competition pursuant to 10 U.S.C. § 3204(a)(1) and FAR 6.302-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The proposed action will be implemented as a UESC pursuant to 10 U.S.C. § 2913(d).
BGE is the franchised electric and natural-gas utility serving NSA Annapolis and owns and operates the affected utility distribution infrastructure. GSA Areawide Public Utility Contract No. 47PA0724D0003 provides for BGE electric, natural-gas, and energy-management services within its franchised service territory.
The contemplated UESC requires integrated responsibility for natural-gas capacity upgrades, electric-system interconnection, grid coordination, and modifications affecting BGE-owned or controlled infrastructure. These functions are integral to the CHP, microgrid, and island-mode requirements.
The Government issued a Sources Sought Notice on February 5, 2026, which closed on February 20, 2026. Five firms responded to the notice. Based on the Government’s market research, acquisition planning, and review of the responses received, Baltimore Gas and Electric Company (BGE) was determined to be the only responsible source capable of satisfying the Government’s requirements. BGE was the only respondent possessing the requisite utility-service authority, control of the affected infrastructure, and ability to execute or authorize the necessary utility-system modifications and interconnection activities required to perform the contemplated UESC.
Submission of Capability Information
This notice is not a request for competitive proposals. However, responsible sources that believe they possess the capability, legal authority, and financing capacity to perform the complete requirement may submit a written capability statement.
Capability statements should demonstrate:
Legal authorization to provide the required electric and natural-gas utility services to NSA Annapolis;
Authority and ability to execute or authorize the required utility-infrastructure modifications;
Ability to perform and coordinate required electric-grid interconnection activities, including coordination with PJM Interconnection and applicable stakeholders;
Experience with projects of comparable size, scope, and complexity under a UESC or comparable utility-financed arrangement; and
Ability to provide the financing necessary to implement the project.
Responses shall contain sufficient information for the Government to determine whether the respondent can satisfy the complete requirement and shall be submitted electronically in PDF format to olisha.g.costa.civ@us.navy.mil no later than 1:00 PM Eastern Time on Tuesday, November 10, 2026.
The Government will consider timely responses before determining whether to proceed with the contemplated sole-source action. Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement. The Government will not pay for information submitted in response to this notice.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
- 1Version 1PresolicitationCurrent
Notice of Intent to Sole Source – NSA Annapolis, Maryland UESC
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 0001 The outcomes to be achieved are for the contractor to provide all management, supervision, quality control, labor, tools, equipment, material, supplies, incidental engineering, and transportation necessary to provide Maintenance for Electrical Receiving and Distribution Systems and Facilities, Supervisory Control and Data Acquisition (SCADA) System at the U.S. Naval Air Facility Atsugi, Japan as outlined in the Performance Work Statement. | 66% | Solicitation | 09/04/2026 |
SOURCES SOUGHT NAICS Code: 221122 Electric Power Distribution 221210 Natural Gas Distribution 221310 Water Supply and Irrigation Systems 1. Contract Information: The Department of Veterans Affairs (VA) is conducting market research to identify qualified sources capable of providing the design, implementation, and operation of a Utility Energy Services Contract (UESC) energy management project for the VA Medical Center (VAMC) located at: Washington VAMC: 50 Irving Street, Northwest Washington, DC 20422-0001 2. Background: Title 42 U.S.C. 8256 authorizes federal agencies to participate in utility incentive programs designed to increase energy efficiency, enhance water conservation, and manage electricity demand. Agencies may accept financial incentives, goods, or services generally available to utility customers when such incentives support energy or water conservation efforts. Agencies are encouraged to negotiate with electric, water, and gas utilities to develop cost-effective demand management and conservation programs tailored to agency needs. If an agency meets the eligibility criteria applicable to other customers of a utility incentive program, the utility may not deny the agency rebates or other eligible incentives. 3. Description of the Requirement: A UESC enables agencies to complete energy savings projects without upfront capital investment or specific congressional appropriations. Under a UESC, the selected utility provider finances the project using its own funds, third party financing, or a combination and is repaid through the resulting utility cost savings. The Utility will: Conduct a comprehensive energy audit. Identify energy saving improvements. Design and construct the approved project. Develop and implement a savings assurance plan. Arrange project financing. Energy savings will be measured throughout the financing term to ensure repayment through verified savings. 4. Project Information: The contractor shall design, engineer, construct, commission, and, if necessary, arrange third party financing for VA identified Energy Conservation Measures (ECMs). The VA s preliminary ECM Wish List represents the full range of ECM categories that may be evaluated during development of the UESC and includes, but is not limited to: Chiller Plant Improvements Building Automation Systems / Energy Management Control Systems Heating, Ventilating, and Air Conditioning Systems Lighting Improvements Building Envelope Modifications Chilled Water, Hot Water, and Steam Distribution Systems Electric Motors and Drives Water and Sewer Conservation Systems Energy Utility Distribution Systems Energy Cost Reduction through Rate Adjustments Energy Related Process Improvements Commissioning / Retro Commissioning (RCx) Advanced Metering Systems Note: The specific ECMs anticipated for this project and evaluated for contractor capability are listed in Question 12 of the Sources Sought Questionnaire. These represent the ECM categories most likely to be pursued initially under this UESC, while the Section 4 list reflects the broader set of ECMs that may be reviewed, expanded, or refined during audit and project development. Additional Site-Specific Program Information: The Government anticipates running an accelerated chiller plant design effort immediately following Utility selection. This design effort will occur concurrently with the UESC Feasibility Study and is intended to address critical chilled water, and HVAC system needs. The VAMC is also evaluating potential tie-ins with the VA Facility Recapitalization Program, which focuses on correcting FCA identified deficiencies across core mechanical subsystems including primary and secondary chilled water, cooling towers, air handling equipment, and associated HVAC infrastructure. While these recapitalization activities are separate from this Sources Sought, the accelerated chiller design effort and any related recapitalization coordination may inform future UESC project development 5. Submission Requirements: The Government does not intend to rank submittals or reply to interested companies/firms. This synopsis is for Market Research purposes only and is not a request for proposal (RFP) or request for quote (RFQ). The Government will NOT reimburse respondents for any costs incurred in preparation of a response to this notice. Your firm's response is requested no later than 12:00PM (Noon) EDT, Monday, October 12, 2026. Send responses by email to Justin O Rourke at justin.orourke@va.gov. Responses must: Be limited to 20 pages, including the completed questionnaire. Exclude brochures, cover letters, and other extraneous materials. Be submitted electronically; hard copy and facsimile submissions will not be accepted. Personal visits or requests for the purpose of discussing this announcement will not be considered, scheduled, nor will replies be sent. If additional information is required, the Government may contact responding firms directly. Sources Sought Questionnaire 1. Is your business currently a utility provider to any of the following VAMC? Washington VAMC: 50 Irving Street, Northwest Washington, DC 20422-0001 2. Is your business currently authorized by the District of Columbia to provide utility services to any of the aforementioned VAMC? 3. Provide the name and address of your business? 4. Identify a responsible point of contact ,including name, phone number, and email address. 5. Indicate your business size and socioeconomic status. (Large, Small, 8(a), HUBZone, Service Disabled Veteran Owned Small Business, etc.)  6. Does your company plan to use an ESCO partner for this project? If yes, indicate whether the partnership will be competed and describe the competition and selection method. 7. Does your company have a GSA Area-wide Agreement? If yes, provide the GSA Contract Number. 8. Provide up to three examples of financed energy conservation projects in which your firm acted as the prime contractor, joint venture partner, or first tier subcontractor. For each project, include: Scope of contractual responsibilities Location Client Construction cost and total financed amount Customer point of contact 9. Has your company performed a UESC in accordance with DOE/FEMP Guidelines? If yes, provide the project location and project dollar value. 10. Would your company be willing to perform the Feasibility Study at risk? (Payment for the Feasibility Study will occur only if the project is awarded.) 11. Does your company have experience coordinating rebates, incentives, or interconnect/transmission discussions or agreements relevant to proposed projects? 12. Based on VA s preliminary ECM list in Section 4, identify your company s expertise and experience with the ECM categories most relevant to this project, including but not limited to the following a. Building Automation Systems / Energy Management Control Systems b. Heating, Ventilating, and Air Conditioning including Boilers and Chillers  c. Lighting Improvements  d. Building Envelope Improvements  e. Chilled Water, Hot Water, and Steam Distribution Systems f. Renewable Energy Systems  g. Commissioning/Retro-Commissioning  h. Advanced Metering Systems 13. Provide a summary of your company s expertise and past performance in implementing ECMs related to chilled water plant upgrades. Include examples of projects where your team has successfully delivered solutions for chilled water plant design, modernization, hydronic distribution systems, cooling towers, chiller controls, phased central plant work, commissioning, and maintaining chilled water service during construction. Highlight any innovative approaches or lessons learned that demonstrate your capability in this area. | 65% | Market Research | 10/12/2026 |
Please see attachments for full request for information; as well as, sample contract for review and comment. | 59% | Market Research | 05/25/2026 |
NAVFACSYSCOM NW intends to issue a Limited-Source Utility Service Master Basic Ordering Agreement (BOA) to utility service providers that have agreements to provide utility services within the Northwest?s Area of Responsibility (NW AOR), with most services performed in Washington State under NAICS Codes 221122 Electric Power Distribution and 221210 Natural Gas Distribution. Only current providers with utility service agreements with NAVFACSYSCOM NW will be considered. The capacity of the Master BOA may not exceed $99,000,000 dollars with a five-year period of performance. Multiple BOAs will be awarded off the Master BOA to authorized utility service providers for energy management services, including energy and water efficiency improvements and energy demand reduction under 42 U.S.C. ? 8256. Services will emphasize energy demand or conservation including improving operation and maintenance, preliminary assessments, field investigations, Investment Grade Audit Reports, installing materials, devices, instruments, or equipment, or eliminating energy load to reduce the amount of energy needed in a facility. Additional utility services include emergency utility work in support of maintenance, repairs or outages, and utility construction services under10 U.S.C. ? 2913(d). Utility providers shall furnish all material, supervision, tools, equipment, labor, transportation, subcontract management, project management and, upon mutual agreement, initial capital to implement such projects as specified in individual Task Orders. No funding will be obligated as part of this synopsis or on the Master BOA. This solicitation will be open for five years or until the agreement capacity is met. All questions related to this Synopsis should be directed to: Eleanor Drake at Eleanor.drake.civ@us.navy.mil. | 59% | Combined Synopsis | 05/30/2025 |
The purpose of this Award Notice is to post the Justification for Other Than Full and Open Competition (JOFOC) for the SSC Tornado Resiliency - Generator Replacement for Test Complex, 80SSC026F0007. See attached document for further information regarding this action. | 57% | Sole Source / J&A | Open |
Additional Details
Solicitation Number
N40080-27-R-9901
Archive Date
Nov 25, 2026
Office Address
WASHINGTON NAVY YARD, DC, 20374-5018