GovChime
Notice ID: 78f48c2a10de8c6b96494c24a8f2a44cSources Sought

J--REPAIR BOILER AND CHILLER HVAC REPAIRS, NOSC PEORIA IL

Archived on May 26, 2012. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
May 22, 2012
Notice type
Sources Sought
Set-aside
Women-Owned Small Business
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFACSYSCOM MID-ATLANTIC
PSC
J: MAINT, REPAIR, REBUILD EQUIPMENT
Last updated
Dec 5, 2025

Identifiers

Solicitation number
N4008312R1032
Notice ID
78f48c2a10de8c6b96494c24a8f2a44c

Description

The work involves demolition, renovation and new construction for improvement of the HVAC systems in Building 19 of the Navy Operational Support Center, Peoria, Illinois. The work includes demolishing two air handling units and replacing them with new units, demolishing the hot water boiler and providing two new high efficiency condensing boilers, demolishing and replacing the hot water piping in the boiler room, hot water circulating pumps, hot water expansion tank, hot water air separator and pot feeder, demolishing the indoor chiller and its associated outdoor condensing unit and providing a new outdoor air cooled chiller, demolishing and replacing the chilled water piping in the boiler room, chilled water circulating pump, chilled water expansion tank, chilled water air separator, and pot feeder, demolishing the existing HVAC pneumatic control system and the Network controllers and providing a new DDC control system, demolishing the existing exhaust fans serving the basement toilet and locker rooms and providing a new energy recovery ventilation unit for the basement toilet and locker rooms, demolishing and replacing the existing exhaust fan serving the first and second floor toilet and locker rooms, demolishing the exhaust fans in drill hall storage rooms 125 and 127 and providing an exhaust relief fan in the drill hall ductwork that will be interconnected with the drill hall air handler’s outside air damper, demolishing the unit heaters and exhaust fans in the fitness room and providing a heating and cooling system for the fitness room, and providing testing and balancing of the HVAC and exhaust systems including adding volume dampers in existing ductwork as required.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Tom Stevens 847 688 3368 x106 tom.f.stevens@navy.mil tom.f.stevens@navy.mil

Documents

No documents available.

Lifecycle

Solicitation:N4008312R1032
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. 3×
    Market ResearchCurrentMay 1, 2012

    J--REPAIR BOILER AND CHILLER HVAC REPAIRS, NOSC PEORIA IL

    Notice 78f48c2a10de8c6b96494c24a8f2a44c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

N4008312R1032

Archive Date

May 26, 2012