GovChime
Notice ID: 8027c518065f465cbe183d7ea721d522Sources Sought

CONTROL SYSTEM UPGRADES AND REPLACEMENT WORK ON TADANO INFRASTRUCTURE SOLUTIONS CO., LTD. LAND PORTAL CRANES, LC47 AND LC48 AT BERTH 12 IN THE COMMANDER FLEET ACTIVITIES YOKOSUKA (CFAY), JAPAN

Archived on April 21, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:30 AM UTC+09:00
Posted
March 4, 2026
Notice type
Sources Sought
NAICS
NAICS 33324 Industrial Machinery Manufacturing (reported as 333240)
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFACSYSCOM FAR EAST
PSC
Z1PZ: MAINTENANCE OF OTHER NON-BUILDING FACILITIES
Last updated
Nov 2, 2026

Identifiers

Solicitation number
N40084-26-R-0405
Notice ID
8027c518065f465cbe183d7ea721d522

Description

The purpose of this procurement is to acquire control system upgrades and replacement work on land portal cranes, LC47 and LC48 at Berth 12. The upgrades and replacement work includes but is not limited to upgrading the cranes control systems. Upgrades and replacements include: • Procure and install replacement items and materials for various electrical equipment, inverters, programmable logic controllers (PLC) to include wiring connections to the replaced items, and computer software. Contractor shall be responsible for all applicable components and sub-components to maintain accordance with the late manufacturer’s standard • Inspection for all applicable components and sub-components for conditions, cleanliness, damage, defects, deterioration, corrosion, proper operating record to load/unload for applicable capacities, electrical connections, and the locations/positions correction as required, and verify the equipment location is free of debris and/or flammable material, during and/or end of the work scheduled daily and the completion of the work. Validation is required for the designated crane conditions and applicable capacities upon the receipt of task orders. Note: The Contractor shall record all operated works specifications and results, and submit it per SOW. Upon completion of above on-site works, put systems back to normal operation and check to ensure that equipment and systems are operating properly. Validate the operation/work entire area for the task order, and ensure all applicable power on/off device, on/off method, and positioned correctly before and after performing the work is the high priority for the Contractor protection in performance safety, and the site personnel/property safety.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:N40084-26-R-0405
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentMar 4, 2026

    CONTROL SYSTEM UPGRADES AND REPLACEMENT WORK ON TADANO INFRASTRUCTURE SOLUTIONS CO., LTD. LAND PORTAL CRANES, LC47 AND LC48 AT BERTH 12 IN THE COMMANDER FLEET ACTIVITIES YOKOSUKA (CFAY), JAPAN

    Notice 8027c518065f465cbe183d7ea721d522 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

N40084-26-R-0405

Archive Date

Apr 21, 2025

Place of Performance Country

JPN

Office Address

FPO, AP, 96349-0013