GovChime
Notice ID: d85f32690a885b975a4fbd530a994097Award NoticeAwarded

Y--Repair Shoreline Revetment Diego Garcia

Awarded on September 30, 2010. Full description on SAM.gov.

Awarded tounder N4008410C0087 (source: SAM.gov award notice)• $9.0M

Overview

Posted
October 1, 2010
Notice type
Award Notice
NAICS
238190: Other Foundation, Structure, and Building Exterior Contractors
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFACSYSCOM FAR EAST
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Sep 30, 2010
Award amount (SAM.gov award notice)
$9.0M

Identifiers

Solicitation number
N4008410R0087
Notice ID
d85f32690a885b975a4fbd530a994097
Award number (PIID)
N4008410C0087

Description

Repair 700 feet Shoreline Revetment Diego Garcia

Full description on SAM.gov

Award Overview

Award Number

N4008410C0087

Award Amount (SAM.gov award notice)

$9.0M

Award Date

Sep 30, 2010

Awardee

Original Solicitation

Notice ID: d85f32690a885b975a4fbd530a994097

Posted Date: Oct 1, 2010

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Patricia Bly 046-816-9324 Patricia Bly, Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:N4008410R0087
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentOct 1, 2010

    Y--Repair Shoreline Revetment Diego Garcia

    Notice d85f32690a885b975a4fbd530a994097 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Overview of the project: The U.S. Embassy has a project requirement to repair a section of the 103 Roi Baudouin residence Compound front perimeter wall that collapsed due to a big tree roof and a heavy rain. In addition to the collapsed portion, several addition feet will need to be rebuilt due to be unstable after the collapse. The wall is estimated to be 22m long, with the exact length needed to be repaired to be revealed during the walkthrough stage of the project solicitation. The contractor will also make sure to replace the damaged electrical wire as well as lights, to replace the concertina wire, backfill the entrance parking and then replace the pavers. The selected contractor will supply all labor, materials and equipment required to successfully complete this project. All material will be inspected and approved by the Contracting Officer Representative (COR) before installation can start. The project must be completed in 60 days, and the offer must be submitted in English. SEE ATTACHED DOCUMENT FOR FULL SOLICITATION AND SCOPE OF WORK
51%
Solicitation08/03/2026
This is a pre-solicitation synopsis for a competitive solicitation that GPO intends to post on SAM.gov on or about May 11, 2026. The scope of work includes: The concrete sidewalk and the vault structure beneath the G Street Sidewalk are showing signs of moderate to severe deterioration of the concrete and the encased structural framing. Over time and a failure of the waterproofing membrane, salt water, and other liquids constantly migrate into the reinforced slab and cause deterioration substantial damages. The contractor shall provide the labor, material, equipment, and supervision to demolish and install the sidewalk slab and to repair and renovate the vaults beams, concrete slab, waterproofing membrane, and columns and other related structures to eliminate the water migration into the basement. All the work shall be in accordance with the design drawings and specifications prepared and submitted along with this statement of work. The contractor is required to obtain permits, traffic control plans, safety, and security approval prior to construction starting. The contractor shall complete the following tasks as part of the project at the GPO G Street Sidewalk Repair: Pre-Construction Tasks Obtain all required permits and approvals. Submit project schedule, safety plan, and traffic control plan. Coordinate with GPO project management and stakeholders. Conduct pre-construction meetings and site walkthrough. Site Preparation & Demolition Install temporary barriers, signage, and traffic control measures. Set up designated staging and material storage areas. Perform selective demolition of existing structures as required. Ensure safe removal and disposal of construction debris. Material Delivery & Logistics Coordinate material deliveries in compliance with schedule. Inspect and verify all materials upon arrival. Store materials in designated secure areas. Construction & Installation Perform site grading and preparation, if applicable. Install structural components, framing, and support systems. Complete mechanical, electrical, and plumbing (MEP) installations. Install architectural finishes, including flooring, ceilings, and walls. Implement weatherproofing and insulation systems as required. Conduct equipment and systems testing to ensure functionality. Safety & Compliance Maintain compliance with OSHA and other regulatory standards. Implement and monitor safety protocols for workers and pedestrians. Address any environmental concerns, including hazardous material handling. Quality Control & Inspections Conduct periodic quality control checks. Submit required inspection and testing reports. Address any deficiencies noted in inspections. Project Closeout Complete all final construction activities and finishing work. Conduct a final walkthrough with the GPO project team. Prepare and submit as-built drawings and O&M manuals. Resolve punch list items and obtain final acceptance. Restore site and remove temporary facilities. Submit final project documentation, including warranties and certifications Period of Performace is eighteen (18) months from Notice to Proceed. A site visit will be scheduled and listed in the solicitation.
51%
Pre-SolicitationOpen
The Oklahoma Air National Guard at Will Rogers Air National Guard Base in OKC, OK is hosting an Industry Day. This is to identify novel, commercially viable, and rapid-deployment technologies for structural repair and subgrade stabilization. The purpose of this event is to conduct market research pursuant to FAR Part 10 and assess industry capabilities regarding settlement remediation, void filling, load-bearing upderpinning, and ground improvement for mission-critical facilities and pavement infrastructure.
50%
Special Notice12/09/2026
50%
AwardedOpen
50%
AwardedOpen

Additional Details

Solicitation Number

N4008410R0087

Archive Date

Oct 6, 2010