Notice ID: cea41857eafd49ceb2b6a4ee43f1d724Solicitation
USS Constitution Maintenance Dredging- Boston, MA
Archived on April 22, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−04:00
- Posted
- April 10, 2023
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVFACSYSCOM MID-ATLANTIC
- Place of performance
- Charlestown, MA, 02129
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- N4008523B2507
- Notice ID
- cea41857eafd49ceb2b6a4ee43f1d724
Description
USS Constitution Maintenance Dredging- Boston, MA. The base bid work includes all labor, material, equipment, transportation, supervision, and incidental related work to include maintenance dredging at the USS Constitution Berth, disposal at the designated Confined Aquatic Disposal (CAD) Cell disposal site, and incidental related work.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
N4008523B2507- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationFeb 13, 2023
USS Constitution Maintenance Dredging- Boston, MA
- 4×SolicitationCurrentMar 7, 2023
USS Constitution Maintenance Dredging- Boston, MA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Isle au Haut Thoroughfare Federal Navigation Project, located between Isle au Haut, Maine and Kimball Island, Maine on the outskirts of Penobscot Bay, about six miles southeast of Stonington and 25 miles east of Rockland. The Federal Navigation Project consists of a -6-foot Mean Lower Low Water (MLLW) deep by 75-foot wide extending 1,200-foot in length through the shoal in the thoroughfare.The proposed work consists of mechanically dredging approximately 3,355 cubic yards (cy) (1,183 cy required, plus 2,172 cy overdepth) of shoaled material consisting of highly compacted coarse sand and gravel, with areas of cobbles and isolated small boulders from the channel. Due to the material type, a mechanical dredge with the ability to dig highly compacted coarse sand and gravel will be required. The proposed action is to dredge to the authorized depth of -6-foot MLLW plus an additional 1-foot of required advance maintenance with an additional allowable 1-foot of overdepth (e.g. -7-foot MLLW required + 1-foot allowable OD). One-time, advanced maintenance is approved for the entirety of the 1200-foot long authorized channel. The dredged material will be placed at the Flake Island Disposal Site (FIDS) which is approximately 1 nautical mile northwest of the FNP. Placement of the dredged material (sand, gravel and cobble) at Flake Island Disposal Site will benefit both juvenile lobster habitat and juvenile cod by increasing the areas habitat complexity.The anticipated allowable dredging window is between September 15 and April 1 to avoid impacts to spawning shellfish, benthic resources, Essential Fish Habitat (EFH) of federally managed species, threatened and endangered species and interactions with mobile fishing gear. | - | Solicitation | 11/10/2026 |
Maintenance Dredging, Wareham Harbor, Wareham, MA | - | Solicitation | 01/21/2026 |
The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Wareham Harbor Federal Navigation Project, located in Wareham, Massachusetts. This procurement is a Small Business Set Aside Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Wareham Harbor FNP consists of a 2.4 mile long, 9-foot deep Mean Lower Low Water (MLLW) channel. The channel is comprised of several reaches of varying widths (100-ft to 250-ft widths) to include the entrance channel through Cromeset Neck Reach, Quahaug Bar Reach, Parkwood Beach Reach, and the Inner Harbor Reach. The proposed work consists of mechanically dredging up to appropriately 52,000 cubic yards (CY) of shoaled material over a 10.2-acre area. Most of the material is fine-grained/silt and will be transported by scow and placed at Cape Cod Bay Disposal Site (CCBDS), approximately 35 miles away. Transit from Wareham to CCBDS will occur through the Cape Cod Canal. A smaller portion of the material is sand (approx. 1,000 CY) and will be placed beneficially at a nearshore site off of Church's Beach in Cuttyhunk, Massachusetts (approximately 28 miles away). Dredging operations can start on July 1, 2026 for maintenance dredging using a mechanical dredge and placement in open water at CCBDS and Church’s Beach Nearshore Placement Site. All work must be complete by December 31, 2026. In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 28,500 CY per 30 consecutive calendar day period. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-November 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award Management website (https://www.sam.gov/) and the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at heather.m.skorik@usace.army.mil. The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Wareham Harbor Federal Navigation Project, located in Wareham, Massachusetts. This procurement is a Small Business Set Aside Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Wareham Harbor FNP consists of a 2.4 mile long, 9-foot deep Mean Lower Low Water (MLLW) channel. The channel is comprised of several reaches of varying widths (100-ft to 250-ft widths) to include the entrance channel through Cromeset Neck Reach, Quahaug Bar Reach, Parkwood Beach Reach, and the Inner Harbor Reach. The proposed work consists of mechanically dredging up to appropriately 52,000 cubic yards (CY) of shoaled material over a 10.2-acre area. Most of the material is fine-grained/silt and will be transported by scow and placed at Cape Cod Bay Disposal Site (CCBDS), approximately 35 miles away. Transit from Wareham to CCBDS will occur through the Cape Cod Canal. A smaller portion of the material is sand (approx. 1,000 CY) and will be placed beneficially at a nearshore site off of Church's Beach in Cuttyhunk, Massachusetts (approximately 28 miles away). Dredging operations can start on July 1, 2026 for maintenance dredging using a mechanical dredge and placement in open water at CCBDS and Church’s Beach Nearshore Placement Site. All work must be complete by December 31, 2026. In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 28,500 CY per 30 consecutive calendar day period. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-November 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award Management website (https://www.sam.gov/) and the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at heather.m.skorik@usace.army.mil. | - | Pre-Solicitation | Open |
Indefinite Delivery/Indefinite Quantity (IDIQ) Contract for Magazine Maintenance and Repairs at Naval Support Activity (NSA), Crane, Indiana is for all work associated with repairs and upgrades of various deficiencies of Crane Army Ammunition Activity and Navy Storage Magazines and Inert Buildings including the replacement of concrete docks, the replacement of concrete wingwalls, the repair of the joints of concrete walls/floors/ceilings, the installation/repair/replacement of steel magazine/roll-up/personnel doors/dock levelers, the sealing of cracks in concrete walls/floors/ceilings, the installation of lexan covers over existing glass blocks, the preparation and painting of doors and metal work, concrete patching, infilling openings with CMU?s, installing handrail/two-pipe railing, installing culverts, waterproofing, installing magazine roofing membrane covers, installing/repairing perimeter drains, installing/repairing/bonding grounding, removing railroad, repairing truck access areas, miscellaneous repairs, and incidental related work. The contract awarded under this solicitation shall be for a 12-month base period, plus four 12-month option periods to be exercised at the Governments discretion. The overall term of the contract shall not exceed 60 months or $45,000,000.00 whichever comes first. The contract has a guaranteed minimum of $2,500.00 that a task order will be issued concurrently with award to obligate. Once the value of the task orders placed exceeds the minimum guarantee, this minimum guarantee task order shall be modified to deobligate the funds from the task order | - | Solicitation | 01/12/2026 |
The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for the upcoming dredging project located in Providence, Rhode Island. This announcement is to determine the interest, availability and capability of Small and Large Business concerns as described below. The NAICS code for this procurement is 237990. The solicitation for this project is anticipated to be issued on or about 15 March 2027. The construction will begin in September 2027 and is expected to take approximately 2 years to complete. The estimated construction cost is between $80,000,000 and $100,000,000. The Providence River Maintenance Dredging project involves two major sequences of dredging and disposal activities. The first work sequence will be the construction of a new Confined Aquatic Disposal (CAD) cell adjacent to the Providence River. The second work sequence under this contract will include maintenance dredging of the Providence River and Harbor Federal Navigation Project (FNP) to its authorized depths and dimensions. The proposed work consists of mechanically dredging approximately 5,500,000 cubic yards (cy) of material using closed clamshell buckets for both major sequences of work over the course of two years. The new CAD cell will be in the Edgewood Basin area located adjacent to the Providence FNP (hereafter the “Edgewood Shoals North (ESN) CAD cell”). To access the CAD cell area, an access channel will be dug between the Providence FNP and the CAD cell area. The access channel will be approximately 100 ft wide and -25 MLLW deep. The CAD cell will have surface dimensions of approximately 1000 ft. by 1000 ft. and be dug to a depth of -60 MLLW. The material excavated to build the access channel is generally a mix of sandy silt and shell fragments. Within the CAD cell area the material is generally described as soft grey to black organic silt with some layers of firm sandy silt and some shell fragments and coarse-grained material. Material excavated from the access channel and CAD cell area will be placed at four locations: Port Edgewood Basin, the Fox Point Reach CAD cells, Prudence Island Disposal Site, and the Rhode Island Sound Disposal Site. This work consists of mechanically dredging approximately 3,200,000 cy to construct thew ESN CAD cell and its access channel, which must be completed before maintenance dredging of the FNP can begin. The maintenance dredging proposed work consists of mechanically dredging the Providence River FNP to the full -40 MLLW depth plus 2-feet of allowable overdepth. 2,300,000 cy (1,200,000 cy required depth, with up to 1,100,000 cy overdepth) of shoaled material consisting generally of poorly graded medium to fine sand with silt. The dredge material from this maintenance portion of work will be placed in the ESN CAD cell. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. All dredging and disposal activities for this project have prescribed work windows that incorporate environmental and recreational time of year restrictions. Refer to the Draft Specification Section provided with this announcement for specifics on the time of year work restrictions. In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 300,000 CY per 30 calendar days. The U.S. Army Corps of Engineers, New England District is requesting responses to the questions below from both small and large businesses[MC1] . Draft drawings showing a concept design plan and draft Specification Section of 01 11 00 SUMMARY OF WORK have been provided with this announcement to help provide more context for the contract work and responses to these questions. Considering the different disposal locations, are there suggestions on a bid structure that will provide for the most accurate costs of different disposal locations? Any draft restrictions that may impact dredging and/or disposal operations? Any concerns on the period of performance of September 2027 to September 2029 considering the environmental windows and amount of work? If so, why? Any comments about the bed leveling planned in the Fox Point Reach? Are there concerns about this part of the plan, if so, why? Interested firms should also demonstrate their project experience, by providing two (2) projects within the last ten years, which meet the following requirements: Dredging by mechanical means demonstrating a minimum production rate of 300,000 cubic yards in one consecutive 30-day period. Experience with placement of dredged material at an open water placement site in New England during the fall/winter months of October through March. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.), type of equipment the firm is proposing to use on the project, and two (2) example projects performed by the firm in the last ten (10) years (including Points of Contact for those projects) showing experience with the proposed equipment at the production rate listed above. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications meeting the same qualifications listed above, which will be used to support the bidder's effort. Firms may use subcontractor experience to demonstrate experience with the requirements, but the role and work performed by each team member (prime and subcontractors) on projects demonstrating that team member's experience shall be the same as the role for that team member for this project. Bid bond will need to be provided with the bid. Responses are limited to twenty pages and due by December 03 , 2026. Responses should be addressed to the U.S. Army Corps of Engineers, New England District, 696 Virginia Road, Concord, MA 01742-2751, ATTN: Kyle Hall, or electronically to Kyle.K.Hall@usace.army.mil. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. Government Agency URL: www.nae.usace.army.mil Government Agency URL Description: New England District, Corps of Engineers | - | Market Research | 12/03/2026 |
Additional Details
Solicitation Number
N4008523B2507
Archive Date
Apr 22, 2023
Office Address