GovChime
Notice ID: 987f555dcf16470589b17a1dc8b08eebSolicitation

Maintenance and Repair of Railroad Trackage at Naval Weapon Station Earle, Colts Neck, New Jersey and Other Areas of Responsibility

Archived on November 1, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
August 28, 2023
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFACSYSCOM MID-ATLANTIC
Place of performance
Colts Neck, 07722
Last updated
Sep 25, 2026

Identifiers

Solicitation number
N4008523R2526
Notice ID
987f555dcf16470589b17a1dc8b08eeb

Description

N40085-23-R-2526 Facility Investments Services for Maintenance and Repair of Railroad Trackage at the Naval Weapon Station (NWS) Earle, Colts Neck, New Jersey and Other Areas of Responsibility (AOR). Amendment 02 is issued to correct the response to Pre-proposal Inquirie (PPIs) #19, and provide a response to PPI # 23. See Contiunation sheet(s). All other Terms and Condtions remain the same. Amendment 01 is revised to incorporate the responses to Pre-Proposal Inquiries received, and rename ELIN attachment J-1502000 -15 to correctly state Attachment J-0200000-15. All other Terms and Condtions remain the same. This Amendment 01 is issued to provide responses to Pre-proposal Inquiries (PPIs), and extend the Proposal due date to 07 September 2023 @ 2:00pm vice 29 August 2023 See attached documents. All other Terms and Condtions remain the same. This acquisition is for Facility Investment Services to include performing maintenance, repair, alteration, demolition and minor construction on the Trackage (Railroad and Crane, Preventative Maintenance) and Roads & Paved Surfaces at the Naval Weapon Station (NWS) Earle, Colts Neck, New Jersey and Other Areas of Responsibility (AOR). See attached Request for Proposal (RFP) and other documentation.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:N4008523R2526
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Market ResearchOct 26, 2022

    Maintenance and Repair of Railroad Trackage at Naval Weapon Station Earle, Colts Neck, New Jersey and Other Areas of Responsibility

    Notice a9632c1c23dc439fa987cd788fae1cc9 on SAM.gov

  2. Pre-SolicitationMay 4, 2023

    Maintenance and Repair of Railroad Trackage at Naval Weapon Station Earle, Colts Neck, New Jersey and Other Areas of Responsibility

    Notice 7509a095b7dd4a5da5038a7d0b6fdccd on SAM.gov

  3. Market ResearchMay 4, 2023

    Maintenance and Repair of Railroad Trackage at Naval Weapon Station Earle, Colts Neck, New Jersey and Other Areas of Responsibility

    Notice a73b3077fc05478cb3436c158bfcb951 on SAM.gov

  4. Pre-SolicitationMay 9, 2023

    Maintenance and Repair of Railroad Trackage at Naval Weapon Station Earle, Colts Neck, New Jersey and Other Areas of Responsibility

    Notice d321db1fad194af68527e0bc487046b6 on SAM.gov

  5. 4×
    SolicitationCurrentJul 31, 2023

    Maintenance and Repair of Railroad Trackage at Naval Weapon Station Earle, Colts Neck, New Jersey and Other Areas of Responsibility

    Notice 987f555dcf16470589b17a1dc8b08eeb on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
-Solicitation10/21/2026
The US Army Corps of Engineers, Enterprise Dredge Delivery Center (EDDC), is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a large-scale construction project (exceeding $35 million) within the Cape May To Lower Township, New Jersey, Brigantine Inlet To Great Egg Harbor Inlet (Absecon Island), New Jersey, And Barnegat Inlet To Little Egg, Inlet (Long Beach Island), New Jersey area. This procurement is for Coastal Storm Risk Management (CSRM). Cape May to Lower Township, NJ (Navigation Mitigation – Beachfill): Work for the beachfill placement dredging will require a hopper and pipeline/mechanical dredge(s). The dredge(s) must have the capability to dredge material up to a depth of -40 ft NAVD88 and to transport the dredged sand to the designated areas approximately 2.6 miles away. The project for navigation mitigation (beach nourishment) is located on the Atlantic coast of New Jersey, extending from the Cape May Inlet southwest jetty to the 3rd Ave terminal groin in Cape May City. It includes the communities of the City of Cape May and Lower Township, and the US Coast Guard Training Center. The contract work will consist of a base bid to conduct pre-placement condition surveys and pump/place 600,000 cubic yards of sand from two borrow areas approximately 2.6 miles south of the Cape May Inlet jetties onto the beach at 2 locations: Area 1 (540,000 cu yds), the US Coast Guard Training Center and Area 2 (60,000 cu yds), Wilmington Ave. Options to place additional sand (100,000 cu yds) from the same borrow areas to achieve the full project design template at these same two beach locations will also be included. Sand must come from the offshore borrow areas. Trucking-in sand will not be permitted under this contract. All work under the contract must be completed no later than 1 March 2028. Brigantine Inlet to Great Egg Harbor Inlet (Absecon Island), NJ (CSRM – Beachfill): Contract work consists of a base bid to place approximately 1,500,000 cubic yards of beachfill, along the Atlantic Ocean coastline of Absecon Island, Atlantic County, New Jersey. The project area encompasses the municipalities of Atlantic City, Ventnor, Margate, and Longport. The contract work may also consist of separate options to place additional amounts of beachfill per option, if awarded, in locations within and outside of the Base bid areas. The project work for the Base Bid and Options, if awarded, also may include, in addition to beachfill: the construction or repair of pedestrian, vehicle, and ADA compliant dune crossovers; planting dune grass; installing sand fencing; the repair or extension of existing storm water outfalls and drainage structures; and the relocation or removal of various existing structures or fill to accommodate the beachfill and dunes. The beachfill material for this contract must come from the authorized borrow areas, which are shown on the contract drawings, located within and adjacent to the Absecon Inlet in the Atlantic Ocean, and a separate designated area located approximately 2 – 3 miles offshore of Absecon Island in the Atlantic Ocean. Barnegat Inlet to Little Egg, Inlet (Long Beach Island), NJ (CSRM – Beachfill): Contract work consists of a base bid to place approximately 2,000,000 cubic yards of beachfill to repair the dune and berm system along the Atlantic Ocean coastline of Long Beach Island, Ocean County, New Jersey. The project area encompasses the municipalities of Long Beach Township, Borough of Harvey Cedars, Borough of Surf City, Borough of Ship Bottom, and Borough of Beach Haven. The contract work may also consist of separate options to place additional amounts of beachfill per option, if awarded, in locations within and outside of the Base bid areas. The project work for the Base Bid and Options, if awarded, also may include, in addition to beachfill: the construction or repair of pedestrian, vehicle, and ADA compatible dune crossovers; planting dune grass; providing sand fencing; and the relocation or removal of various existing structures to accommodate the beachfill, dunes and other project features. The beachfill material for this contract must come from the authorized borrow areas located approximately 2-3 miles offshore of Long Beach Island in the Atlantic Ocean, and/or the Little Egg Inlet as designated on the contract drawings. The solicitation is expected to be available in FY2027. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C 158(f). Federal Acquisition Regulation (FAR) Policy: (a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 14063, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will (1) Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement and Clause 52.222-34 Project Labor Agreement. (i) Requested are responses to the following: 1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation. 2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible. 3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. 4) Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement. 5) Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement. 6) Identify any additional information you believe the Government should take into consideration regarding the use of a PLA on the referenced project. 7) Does your company intend to bid/propose on this project if a PLA requirement is included in the solicitation? Does your company intend to bid/propose on this project if a PLA requirement is not included in the solicitation? 8) What are the likely cost impacts, if any, to your bid/proposal price if a PLA requirement is included in the solicitation? Please provide as much detail as possible regarding any anticipated cost impacts (positive or negative) of the inclusion of a PLA requirement, including any information you can provide about the magnitude of the anticipated impact. (ii) The information gathered in this exercise should include the following information on projects completed in the last 2-5 years (or other timeframe, as appropriate): 1) Project Name and Location: 2) Detailed Project Description: 3) Initial Cost Estimate vs. Actual Final Cost: 4) Was the project completed on time? 5) Number of craft trades present on the project: 6) Was a PLA used? 7) Were there any challenges experienced during the project? Responses shall be submitted via email to Terri Adams at terri.m.adams@usace.army.mil and Ros Shoemaker at rosalind.m.shoemaker@usace.army.mil no later than 3:00 PM EDT on 02 November 2026. The email should be titled: New Jersey CSRM PLA Response This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this labor market survey will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this survey.
-Market Research11/02/2026
THIS IS A PROJECT LABOR AGREEMENT (PLA) NOTICE TO BE USED FOR MARKET ANALYSIS ONLY. NO AWARDS WILL BE MADE FROM THE RESPONSES TO THIS SYNOPSIS. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SYNOPSIS OR ANY FOLLOW UP INFORMATION REQUESTS. NO SOLICITATION WILL BE AVAILABLE AT THIS TIME; HOWEVER, RESPONSES WILL BE USED TO DETERMINE THE APPROPRIATE ACQUISITION STRATEGY FOR A FUTURE ACQUISITION. NO RESPONSES TO THIS PLA NOTICE WILL BE POSTED TO SAM.GOV. The purpose of this announcement is to gain knowledge of the use and benefits of Project Labor Agreements (PLAs), Liberty State Park Ecosystem Restoration Project located in Jersey City, NJ. The NAICS Code is 237990 (Other Heavy and Civil Engineering Construction). Any potential solicitation(s) that may proceed from this notice will be posted to sam.gov. All interested offerors will have the opportunity to respond to a solicitation announcement later if a solicitation is issued. BACKGROUND AND INFORMATION FOR CONSTRUCTION CONTRACT The New York District, U.S. Army Corps of Engineers (District) is preparing plans and specifications for construction of the Liberty State Park Ecosystem Restoration Project located in Jersey City, NJ. The goal of the project is to create a resilient coastal ecosystem within a highly urbanized setting that provides both ecological and social benefits. Primary project components include: Restoration of the Liberty State Park interior including approximately 46.2 acres of tidal wetland habitat, 25.0 acres of non-tidal wetland habitat, and 72.6 acres of native upland habitat. Enhancement of approximately 7.1 acres of existing non-tidal wetland (4.5 acres) and upland (2.6 acres) habitats by removing invasive flora and planting native species. Creation of park amenities to accommodate and provide public interaction with this habitat restoration project, such as trail networks, overlooks, bird blinds, viewing hills, and a restroom. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for this project. The magnitude of the Liberty State Park Ecosystem Restoration project is between $100,000,000 and $250,000,000. The duration of construction is anticipated to be approximately 1,686 calendar days after Notice to Proceed. Notice to Proceed is anticipated to occur approximately in October 2027. Responses to this source sought will be used by the Government to help determine whether the use of a PLA will achieve economy and efficiency in the completion of the subject project. All firms and labor unions should respond to this announcement if they are interested in performing the work for this project. PLA DEFINITION A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). FEDERAL ACQUISITION REGULATION (FAR) SUBPART 22.503 - POLICY Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use project labor agreements in large-scale construction projects to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project (see 22.502), agencies shall require use of project labor agreements for contractors and subcontractors engaged in construction on the project, unless an exception at 22.504(d) applies. An agency may require the use of a project labor agreement on projects where the total cost to the Federal Government is less than that for a large-scale construction project, if appropriate. An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and Be consistent with law. Agencies may consider the following factors in deciding whether the use of a project labor agreement is appropriate for a construction project where the total cost to the Federal Government is less than that for a large-scale construction project: The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. There is a shortage of skilled labor in the region in which the construction project will be sited. Completion of the project will require an extended period of time. Project labor agreements have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project. A project labor agreement will promote the agency's long term program interests, such as facilitating the training of a skilled workforce to meet the agency's future construction needs. Any other factors that the agency decides are appropriate. For indefinite-delivery indefinite-quantity (IDIQ) contracts the use of a project labor agreement may be required on an order-by-order basis rather than for the entire contract. For an order at or above $35 million an agency shall require the use of a project labor agreement unless an exception applies. See 22.504(d)(3) and 22.505(b)(3). PLA COMMENT SOLICITATION In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions: Have comparable projects been undertaken by Federal, State, municipal, or private entities in the geographic area of this project? Do you have knowledge that a PLA has been used in the local area on similar projects? If so, please provide supporting documentation. For each project, please indicate if a PLA was used, the initial and final cost if available, number of trades on the project, if the project was completed on time, and if there were any challenges such as labor shortages, labor related delays, safety issues, etc. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? This project will require construction contractors and/or subcontractors employing workers in multiple crafts or trades. Do you foresee any work on this project that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade? Are there concerns by prime contractors on the availability of skilled construction labor? Are there large-scale construction projects in the area (over $25M, within 50 miles of Jersey City, NJ) which could impact availability of skilled labor for this project? What is the anticipated volatility in the labor market for the trades required for the execution of the project? Are existing apprentice programs providing enough skilled workers for future requirements? If so, please elaborate and provide supporting documentation where possible. Are you aware of time sensitive issues/scheduling requirements that would impact the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. Is the proposed schedule/completion time one which would benefit from a PLA – if so, how? Will a PLA impact the completion time? How would a PLA benefit a project which contains a unique and compelling mission-critical schedule? Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in federal procurement. Are there any other economies or efficiencies derived by the Federal Government, if using a PLA? Identify specific reasons why you don’t believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. Are there any concerns regarding labor-management stability related to this project? Will the use of a PLA produce labor-management stability on this project? Have labor disputes or other labor issues contributed to project delays in the local area? Are you aware of examples of labor-management conflicts in the area which could impact the efficiency of this project, which a PLA could positively impact/resolve? What market share does union labor in construction trades have in the geographic area? Which existing Collective Bargaining Agreements will expire during construction of this project? Will use of a PLA be conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters on this project? Are there instances where these standards have not been met on Federal contracts in the local area? Were PLAs used for those specific contracts? What is the estimated relative cost impact of using a PLA? Will a PLA impact the cost of submitting an offer? Will the use of PLAs impact the ability of potential offerors and subcontractors to meet small-business utilization goals? Should a PLA be executed on the above referenced project? What benefits do you believe a PLA could achieve? What other factors should the Corps consider? Please identify any additional information you believe should be considered on the use of a PLA on the referenced project. Please identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. Please note that this notice is not a commitment on the part of the Government to award a contract because of this notice or to pay for any information received. This synopsis neither constitutes a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. Responders should not construe this PLA Notice as a commitment for any purpose. The Government does not intend to rank submittals or provide any reply to interested firms. Please submit written comments by email to Mr. Nicholas Emanuel, Contracting Officer at Nicholas.P.Emanuel@usace.army.mil and Mrs. Jordan Moran, Contract Specialist, at Jordan.K.Moran@usace.army.mil. Survey Questionnaires will not be accepted after 4:00 pm on the response date shown in the advertisement on sam.gov. If the original response date falls on a Saturday, Sunday, or a Federal Holiday, the response date will be moved to the next business day.
-Special Notice10/30/2026
THIS IS A SOURCES SOUGHT ANNOUNCEMENT TO BE USED FOR MARKET ANALYSIS ONLY. NO AWARDS WILL BE MADE FROM THE RESPONSES TO THIS SYNOPSIS. NO SOLICITATION WILL BE AVAILABLE AT THIS TIME. HOWEVER, RESPONSES WILL BE USED TO DETERMINE THE APPROPRIATE ACQUISITION STRATEGY FOR A FUTURE ACQUISITION. The purpose of this announcement is to gain knowledge of potential business sources; with specific interest in small business, certified 8(a) serviced by SBA districts, certified HUB Zone, and Service-Disabled Veteran-Owned Small Business (SDVOSB), for work on a wetland restoration and park amenities construction contract. The NAICS Code is 237990 (size standard $45,000,000 average annual receipts for preceding five fiscal years). No awards will be made from the responses to this synopsis. No solicitation will be available at this time. Responses will be used to determine appropriate acquisition decisions for a future procurement. A. BACKGROUND AND INFORMATION FOR CONSTRUCTION CONTRACT The New York District, U.S. Army Corps of Engineers (District) is preparing plans and specifications for primarily ecosystem restoration at Liberty State Park, Jersey City, New Jersey. 1. The goal of the project is to create a resilient coastal ecosystem within a highly urbanized setting that provides both ecological and social benefits. Primary project components include: Restoration of the Liberty State Park interior including approximately 46.2 acres of tidal wetland habitat, 25.0 acres of non-tidal wetland habitat, and 72.6 acres of native upland habitat. Enhancement of approximately 7.1 acres of existing non-tidal wetland (4.5 acres) and upland (2.6 acres) habitats by removing invasive flora and planting native species. Creation of park amenities to accommodate and provide public interaction with this habitat restoration project, such as trail networks, overlooks, bird blinds, viewing hills, and a restroom. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for this project. 2. The magnitude of the Liberty State Park Ecosystem Restoration project is between $100,000,000 and $250,000,000. The duration of construction is anticipated to be approximately 1,686 calendar days after Notice to Proceed. Notice to Proceed is anticipated to occur approximately in October 2027. B. OPERATIONAL CONSTRAINTS The Contractor will conform to all local, state, and federal laws while carrying out the construction process for this project. This includes paying all fees and obtaining all permits required for the work. The Contractor shall prepare and submit a site-specific safety and health plan to the Government for approval prior to mobilization. C. SURVEY OF THE CONSTRUCTION CONTRACTOR INDUSTRY The following is a confidential survey questionnaire designed to apprise the US Army Corps of Engineers, NY District, of any prospective construction contractors’ project execution capabilities. Please provide your response to the following questions. At the end of this survey, you will be asked to provide any comments. General The proposed project is for the Liberty State Park Ecosystem Restoration project: Description of project: ecosystem restoration and park amenities. The proposed project is for construction. The North American Industry Classification System (NAICS) code is 237990. The Small Business Size standard is $45,000,000. The following information is required from interested sources: Name of firm with address, phone, and fax number, point of contact and email address. Identification and verification of the company as a Small Business Administration (SBA) certified HUBZone Small business firm, or a Service-Disabled Veteran Owned Small Business (SDVOSB) firm, or an SBA certified 8(a) firm with an SBA approved office for performing a competitive acquisition in the State of New York, or a Small Business firm under the size standard assigned to the procurement. A CAGE Code and UEI (Unique Entity ID) Number for the firm. Statement of Interest: Would you be willing to bid on the project described above? Please provide a brief description. If the answer is no, please explain why not. If you were to bid, would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s), or as a joint venture? Is there a dollar limit on the size contract that you would bid? What are the largest construction contracts (in dollar amounts) on which you were the prime contractor? The scope of this construction contract involves Munitions and Explosives of Concern (MEC). What is your experience with this type of work, either performing as the prime or overseeing a qualified subcontractor? The scope of this construction contract involves removal of Resource Conservation and Recovery Act (RCRA) hazardous waste. What is your experience with this type of work, either performing as the prime or overseeing a qualified subcontractor? Qualification Criteria: Responses to this Source Sought shall provide information that indicates the contractor has the experience to perform the work as specified above. Firms should respond to this notice by providing at least three relevant projects that the firm performed as a Prime Contractor. No more than five relevant projects can be submitted as Past Experience. Firms shall provide the dollar value of past relevant projects that the firm performed. What is your bonding capacity per contract? What is your total bonding capacity. The interested contractor should list the percentage and type of work that they will self-perform. Interested responders should refer to the following FAR Clauses to see the Limitations on Subcontracting that pertains to specific Set-asides. FAR 52.219-14 pertains to Small Business and 8(a) Set-asides. If the acquisition is set-aside for all Small Businesses or the 8(a) Program, the concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees. FAR 52.219-3 pertains to HUBZone Set-asides. If the acquisition is set-aside for HUBZone Small Businesses, at least 15 percent of the cost of contract performance to be incurred for personnel will be spent on the HUBZone prime contractor’s employees; and at least 50 percent of the cost of the contract performance to be incurred for personnel will be spent on the HUBZone Prime Contractor’s employees or on a combination of the HUBZone Prime Contractor’s employees and employees of HUBZone Small Business concern Subcontractors; and no more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone Small business concerns. FAR 52.219-27 pertains to Service-Disabled Veteran Owned Small Business (SDVOSB) set-asides. If the acquisition is set-aside for SDVOSB, at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern’s employees or the employees of other Service-Disabled Veteran Owned Small Business concerns. A joint venture may be considered a Service-Disabled Veteran Owned Small Business concern if at least one member of the joint venture is a Service-Disabled Veteran-Owned Small Business concern, and makes the following representations: That it is a Service-Disabled Veteran Owned Small Business concern, and that it is a Small Business concern under the North American Industry Classification Systems (NAICS) code assigned to the procurement; and each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement; and the joint venture meets the requirements of paragraph 7 of the explanation of Affiliates in 19.101 of the Federal Acquisition Regulation. The joint venture meets the requirements of 13 CFR 125.15(b) D. Contractor’s Comments or Recommendations Please provide comments or recommendations, if any. Please note that this notice is not a commitment on the part of the Government to award a contract as a result of this notice or to pay for any information received. This synopsis neither constitutes a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. The Government should not construe this Sources Sought Synopsis as a commitment for any purpose. The Government does not intend to rank submittals or provide any reply to interested firms. Submit Survey Questionnaires to: Attn: Nicholas Emanuel and Jordan Moran, CENAN‑CT, US Army Corps of Engineers, NY District, 26 Federal Plaza, New York, NY, 10278 Email: Nicholas.P.Emanuel@usace.army.mil and Jordan.K.Moran@usace.army.mil Survey Questionnaires will not be accepted after 4:00 pm on the original response date shown in the advertisement in the System for Award Management (SAM.gov). If the original response date falls on a Saturday, Sunday, or a Federal Holiday, the response date will be moved to the next business day. Firms responding to this source sought announcement, who fail to provide ALL the required information requested, will not be used to assist the Government in the acquisition decision, which is the intent of this sources sought announcement.
-Market Research10/30/2026
Title: SIOP MMDD MACC. The Naval Facilities Engineering Systems Command (NAVFAC) has a requirement to provide predominantly construction services (design build (DB) and design-bid-build (DBB)) for heavy and civil engineering waterfront facilities as well as commercial and institutional facilities primarily in support of the Shipyard Infrastructure Optimization Program (SIOP) Multi-Mission Dry Dock (MMDD) at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF), located at Naval Base Kitsap (NBK) Bremerton, Washington and other areas under the cognizance of NAVFAC Pacific. This solicitation will result in the award of Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Construction Contracts (MACC). The period of performance will be a base period of 5-years and one (1) 5-year option period for a maximum possible duration of 10-years; or an aggregate maximum estimated value of $15,000,000,000 for all task orders, whichever occurs first. The typical size of major construction task orders will range from $2,000,000,000 to $6,000,000,000; however, smaller task orders may be issued to support smaller efforts such as Early Contractor Involvement (ECI) and/or Alternative Technical Concepts (ATC). Task orders may be above this limit; however, contractors are not obligated to accept such task orders under the general terms of the contract. Each MACC holder will receive a minimum guarantee in the amount of $1,000,000. This solicitation is unrestricted allowing for full and open competition. Large businesses are advised that an acceptable small business subcontracting plan is required. Primary North American Industrial Classification System (NAICS) code 237990 - Other Heavy and Civil Engineering Construction; Small Business Size Standard: $45M.Secondary NAICS code 236220 - Commercial and Institutional Building Construction; Small Business Size Standard: $45M. Amendment 0001- Issued 21 October 2026. Amendment 0002- Issued 28 October 2026. Amendment 0003- Issued 05 November 2026. Refer to the link to the PIEE Solicitation Module for all solicitation documents, attachments, amendments, and related details.
-Solicitation12/01/2026

Additional Details

Solicitation Number

N4008523R2526

Archive Date

Nov 1, 2023

Office Address

NORFOLK, VA, 23511-0395