Notice ID: 18dfc1cab27546c4b4c0f2675d20eb68Award NoticeAwarded

Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI

Awarded on September 22, 2026. The description is published on SAM.gov: Full description on SAM.gov.

Awarded tounder N4008526C0032 (source: SAM.gov award notice)• $271.2M

Overview

Posted
September 22, 2026
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFAC.NAVFAC ATLANTIC CMD.NAVFAC MID-ATLANTIC.NAVFACSYSCOM MID-ATLANTIC
Place of performance
Newport, Rhode Island
Last updated
Oct 31, 2026
First published
Last updated on SAM.gov
Award date
Sep 22, 2026
Award amount (SAM.gov award notice)
$271.2M

Identifiers

Solicitation number
N4008526C0032
Notice ID
18dfc1cab27546c4b4c0f2675d20eb68
Award number (PIID)
N4008526C0032

Description

No description in the SAM.gov data feed for this notice.

Full description on SAM.gov

Award Overview

Award Number

N4008526C0032

Award Amount (SAM.gov award notice)

$271.2M

Award Date

Sep 22, 2026

Awardee

Awardee UEI

FJ5FBM811LL3

Awardee CAGE Code

3BMG6

Awardee Address

East Elmhurst, NY 11370, UNITED STATES

Original Solicitation

Notice ID: 18dfc1cab27546c4b4c0f2675d20eb68

Posted Date: Sep 22, 2026

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (91)

  • Amendment 0009 USCG OPC.pdf

    615 KBAdded in Solicitation version 20Posted
    Download
  • USCG OPC Pier Amendment 0009 Drawings.pdf

    608 KBAdded in Solicitation version 20Posted
    Download
  • 2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf

    31 MBAdded in Solicitation version 20Posted
    Download
  • Amendment 0008 USCG OPC.pdf

    652 KBAdded in Solicitation version 16Posted
    Download
  • Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx

    60 KBAdded in Solicitation version 16Posted
    Download
  • USCG OPC Pier Amendment 0008 Drawings.pdf

    1.3 MBAdded in Solicitation version 16Posted
    Download
  • Amendment 0007 USCG OPC.pdf

    980 KBAdded in Solicitation version 16Posted
    Download
  • Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf

    29 MBAdded in Solicitation version 16Posted
    Download
  • USCG OPC Pier Amendment 007 Drawings.pdf

    45 MBAdded in Solicitation version 16Posted
    Download
  • Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx

    58 KBAdded in Solicitation version 16Posted
    Download
  • Amendment 0006 USCG OPC.pdf

    798 KBAdded in Solicitation version 13Posted
    Download
  • Attachment Z - Pier 1 - Amendment 006 Drawings.pdf

    1.1 MBAdded in Solicitation version 13Posted
    Download
  • Appendix A - Telecom Room Photos.pdf

    74 MBAdded in Solicitation version 13Posted
    Download
  • Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx

    52 KBAdded in Solicitation version 13Posted
    Download
  • Amendment 0005 USCG OPC.pdf

    914 KBAdded in Solicitation version 11Posted
    Download
  • Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx

    53 KBAdded in Solicitation version 11Posted
    Download
  • Attachment W - Pier 1 - Amendment 005 Drawings.pdf

    16 MBAdded in Solicitation version 11Posted
    Download
  • Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf

    2.5 MBAdded in Solicitation version 11Posted
    Download
  • Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf

    661 KBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf

    40 MBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf

    27 MBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf

    11 MBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf

    9.4 MBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf

    1.8 MBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf

    1.0 MBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf

    978 KBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf

    656 KBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf

    656 KBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf

    512 KBAdded in Solicitation version 11Posted
    Download
  • Bulkhead Pile Plan.pdf

    504 KBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf

    512 KBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf

    421 KBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf

    417 KBAdded in Solicitation version 11Posted
    Download
  • NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf

    32 MBAdded in Solicitation version 11Posted
    Download
  • SUB-0284 PDA49B_A.pdf

    2.5 MBAdded in Solicitation version 11Posted
    Download
  • SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf

    2.4 MBAdded in Solicitation version 11Posted
    Download
  • 24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf

    62 MBAdded in Solicitation version 11Posted
    Download
  • 24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf

    2.1 MBAdded in Solicitation version 11Posted
    Download
  • 24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf

    1.7 MBAdded in Solicitation version 11Posted
    Download
  • Pier Pile Plan.pdf

    665 KBAdded in Solicitation version 11Posted
    Download
  • SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf

    4.6 MBAdded in Solicitation version 11Posted
    Download
  • SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf

    3.0 MBAdded in Solicitation version 11Posted
    Download
  • Trestle Summary.pdf

    6.1 MBAdded in Solicitation version 11Posted
    Download
  • SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf

    1.9 MBAdded in Solicitation version 11Posted
    Download
  • Amendment 0004 USCG OPC.pdf

    871 KBAdded in Solicitation version 9Posted
    Download
  • Updated Attachment K - WD RI20260001 05-18-2026.pdf

    5.5 MBAdded in Solicitation version 9Posted
    Download
  • Attachment U - Appendix A - Pier 1 Extension 1968.pdf

    8.0 MBAdded in Solicitation version 9Posted
    Download
  • Attachment V - Pier 1 - Amendment 004 Drawings.pdf

    6.0 MBAdded in Solicitation version 9Posted
    Download
  • Amendment 0003 USCG OPC.pdf

    808 KBAdded in Solicitation version 7Posted
    Download
  • Attachment C - Construction Experience Project Data Sheet.docx

    13 KBAdded in Solicitation version 7Posted
    Download
  • Attachment D - Past Performance Questionnaire.docx

    25 KBAdded in Solicitation version 7Posted
    Download
  • Attachment E - Historical Small Business Utilization.docx

    44 KBAdded in Solicitation version 7Posted
    Download
  • Updated Attachment F - SB Participation Commitment Document.docx

    43 KBAdded in Solicitation version 7Posted
    Download
  • Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx

    53 KBAdded in Solicitation version 7Posted
    Download
  • Attachment P - Spc 100 Final Specs Appendix F - Soil GW Sed Sampling Reports.pdf

    53 MBAdded in Solicitation version 7Posted
    Download
  • Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf

    25 MBAdded in Solicitation version 7Posted
    Download
  • Attachment R - 26 08 00 - Electrical Shore Ties CSTO (Rev B) - Section 2.4.6 Testing.pdf

    1.4 MBAdded in Solicitation version 7Posted
    Download
  • Attachment S - Pier 1 - Amendment 003 Drawings.pdf

    18 MBAdded in Solicitation version 7Posted
    Download
  • Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf

    3.7 MBAdded in Solicitation version 7Posted
    Download
  • CJA ML-23-80 - Redacted.pdf

    1.2 MBAdded in Solicitation version 7Posted
    Download
  • JA ML-26-40 USCG Kaeser Compressed Air System - Redacted.pdf

    171 KBAdded in Solicitation version 7Posted
    Download
  • JA ML-26-41 USCG Comm Shore Tie Receptacle - Redacted.pdf

    183 KBAdded in Solicitation version 7Posted
    Download
  • JA ML-26-42 USCG Line Insulation Monitor - Redacted.pdf

    188 KBAdded in Solicitation version 7Posted
    Download
  • JA ML-26-43 USCG Sanitary Pumps - Redacted.pdf

    190 KBAdded in Solicitation version 7Posted
    Download
  • Amendment 0002 USCG OPC.pdf

    275 KBAdded in Solicitation version 6Posted
    Download
  • Updated Attachment G - Individual SB Subcontracting Plan.docx

    199 KBAdded in Solicitation version 6Posted
    Download
  • Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf

    278 KBAdded in Solicitation version 6Posted
    Download
  • Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf

    273 KBAdded in Solicitation version 6Posted
    Download
  • Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx

    161 KBAdded in Solicitation version 6Posted
    Download
  • Attachment O - OPC Pier 1 - Amendment 002 Revised Drawings.pdf

    25 MBAdded in Solicitation version 6Posted
    Download
  • Amendment 0001 USCG OPC.pdf

    422 KBAdded in Solicitation version 4Posted
    Download
  • Updated Attachment F - SB Participation Commitment Document.pdf

    125 KBAdded in Solicitation version 4Posted
    Download
  • Attachment L - Site Visit Log.pdf

    166 KBAdded in Solicitation version 4Posted
    Download
  • Solicitation - N4008526R0001.pdf

    1.0 MBAdded in Solicitation version 2Posted
    Download
  • Attachment A - Pre Proposal Inquiry Log.xlsx

    11 KBAdded in Solicitation version 2Posted
    Download
  • Attachment B - PIEE Vendor Access Instructions.pdf

    510 KBAdded in Solicitation version 2Posted
    Download
  • Attachment C - Construction Experience Project Data Sheet.pdf

    307 KBAdded in Solicitation version 2Posted
    Download
  • Attachment D - Past Performance Questionnaire.pdf

    502 KBAdded in Solicitation version 2Posted
    Download
  • Attachment E - Historical Small Business Utilization.pdf

    350 KBAdded in Solicitation version 2Posted
    Download
  • Attachment F - SB Participation Commitment Document.pdf

    335 KBAdded in Solicitation version 2Posted
    Download
  • Attachment G - Individual SB Subcontrating Plan.pdf

    476 KBAdded in Solicitation version 2Posted
    Download
  • Attachment H - UCCG OPC Pier Price Proposal Form.pdf

    244 KBAdded in Solicitation version 2Posted
    Download
  • Attachment I - SECNAV FORM 5512.pdf

    1.0 MBAdded in Solicitation version 2Posted
    Download
  • Attachment J Site Visit Meeting Location.pdf

    917 KBAdded in Solicitation version 2Posted
    Download
  • Attachment K - WD RI20260001 01-30-2026.pdf

    104 KBAdded in Solicitation version 2Posted
    Download
  • Specifications USCG OPC Newport.pdf

    154 MBAdded in Solicitation version 2Posted
    Download
  • 1826479dwg01of05_GEN-CIV.pdf

    83 MBAdded in Solicitation version 2Posted
    Download
  • 1826479dwg02of05_STRUC1.pdf

    29 MBAdded in Solicitation version 2Posted
    Download
  • 1826479dwg03of05_STRUC2.pdf

    15 MBAdded in Solicitation version 2Posted
    Download
  • 1826479dwg04of05_MECH.pdf

    12 MBAdded in Solicitation version 2Posted
    Download
  • 1826479dwg05of05_ELEC.pdf

    15 MBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 3
    Version 3SolicitationArchived

    Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI

    Notice 0ad21e0a5df84a40b3eb221eb77ea3e7 on SAM.gov

  2. 2
    Version 2Award NoticeCurrent

    Type changed from Solicitation to Award Notice

    Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI

    Notice 18dfc1cab27546c4b4c0f2675d20eb68 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
PRE-SOLICITATION SYNOPSIS NOTICE ONLY: THE SOLICITATION WILL BE AVAILABLE ON OR ABOUT NOVEMBER 5, 2026, AT HTTPS://SAM.GOV/. THE SOLICITATION NUMBER IS N6945027R0006, FOR THE DESIGN-BID-BUILD (DBB) CONSTRUCTION PROJECT, P110 CAPE CANAVERAL RAILHEAD AND TRANSFER FACILITIES, KENNEDY SPACE CENTER, FLORIDA PROJECT TITLE: DESIGN-BID-BUILD CONSTRUCTION PROJECT, FY27, P110 CAPE CANAVERAL RAILHEAD AND TRANSFER FACILITIES, KENNEDY SPACE CENTER, FLORIDA PSC: Y1LB - Construction of Highways, Roads, Streets, Bridges, and Railways NAICS: 237990 - Other Heavy and Civil Engineering Construction THIS IS NOT A REQUEST FOR PROPOSALS OR AN INVITATION FOR BID. NO CONTRACT WILL BE AWARDED FROM THIS ANNOUNCEMENT. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. No telephone calls will be accepted requesting a bid package or solicitation. There is no bid package or solicitation currently available. In order to protect the procurement integrity of any future procurement that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be made. Project Description: The project will include but is not limited to the following: Constructs railroad trackage to connect and facilitate the transfer from commercial rail to the on-base processing facility at Cape Canaveral. Constructs a low-rise open air standing seam-metal roofed canopy on a reinforced shallow foundation with wide-flange beams and columns and continuous footings for a Submarine Launched Ballistic Missile Processing Facility (Motor Transfer Facility). Functions include receiving and shipping missile motors, components and Active Inert Missiles (AIMS) which require superflat floors for air pallet operations. The roof structure will include sloped, uninsulated metal roof panels on steel joists. The estimated Period of Performance is 527 calendar days. The best value continuum source selection process to be used for this acquisition is the tradeoff approach, as described in FAR 15.103-1. The best value tradeoff process is appropriate and permits evaluation of proposals based on price competition, technical merit, confidence assessment and other factors; permits impartial and comprehensive evaluation of offeror proposals; permits discussions if necessary; and ensures selection of the source whose performance provides the best value to the Government. A sources sought notice was posted to sam.gov on September 10, 2026 requesting small business industry interested and capability statement. Based on responses from the notice it was determined that the requirement should be issued as full and open. The solicitation will be a negotiated DBB acquisition. Proposals will be solicited in a two part submission for a single solicitation. The solicitation will utilize source selection procedures, which require offerors to submit a technical proposal, past performance and experience information, and a price proposal for evaluation by the Government. Award will be made to the offeror whose total price and technical proposal offer the best value to the Government. Competition Requirements: Unrestricted basis, under full and open competition. Procurement Method: FAR Part 15, Contracting by Negotiation. Type of Contract: Firm-Fixed Price The NAICS code for this construction solicitation is 237990 with a size standard of $45,000,000. Project Magnitude is between $25,000,000 and $100,000,000. This is a new procurement. It does not replace an existing contract. No prior contract information exists. Large business concerns will be required to submit a subcontracting plan prior to award of the contract. A Site Visit will be held for those offerors who choose to participate (exact date and time will be specified in the solicitation). Proposals will be due no earlier than 30 days after the solicitation is released (exact date and time will be specified in the solicitation). This will be an electronic solicitation, which can be downloaded from Sam.gov Opportunities at https://sam.gov/. The solicitation will be available at this site no earlier than 15 days after this pre-solicitation notice is posted. Offerors are responsible for checking the Sam.gov website for the solicitation and any subsequent amendments that may be issued. NO CONTRACT AWARD WILL BE MADE TO ANY CONTRACTOR THAT IS NOT REGISTERED OR IN THE PROCESS OF REGISTERING WITH THE SYSTEM FOR AWARD MANAGEMENT (SAM). PLEASE VISIT THE SAM WEBSITE AT https://www.sam.gov FOR INSTRUCTIONS ON HOW TO REGISTER.
-Pre-Solicitation11/04/2026
Contractor shall provide all labor, materials, equipment, transportation, supervision and disposal required for the structural repair, recapitalization, and/or demolish Aids to Navigation (ATON) structures at various southern sites in the CG Northeast District. The project consists of a Base Bid at the following sites in New York, Connecticut and Rhode Island: 1. New Haven Middle Breakwater West End Light (LLNR 24070): Replace existing tower in kind. 2. Stonington Outer Breakwater Light 4 (LLNR 20170): Replace existing concrete foundation, replace existing tower with standard 5x5 tower. 3. Stonington Breakwater Light 5 (LLNR 20175): Replace existing concrete foundation, repoint existing granite block foundation, replace existing tower in kind. 4. Norwalk Channel Light 10 (LLNR 24990): Replace existing foundation and tower in kind. 5. Port Jefferson West Breakwater Light 2A (LLNR 26145): Replace existing foundation and tower in kind. 6. Connecticut River Light 135 (LLNR 23300): Demolish ATON structure to below-grade elevation & reseed. 7. Point Judith Harbor of Refuge West Entrance Light 3 (LLNR 19505):Demolish existing structure & rebuild as standard 5x5 tower on concrete foundation offset from jetty erosion. An option item for an additional Aid to Navigation (ATON) structure repair in Massachusetts is included as follows: 1. Chatham Light (LLNR 525): Replace windows in kind & clean/recoat exterior/interior. The estimated value of the procurement is between $1,000,000 and $5,000,000. A 20% bid guarantee is required. Performance and Payment bonds will be required. The applicable North American Industry Classification System (NAICS) code is 237990 - Other Heavy and Civil Engineering Construction with a small business size standard of $45.0 million. Solicitation packages will be available on or about 4 November 2026. The tentative date set for receipt of bids is 8 December 2026 at 2:00 p.m. The base performance period is estimated to be 300 calendar days from issuance of Notice to Proceed and the option performance period is estimated to be 60 calendar days to be exercised at the Contracting Officers discretion. This acquisition is issued pursuant to FAR Part 14 Sealed Bidding and is 100% Set-Aside for Small Business concerns. All relevant solicitation documents, including specifications and drawings may be accessed for download beginning on the date of issue of the IFB at the following site: https://www.sam.gov. Vendors MUST be registered in the System for Award Management database through https://www.sam.gov in order to receive a federal government contract. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.
-Pre-Solicitation12/08/2026
Posted ABSTRACT OF OFFERS IFB 70Z0G126BSLISSW02. AMENDMENT 0003 Posted October 16, 2026 to update Item 0002-Optional Item 1 in the IFB, by deleting the first paragraph to clarify that we're asking for the additional disposal costs for coated/treated piling. Please replace page 5 of the IFB with the updated one provided in this amendment. AMENDMENT 0002 Posted October 13, 2026 (Revised Bid Opening Date 10/22/2026 2pm EST) AMENDMENT 0001 Posted October 08, 2026 Eagle Pier New Dredging (FY26) at New London’s City Pier, CT (NEW LONDON COUNTY), PSN #24014900. Contractor shall provide all personnel, equipment, materials, and all other items and services required to perform dredging of a new area immediately south of CGC EAGLE’s berth at New London’s City Pier. The intent is to deepen the area to allow tugboats to assist the cutter for mooring/unmooring at all tide levels. Requirements of the design specify dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW) +2.0’ over dredging allowance. This equates to approximately 3,700 cubic yards (CY) of dredge spoils to remove to an upland disposal site. Offshore disposal is not permitted due to environmental sample analysis of the dredge area. There is an environmental time of year restriction in Connecticut that only permits dredging activities between October 1st and March 1st. SPECIAL NOTES: The contractor shall conduct dredging operations so that navigation through the channel is possible at all times. The scope of work also includes removals of approximately 50 piles that remain below the waterline. Any piles that cannot be fully removed are to be cut at -21.0’ MLLW. Dredge quantity of 3,700 CY. This estimate is based on an average of the past annual dredging and surveys. The Contractor shall provide a cost for dredging per cubic yard. That per cubic yard cost will be used for any necessary contract cost adjustment resulting from dredging more or less than the estimated 3,700 cubic yards, within the limits of dredge. Contractor will be compensated for actual quantity of dredge material removed and disposed, within the limits of dredge, as shown on the plan sheets. Dredge disposal site location is to be determined by conditions of treated/non-treated piles for Base bid item and Option Bid item. The estimated value of the procurement is between $1,000,000 and $5,000,000. A 20% bid guarantee is required. Performance and Payment bonds will be required. The performance period is estimated to be 300 calendar days from issuance of Notice to Proceed. This acquisition is issued pursuant to FAR Part 14 Sealed Bidding and is 100% Set-Aside for Small Business concerns. All relevant solicitation documents, including specifications and drawings may be accessed for download beginning on the date of issue of the IFB at the following site: https://www.sam.gov. Vendors MUST be registered in the System for Award Management database through https://www.sam.gov in order to receive a federal government contract. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.
-Solicitation10/22/2026
Solicitation packages will be available on or about 08/11/2026. The Contractor shall provide all labor, materials, equipment, supervision, and disposal required for USCG Cutter Eagle Berth - New Dredging at New London’s City Pier. The project intent is to deepen the berthing area to allow tug boats to assist the cutter for mooring/unmooring at all tide levels, dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW). This invitation for bid is issued pursuant to FAR Part 14 and is 100% set-aside for Small Business concerns in accordance with FAR Part 19.5. The applicable North American Industry Classification System (NAICS) code is 237990 Other Heavy and Civil Engineering Construction with a small business size standard of $37.0 million. The magnitude of construction range of this project is between $1,000,000 and $5,000,000. Bid, payment, and performance bonds will be required. The overall performance period for this project is 300 Calendar Days from issuance of a Notice to Proceed (NTP). The bid opening date is scheduled for 09/10/2026 at 2:00 pm. All relevant solicitation documents, including specifications and drawings may be accessed for download beginning on the date of issue at the following site: https://sam.gov/content/opportunities. To receive immediate notification of all changes posted electronically, vendors should click on [Register to Receive Notification]. All vendors interested in teaming or subcontracting for this solicitation, should click on [Register as Interested Vendor]. To view a list of interested vendors, interested parties should click on [View List of Interested Vendors]. A list of interested vendors is only available by registering electronically for this solicitation. Vendors MUST be registered in the System for Award Management database to receive a federal government contract.
-Pre-Solicitation09/10/2026
Title: SIOP MMDD MACC. The Naval Facilities Engineering Systems Command (NAVFAC) has a requirement to provide predominantly construction services (design build (DB) and design-bid-build (DBB)) for heavy and civil engineering waterfront facilities as well as commercial and institutional facilities primarily in support of the Shipyard Infrastructure Optimization Program (SIOP) Multi-Mission Dry Dock (MMDD) at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF), located at Naval Base Kitsap (NBK) Bremerton, Washington and other areas under the cognizance of NAVFAC Pacific. This solicitation will result in the award of Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Construction Contracts (MACC). The period of performance will be a base period of 5-years and one (1) 5-year option period for a maximum possible duration of 10-years; or an aggregate maximum estimated value of $15,000,000,000 for all task orders, whichever occurs first. The typical size of major construction task orders will range from $2,000,000,000 to $6,000,000,000; however, smaller task orders may be issued to support smaller efforts such as Early Contractor Involvement (ECI) and/or Alternative Technical Concepts (ATC). Task orders may be above this limit; however, contractors are not obligated to accept such task orders under the general terms of the contract. Each MACC holder will receive a minimum guarantee in the amount of $1,000,000. This solicitation is unrestricted allowing for full and open competition. Large businesses are advised that an acceptable small business subcontracting plan is required. Primary North American Industrial Classification System (NAICS) code 237990 - Other Heavy and Civil Engineering Construction; Small Business Size Standard: $45M.Secondary NAICS code 236220 - Commercial and Institutional Building Construction; Small Business Size Standard: $45M. Amendment 0001- Issued 21 October 2026. Amendment 0002- Issued 28 October 2026. Amendment 0003- Issued 05 November 2026. Refer to the link to the PIEE Solicitation Module for all solicitation documents, attachments, amendments, and related details.
-Solicitation12/01/2026

Additional Details

Solicitation Number

N4008526C0032

Archive Date

Oct 31, 2026

Office Address

NORFOLK, VA, 23511-0395