Notice ID: a493222016fb434ba77a2a8be0f51ab9Combined Synopsis/Solicitation
Removal, Installation, and Support of AIMS CMM
Archived on April 13, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 AM UTC−04:00
- Posted
- March 22, 2021
- Notice type
- Combined Synopsis/Solicitation
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NORFOLK NAVAL SHIPYARD GF
- Place of performance
- Portsmouth, VA, 23709
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- N4215821QS032
- Notice ID
- a493222016fb434ba77a2a8be0f51ab9
Description
The contractor shall be responsible for the rigging, installation and Support Services to ensure the successful installation and implementation of the CMM system. Services shall consist of the following: Installation: Installation services shall consist of the following: Provide rigging support to remove existing machine and unload new machine. Remove existing CMM from location (existing machine is an LK DCC CMM 40X40X32, S/N 20004) Set new machine in location Electrically connect machine and equipment to utilities provided by shipyard Provide service technicians to install and prepare the equipment Provide technicians to calibrate the installed system in accordance with ISO 17025 Manufacturer Technical Center Training: Provide two (2) eight (8) hour days of Basic machine operator training and two (2) eight (8) hour days of advanced machine operator training at contractor Technical Training Center. Training shall be provided for two students and shall consist of a minimum of the following: Normal operation Basic Software Programming Programming from CAD Editing and Reporting User Calibration and basic maintenance Onsite Familiarization Training: Provide four (4) eight (8) hour days of operational onsite training. Training shall be provided for three (3) operators and shall consist of the following: Normal operation Basic Software Programming Programming from CAD Editing and Reporting User Calibration Basic Machine Maintenance
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
N4215821QS032- Combined Synopsis
- Combined SynopsisCurrentMar 22, 2021
Removal, Installation, and Support of AIMS CMM
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
N4215821QS032
Archive Date
Apr 13, 2021
Office Address
PORTSMOUTH, VA, 23709-1001