Notice ID: b0a80f60db50463eb6aa803f04ba7da9Solicitation
YON-326 Maintenance Repair & Preservation
Archived on September 1, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- August 6, 2020
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 336611: Ship Building and Repairing
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- PUGET SOUND NAVAL SHIPYARD IMF
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- N4523A20R1082
- Notice ID
- b0a80f60db50463eb6aa803f04ba7da9
Description
6 August 2020 Response to bidder questions. Uploaded FOUO C04.0 RFC N4523A20R1082 (2) Response to bidders questions ______ 31 July 2020 Response to bidder questions. Uploaded additional references in response to bidder questions. ______ 30July 2020: Updated Attachment J-3 RFC point of contact. ______ Information for Potential Offerors: The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF), Bremerton, Washington intends to award a stand along Firm-Fixed Price (FFP) contract to accomplish maintain, repair and preservation of YON-326 Fuel Oil Barge. YON-326 has the following specifications. YON-326 Fuel Oil Barge Characteristics Built by: Sundial Marine and Construction & Repair, Inc. Length: 199 FT Draft: 3 Ft – 0 IN Width: 54 FY – 0 IN Full Displacement: 2848 L Tons Age: 12 YRS Light Load: 706 L Tons Hull Type: Steel The contractor’s facility must possess the capability of accommodating one (1) YON-326 Fuel Oil Barge with the dimensions as stated above. Coordinate with the Contracting Officer, via the Contracting Officer’s Representative (COR) to deliver the vessel from Manchester Fuel Depot to the Contractor’s facility. Dock, wash, and clean exterior surfaces of the vessel upon docking. Accomplish steel half pipe repairs.Replace zinc anodes on hull / Skegs. Accomplish Hull Preservation. Accomplish Hull VT / UT Inspections. Accomplish Skeg repairs. Accomplish Steel Ladder Repairs. Accomplish Cofferdam Modifications. Accomplish Storage Locker Hinge Modification. Accomplisk Tank/Void Repairs. Accomplish Watertight Hatch Door and Scuttle Repairs. Repair dogging Mechanisms. Accomplish main Deck Non Skid Repairs. Accomplish VT / UT of Main deck. Accomplish Superstructure Preservation. Accomplish Antena Support Modification. Acomplish cargo Pump Diesel Engine Repairs. Accomplish cargo Pump Shaft and Seal Repairs. Accomplish navigation Lighting repairs. Accomplish Cargo Deck Flood Light Repairs. Accomplish Tank Level Indicator repairs. Accomplish Tapped Cable Hanger Repairs. Accomplish Cargo Piping Preservation. Install New cargo Pump Pressure Gauge. Accomplish Cargo Reduction Valve repairs. Accomplish Cargo Header Isolation Valve Repairs. Accomplish Dock and Sea Trials. Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the COR. Calibration of TLI’s, shall be conducted at Manchester Fuel Depot (MFD) in Manchester, WA The period of Performance is scheduled to be 16 December 2020 to 18 March 2021 This is a 100% small business set-aside under the North American Industry Classification System (NAICS) 336611, size 1,250 employees. The Government anticipates to award Firm-Fixed Price, stand-alone contract in September 2020 to the responsible contractor on a lowest price, technically acceptable basis in accordance with, but not limited to, the Federal Acquisition Regulation (FAR) 15.101-2. Offerors can view and/or download the draft notional work specifications for review at https://beta.sam.gov/. All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts. Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
N4523A20R1082- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationJun 3, 2020
YON-326 Maintenance Repair & Preservation
- 4×SolicitationCurrentJul 15, 2020
YON-326 Maintenance Repair & Preservation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
N4523A20R1082
Archive Date
Sep 1, 2020
Office Address
BREMERTON, WA, 98314-5001