Notice ID: 81ff6c0e585c4ea6be61442227ae16d1Combined Synopsis/Solicitation
(4) three-ton bridge cranes for PSNS IMF Bremerton WA
Archived on September 30, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- September 12, 2023
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- PUGET SOUND NAVAL SHIPYARD IMF
- Place of performance
- Bremerton, 98314
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- N4523A23Q5739
- Notice ID
- 81ff6c0e585c4ea6be61442227ae16d1
Description
9/12/23: C09.0 N4523A23Q5739 Amendment 002 posted with revised SOW dated 12 September and questions and answers. See attachments. 9/1/23: C09.0 N4523A23Q5739 Amendment 001 posted with revised SOW dated 01 September and questions and answers. See attachments. Requesting (4) 3 ton cranes CLIN-0001 Documentation /Design - 25 September 2023 to 3/31/2024 CLIN-0002 Manufacturing and Shop Test 3 Ton 0002A Manufacturing – Delivery Date: 8/31/2024 0002B Assembly/Shop Test/Installation/Acceptance –Delivery Date: 12/31/2024 CLIN-0003 – Existing Crane Removal 9/25/2023 to 1/31/2025
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Michael Myers
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
N4523A23Q5739- Market Research
- Combined Synopsis
- 3×Combined SynopsisCurrentAug 31, 2023
(4) three-ton bridge cranes for PSNS IMF Bremerton WA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Scope of Work Project Overview: Provide and install Variable Frequency Drives (VFDs) for two bridge crane hoists (Yale Hoists), ensuring compliance with electrical classification requirements: Class 1, Div. 1, Group D and Class 2, Div. 1, Groups E, F, and G. Both hoists are located indoors and have a hook height of approximately 30 feet. Specific model and serial numbers are as follows: Model: FEW30-31TR10D6 (1 of 2) Serial: CK2334RM (1 of 2) Level of Service The contractor shall provide a complete turnkey solution for the project. This service level includes providing all necessary labor, materials, equipment, and project management required for the successful installation and commissioning of the VFDs on the two specified bridge cranes. 2 additional enclosures will be required to be mounted to the frame of the bridge crane. The required site visit will determine optimal location. The final deliverable must be a fully operational and integrated system that is compliant with all standards mentioned herein. The contractor is expected to manage all project phases, from the initial site assessment to final documentation and training, ensuring minimal disruption to ongoing operations. 1. Site Assessment: Conduct an initial site assessment to evaluate the existing crane setup and electrical infrastructure. Identify any structural modifications required for the safe and secure installation of the new VFDs, controls, and associated protective enclosures. The contractor will be responsible for executing all necessary and approved structural modifications as part of the turnkey installation. Verify the electrical classification requirements and ensure all necessary safety measures are in place. 2. Equipment Procurement: Procure VFDs suitable for the specified electrical classifications and crane specifications. Ensure all equipment is certified for use in hazardous locations. Include specific model and serial number (FEW30-31TR10D6, CK2334RM) for one of the hoists. 3. Installation: Install VFDs on each of the two bridge cranes, following manufacturer guidelines and safety protocols. Ensure proper wiring and connections are made to integrate the VFDs with the existing crane control systems. Install necessary protective enclosures and grounding to meet the specified electrical classifications. 4. Testing and Commissioning: Perform initial testing of the VFDs to ensure proper functionality and integration with the crane systems. Conduct load testing to verify the performance and safety of the VFDs under operational conditions. Make any necessary adjustments or calibrations to optimize performance. 5. Documentation: Provide detailed documentation of the installation process, including wiring diagrams, equipment specifications, and safety compliance records. Submit final reports and test results to the project stakeholders. 6. Training: Provide training to crane operators and maintenance personnel on the operation and maintenance of the new VFDs. Ensure all personnel are familiar with the safety protocols and emergency procedures related to the VFDs. 7. Warranty and Support: Provide a warranty for the installed VFDs and offer ongoing support for any issues or maintenance needs. 8. Project Timeline: The period of performance for this contract is six (6) months, beginning March 1, 2026. All work, including site assessment, procurement, installation, testing, commissioning, and training, must be completed within this timeframe. The offeror must provide a detailed project timeline with milestones for each phase of the project that fits within this required period of performance. 9. Safety Compliance: Ensure all work is performed in accordance with relevant safety standards and regulations, including NFPA 70 (National Electrical Code) and OSHA requirements. | 79% | Combined Synopsis | 01/05/2026 |
150 Metric Ton Mobile Boat Hoist for the Naval Surface Warfare Center, Carderock Division ? Combatant Craft Division (NSWCCD-CCD) Detachment Norfolk, Bldg. V-47, Naval Station Norfolk, Norfolk, Virginia 23511. | 73% | Solicitation | 07/31/2026 |
100MT MOBILE BOAT HOIST, NAVAL SPECIAL WARFARE GROUP 8, JOINT EXPEDITIONARY BASE LITTLE CREEKAmendment 0006 is issued for clarification purposes to: 1) revise Specification Section 2.4; and 2) revise Attachment A | 71% | Solicitation | 12/19/2025 |
70% | Solicitation | 11/23/2026 | |
Gantry Crane | 67% | Combined Synopsis | 05/12/2026 |
Additional Details
Solicitation Number
N4523A23Q5739
Archive Date
Sep 30, 2023
Office Address
BREMERTON, WA, 98314-5001