Berth 13 Structural Repairs, Portsmouth Naval Shipyard, Kittery ME .
Archived on March 21, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- February 26, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVFAC.NAVFAC ATLANTIC CMD.NAVFACSYSCOM ATLANTIC
- Place of performance
- Kittery, Maine, 03904
- PSC
- Z2ED: REPAIR OR ALTERATION OF SHIP CONSTRUCTION AND REPAIR FACILITIES
- Last updated
- Aug 21, 2026
Identifiers
- Solicitation number
- N6247026R0016
- Notice ID
- ee4eae25b1e940a789eaaf257d36326c
Description
READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY.
YOU WILL NEED TO REQUEST Attch J - Contract Docs_RM24-2895 Specs, DWGs & RPTs VIA EMAIL, AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW:
Bruce Davis: bruce.w.davis5.civ@us.navy.mil
This project provides structural repairs to Berth 13 to restore deck loading capacity and extend usablelife of structure, repair deteriorated deck sections,and repair piles, caps, beams, deck, and steel reac-tion frame connections to allow continued use ofthe berth. Berth 13 is an open wharf structure water-front facility constructed in the 1940’s consisting ofconcrete piles including previous jacket repairs,concrete wharf deck, and steel reaction frame withtimber decking along the outboard face of the wharfstructure. Total approximate construction area isapproximately 25,000 square feet (SF).
Berth 13 repair work will include both full (1,600 SF) and partial demolition (area to be determined) to various portions of the concrete wharf deck; outage coordination, removal and replacement of utilities in the way of concrete repairs; repairs to the reaction frame; repairs to the landside fascia beam; and repairs to crane rail beams, pile caps, pile jackets and anodes. All demolition and construction activities must prevent debris from entering the river below. Underside wharf deck, pile jacket and anode repairs require the capability to work from barges and other floating platforms; as well as meet strict safety protocols.
AMENDMENT 0001
1. Revise the Solicitation
2. Add/Update Clauses
3. Add Site Visit Information
4. Answer PPIs: Pre-Proposal Inquiry Log_B13-1
The following Attachments will be added:
Attch K - Site Walk Information_B13
Attch L - SECNAV 5512 1_REV MAY 2021_exp 2027
Attch M - DBIDS 5500b
Attch N - Pass Office Virtual Line Guidance
AMENDMENT 0002
1. Revise the Solicitation
2. Answer PPIs: Pre-Proposal Inquiry Log_B13-2
AMENDMENT 0003
1. Revise the Solicitation:
a. Section 00 21 00 - Instructions, INSTRUCTION TO OFFERORS: Paragraph "3.8 NON-PRICE FACTORS" Attachment Label corrections
b. Update "Factor 3, Small Business Utilization"
2. Answer PPIs: Pre-Proposal Inquiry Log_B13-3
3. Update Attch J - Contract Docs_RM24-2895 Specs, DWGs & RPTs
a. Reference Amendment 0003 - Attch J Summary of Changes w/ DWGS Rev1
b. Re-issue RM24-2895_Final Reference Drawings - Vol 2, w/o CUI designation as it does not apply.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 10 of 14 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Presolicitation | DEPT OF THE NAVY | Feb 26, 2026 | 131.25 KB | |||
| Solicitation | DEPT OF THE NAVY | Feb 26, 2026 | 34.56 KB | |||
| Solicitation | DEPT OF THE NAVY | Feb 26, 2026 | 921.17 KB | |||
| Solicitation | DEPT OF THE NAVY | Feb 26, 2026 | 16.85 KB | |||
| Solicitation | DEPT OF THE NAVY | Feb 26, 2026 | 189.03 KB | |||
| Solicitation | DEPT OF THE NAVY | Feb 26, 2026 | 52.25 KB | |||
| Solicitation | DEPT OF THE NAVY | Feb 26, 2026 | 17.14 KB | |||
| Solicitation | DEPT OF THE NAVY | Feb 26, 2026 | 318.59 KB | |||
| Solicitation | DEPT OF THE NAVY | Feb 26, 2026 | 63.62 KB | |||
| Solicitation | DEPT OF THE NAVY | Feb 26, 2026 | 178.71 KB |
Showing 1 to 10 of 14 results
Lifecycle
N6247026R0016- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJan 6, 2026
Berth 13 Structural Repairs, Portsmouth Naval Shipyard, Kittery ME .
- 4×SolicitationCurrentJan 24, 2026
Berth 13 Structural Repairs, Portsmouth Naval Shipyard, Kittery ME .
Similar Opportunities
Additional Details
Solicitation Number
N6247026R0016
Archive Date
Mar 21, 2026
Office Address
NORFOLK, VA, 23508-1278