N62473-21-D-1410 IDIQ MACC SB Set-Aside for New Construction, Repair, and Renovation of Waterfront Facilities, NAVFAC SW, Justification and Approval (J&A) to extend the contract term. FAR 6.302-1, only one or a limited number of responsible sources.
Awarded on January 13, 2026. Full description on SAM.gov.
Overview
- Posted
- January 20, 2026
- Notice type
- Justification
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVFAC.NAVFAC PACIFIC CMD.NAVFAC SOUTHWEST SW.NAVFACSYSCOM SOUTHWEST
- Place of performance
- California
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jan 13, 2026
- Award amount (SAM.gov award notice)
- Not specified
Identifiers
- Solicitation number
- N62473-21-D-1410-P00006
- Notice ID
- 5627f79fb4cd4c9f80d7e6e024ea43b1
Description
N62473-21-D-1410, IDIQ MACC SB Set-Aside for New Construction, Repair, and Renovation of Waterfront Facilities, NAVFAC SW, Justification and Approval (J&A) to extend the contract term. FAR 6.302-1, only one or a limited number of responsible sources.
Award Overview
Award Number
N62473-21-D-1410
Award Amount (SAM.gov award notice)
Not specified
Award Date
Jan 13, 2026
Awardee
Not specified
Original Solicitation
Notice ID: 5627f79fb4cd4c9f80d7e6e024ea43b1
Posted Date: Jan 20, 2026
Original Response Deadline: Not specified
Task Orders Under This IDV
Top 10 by total obligated
- $1.9MSigned Sep 30, 2024
- $1.9MSigned Nov 22, 2022
- $1.5MSigned Apr 26, 2024
- $1.5MSigned Nov 8, 2023
- —Signed Nov 15, 2023
- —Signed Jan 14, 2021
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
JA Waterfront MACC Redacted.pdf
860 KBAdded in Justification version 3Posted
Lifecycle
- 3Version 3JustificationArchivedCurrent
N62473-21-D-1410 IDIQ MACC SB Set-Aside for New Construction, Repair, and Renovation of Waterfront Facilities, NAVFAC SW, Justification and Approval (J&A) to extend the contract term. FAR 6.302-1, only one or a limited number of responsible sources.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This procurement is for a multiple award construction contract (MACC) and is being advertised on an unrestricted basis inviting full and open competition. This procurement will use the two-phase design-build selection procedure which will consist of one solicitation covering both phases with the intent to award approximately eight (8) Indefinite Delivery Indefinite Quantity (IDIQ) construction contracts to the responsible offerors whose proposals, conforming to the Request for Proposal (RFP), will be most advantageous to the Government resulting in the best value, price and other factors considered. Price evaluation preference will be given to HUBZone Small Business concerns, in accordance with FAR 52.219-4. This is an IDIQ contract with no pre-established fixed contract prices. The actual amount of work to be performed and the time of such performance will be determined by the Contracting Officer or his/her properly authorized representative, who will issue written task orders to the contractor. Award of task orders will be on a firm fixed price basis. The work to be acquired under this solicitation is for new construction, renovation, and/or repair, by design-build or design-bid-build, of waterfront facilities at various Government installations located in California, Arizona, Nevada, Utah, Colorado, and New Mexico. However, it is anticipated that the majority of the work will be performed in California. Examples of relevant construction projects are construction projects similar in scope to: piers, wharves, quay walls, magnetic silencing facilities, bulkheads, sea walls, dry docks, boat ramps, docks and marinas, shore protection systems, rip rap, breakwaters, wave attenuation, mooring dolphins, buoys, primary and secondary fendering, pile driving, sheet piles, camels, separators, brows, gangways, dredging and disposal, all utilities for marine operations and other waterfront structures (both in and above water) related to waterfront operations (such as unexploded ordinance, crane rails, security, all applicable Federal, State, and local regulatory/environmental requirements, etc.) to support Navy vessels and port operations. The North American Industry Classification System (NAICS) code is 237990 (Other Heavy and Civil Engineering Construction), and the annual size standard is $45 million. The MACC will consist of one base period of two (2) years and three (3) one year option periods for a total maximum duration of five (5) years. The estimated price range, including the base and option periods, for all contracts combined is over $750,000,000. The only work authorized under this contract is work ordered by the government through issuance of a task order. Task orders will range between $50,000 and $100,000,000. Task orders may fall below or above this limit; however, contractors are not obligated to accept such task orders under the general terms of the contract. The government makes no representation as to the number of task orders or actual amount of work to be ordered; however, during the term of the contract, a minimum of $1,000 is guaranteed to be ordered from each awardee, under the performance period of the contract. Contractors are not guaranteed work in excess of the minimum guarantee. The Government intends to evaluate proposals and award contract(s) without discussions. Selection for award will be based on evaluation of the following: Phase One: Factor 1 - Technical Approach, Factor 2 - Experience, Factor 3 - Past Performance, and Factor 4 - Safety; Phase Two: Factor 5 - Technical Solution (based on Proposed Task Order 0001); Factor 6 - Small Business Utilization and Participation; and Factor 7 - Price (based on Proposed Task Order 0001). Source Selection procedures will be used and award may be made to the offeror(s) whose proposal is the most advantageous and offers the best value to the government, price and other factors considered. No site visit will be held and no pre-proposal conference will be conducted. THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY. No hard copies will be provided. IT IS THE CONTRACTORS RESPONSIBILITY TO CHECK THE WEBSITE DAILY FOR ANY AMENDMENTS TO THIS SOLICITATION. Prospective offerors MUST register themselves on the website. Plan holders lists will not be faxed and will be available only at the website listed above. Market research was conducted and a determination was made to solicit this procurement on an unrestricted basis inviting full and open competition. The U.S. Small Business Administration (SBA) San Diego District Office and the NAVFAC SW Small Business Office concurred with this decision. | 86% | Solicitation | 09/02/2026 |
Login at https://piee.eb.mil and search for 'N6247326RF505' to obtain more details.* | 61% | Solicitation | 08/11/2026 |
Solicitation 12363N23Q4131 This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation and proposals are being requested. PROJECT DESCRIPTION: California Trail Maintenance and Construction Blanket Purchase Agreement The California Trail Maintenance and Construction Blanket Purchase Agreement is a National BPA that will consist of a variety of work including both Trail Maintenance service types of work and Trail Construction types of work. The BPA will have a period of performance from early Summer 2023 through early Summer 2033 and can be utilized on all California Federal Forests and Grasslands and is available for all federal agencies to utilize. This solicitation is issued as a request for quotation (RFQ). This solicitation will remain Open and Continuous to add vendors when determined necessary for the 10-year period it is active. Make sure your firm is updated and registered in the System for Award Management system (SAM) and current to conduct government business. Please read the entire solicitation thoroughly to ensure all requirements in your response are included. PROJECT LOCATION: Projects shall covers the state of California including the following forests and grasslands; Angeles, Cleveland, Eldorado, Humboldt-Toiyabe, Inyo, Klamath, Lake Tahoe Basin Management Unit, Lassen, Los Padres, Mendocino, Modoc, Plumas, Rogue River-Siskiyou, San Bernardino, Sequoia, Shasta-Trinity, Sierra, Six Rivers, Stanislaus, and Tahoe National Forests and Butte Valley National Grassland. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around June 25, 2023. Engineering point of contact is Sally Cousins: (530)-551-1601. NAICS 237990 with size standard $45 mil. This project is set aside 100% for small business. | 60% | Combined Synopsis | 06/09/2023 |
Contractor to provide all labor, materials, and equipment necessary to repair the floating Jet Docks, BLDG 292. Work consists of: Remove and replace 18 damaged large Module Assemblies (MAs). Remove and replace 40 open well style or damaged small MAs and replace with standard small MAs. Remove and replace keel deflection system (KDS) on all nine docks. Remove and replace all pontoon straps and hardware (36” lifting eyes) for all nine docks. Remove and replace all 27 structural support beams and all 18 pontoon guide beams across all nine docks – 45 total. Install new cathodic protection system on all beams – 45 total. Remove valves and wiring on powerhead for all nine docks and replace with standard valves and wires. Install two freshwater washdown hoses, 40 ft length, per dock – 18 total. Install protection system between MAs and piling – one per dock, nine total. Install bunk tusk system, one per dock, nine total. Rebuild the dock stern to include intermediate corrugation support on all nine docks. Remove and replace any damaged pontoons with the same size and kind. If no longer in production, replace with closest approximation – approximately 6 pontoons. Install additional MAs on docks that are assigned the 29 ft RB-S II boats – 5 docks total, approximately 30 large MAs, 5 small MAs. Install new inner bunk systems on all docks to accommodate the boats described below: 29 ft RB-S II boats (8,400 lbs), 26 ft TANB boats (7,300 lbs), and 26 ft CB-OTH-V boats (7,470 lbs). Calibrate existing and replacement pontoons for the boats described above. For a layout of dock assignments, refer to the included drawing 2-29202-1. | 59% | Special Notice | 11/09/2026 |
Duluth Vessel Yard Phase III Repairs | 59% | Solicitation | 12/01/2026 |
Additional Details
Solicitation Number
N62473-21-D-1410-P00006
Archive Date
Feb 19, 2026
Office Address
SAN DIEGO, CA, 92132-0001