GovChime
Notice ID: 4af50e464dd1470798ad5967fff61931Solicitation

P-1231 Design-Build Wastewater Treatment Plant, Marine Corps Air Ground Combat Center, Twentynine Palms, California

Archived on July 7, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−07:00
Posted
June 16, 2020
Notice type
Solicitation
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFACSYSCOM SOUTHWEST
Place of performance
MCAGCC, Twentynine Palms, CA
Last updated
Dec 4, 2025

Identifiers

Solicitation number
N6247320R0022
Notice ID
4af50e464dd1470798ad5967fff61931

Description

This acquisition will result in a Firm-Fixed Price (FFP), construction contract, MCON P-1231, that will provide a new Wastewater Treatment Plant (WWTP), that includes a new primary and bypass headworks, a sludge removal drying system, clarifiers, tertiary treatment system, tertiary filtration system, pump stations and chlorination disinfection system. The project consists of constructing a treatment plant operations building. The facility will be a reinforced concrete masonry unit building with standing seam metal roof. The building will house a monitoring and control room, laboratory, pump maintenance area and an operator area. Facility-related control systems include cybersecurity features in accordance with current Department of Defense (DoD) criteria. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. The AT/FP (inside) line-item includes standard force protection measures such as mass notification systems, emergency shutoffs for ventilation systems, laminated windows, blast resistant window and door frames, and emergency lighting and signage. The location of this project is Marine Corps Base Twentynine Palms, California.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:N6247320R0022
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Market ResearchOct 30, 2019

    Design Build MCON Project P-1231 Wastewater Treatment Plant at Marine Corps Air Ground Combat Center (MCAGCC) Twentynine Palms, California

    Notice 7787d5501aa5a4208811ec5fb11f520e on SAM.gov

  2. Pre-SolicitationApr 9, 2020

    P-1231 Design-Build Wastewater Treatment Plant, Marine Corps Air Ground Combat Center, Twentynine Palms, California

    Notice 987f4955537d41d7b4ae77e0b804fd39 on SAM.gov

  3. 4×
    SolicitationCurrentMay 21, 2020

    P-1231 Design-Build Wastewater Treatment Plant, Marine Corps Air Ground Combat Center, Twentynine Palms, California

    Notice 4af50e464dd1470798ad5967fff61931 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

N6247320R0022

Archive Date

Jul 7, 2020

Office Address

SAN DIEGO, CA, 92132-0001