USS BLUE RIDGE 5C1 DSRA TYCOM 5
Archived on October 14, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM JST
- Posted
- September 25, 2025
- Notice type
- Solicitation
- NAICS
- 336611: Ship Building and Repairing
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVSUP.NAVSUP GLOBAL LOGISTICS SUPPORT.NAVSUP FLC YOKOSUKA.NAVSUP FLT LOG CTR YOKOSUKA
- Place of performance
- Yokosuka, Kanagawa
- Last updated
- Nov 7, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- N6264925RA054
- Notice ID
- 3e59363948c2486986a6daf689c38e7d
Description
The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work is composed of 13 Task Group Instructions (TGIs) with eight (8) Test Phases of various ship repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion.
The anticipated contractual Period of Performance (POP) is 21-JUL-2026 TO 21-NOV-2027 (Changed from the original POP of 12-JAN-2026 TO 15-MAY-2027)
Due to some technical difficulties, Task Group Instructions (TGIs) currenlty cannot be uploaded to SAM. Gov. Please kindly check the following TGIs and its descriptions for your reference.
3819P25501-A01: SHIP ALTERATION (SA) 80992K, MODIFICATION OF DEAERATING FEED TANK SIGHTGLASS INDICATOR DRAIN PIPING; ACCOMPLISH
3819P49501-A01: SA 82269K, LCC 19 ESLP N7 THEATER SECURITY COOPERATION OFFICE; ACCOMPLISH
3819P49501-T01: VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEM, SA 82269K
3819P49501-T02: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS
3819P51206-A01: SA 80964K, ACCOMPLISH AIR CONDITIONING LOAD CENTER 1-4; ACCOMPLISH
3819P51206-T01: TIGHTNESS AND OPERATIONAL TEST FOR CHILL WATER SYSTEM
3819P51206-T02: TIGHTNESS AND OPERATIONAL TEST FOR HEATING SYSTEM SA 80964K
3819P51206-T03: OPERATIONAL, VOLUMETRIC, AND BALANCE TEST FOR VENTILATION SYSTEM
3819P51206-T04: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT
3819P51206-T05: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT
3819P51206-T07: OPERATIONAL TEST WITH VIB-CUT AND VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEMS
3819P52302-A01: SA 81205K, MODIFICATION OF COUNTERMEASURE WASHDOWN (CMWD) PIPING;
ACCOMPLISH
3819P52302-T01: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS, SA 81205K
3819P52601-A01: SCD 11176K, MODIFICATION OF FORECASTLE DECK DRAIN AND PIPING; ACCOMPLISH
OFFER: Offerors must provide all information required by this solicitation not later than 30 Jun 2025 at 10:00AM Japan Standard Time (JST).
References in the Work Items will be provided to offerors via DoD safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email.
Please email request for references to: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil)
When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001.
When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022.
If there is a time limit on your offer, you must specify this at submission of your proposal.
If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section.
On 18 Jun 2025, Soliciation Amendment N6264925RA0540001 was issued and the required response date/time has changed from 30-Jun-2025 10:00 AM to 22-Jul-2025 10:00 AM as amended.
On 28 Aug 2025, Soliciation Amendment N6264925RA0540002 was issued to re-open the solicitation No. N6264925RA0540001 since revised TGIs with new POP dates of 21-JUL-2026 TO 21-NOV-2027 (Changed from the original POP was 12-JAN-2026 TO 15-MAY-2027) have been issued. The due date/time for submission of proposal for solicitation No. N6264925RA0540002 is 29 Sep 2025/10:00am.
On 25 Sep 2025, Solicitation Amendment N6264925RA0540003 was issued to incorporate a change in the wording 1) at section C under block 16. REMARKS on page two (2) in the Contract Data Requirements List (CDRL). Please refer to the revised CDRL uploaded on SAM.gov. The due date/time for submission of proposal remains 29 Sep 2025/10:00am.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (34)
- Download
Exhibit (A) BLR_5C1_TYCOM5 CDRL_r.pdf
152 KBAdded in Solicitation version 7Posted - Download
N6264925RA0540003.pdf
226 KBAdded in Solicitation version 7Posted - Download
TGI_3819P59301A01_c0v0.pdf
4.8 MBAdded in Solicitation version 5Posted - Download
TGI_3819P52802A01_c0v0.pdf
2.4 MBAdded in Solicitation version 5Posted - Download
TGI_3819P123AAA01_c0v0.pdf
933 KBAdded in Solicitation version 5Posted - Download
TGI_3819P52808A01_c0v0.pdf
396 KBAdded in Solicitation version 5Posted - Download
TGI_3819P52806A01_c0v0.pdf
225 KBAdded in Solicitation version 5Posted - Download
TGI_3819P51418A04_c0v0.pdf
206 KBAdded in Solicitation version 5Posted - Download
TGI_3819P14218A01_c0v0.pdf
190 KBAdded in Solicitation version 5Posted - Download
TGI_3819P123AFA01_c0v0.pdf
222 KBAdded in Solicitation version 5Posted - Download
TGI_3819P51419A01_c0v0.pdf
153 KBAdded in Solicitation version 5Posted - Download
TGI_3819P52801_A01_c0v0.pdf
185 KBAdded in Solicitation version 5Posted - Download
TGI_3819P51420A01_c0v0.pdf
167 KBAdded in Solicitation version 5Posted - Download
TGI_3819P123ADA01_c0v0.pdf
162 KBAdded in Solicitation version 5Posted - Download
TGI_3819P59301T01_c0v0.pdf
95 KBAdded in Solicitation version 5Posted - Download
TGI_3819P51413A01_c0v0.pdf
102 KBAdded in Solicitation version 5Posted - Download
TGI_3819P51418T02_c0v0.pdf
91 KBAdded in Solicitation version 5Posted - Download
TGI_3819P52808T01_c0v0.pdf
94 KBAdded in Solicitation version 5Posted - Download
TGI_3819P52802T01_c0v0.pdf
96 KBAdded in Solicitation version 5Posted - Download
TGI_3819P51418T01_c0v0.pdf
97 KBAdded in Solicitation version 5Posted - Download
TGI_3819P52801_T01_c0v0.pdf
83 KBAdded in Solicitation version 5Posted - Download
TGI_3819P51413T01_c0v0.pdf
24 KBAdded in Solicitation version 5Posted - Download
TGI_3819P52806_T01_c0v0.pdf
91 KBAdded in Solicitation version 5Posted - Download
BLR_5C1_TYCOM5 CDRL.pdf
145 KBAdded in Solicitation version 5Posted - Download
N6264925RA0540002.pdf
304 KBAdded in Solicitation version 5Posted - Download
N6264925RA054 Amendment 0001.pdf
141 KBAdded in Solicitation version 3Posted - Download
Attachment VIII Source of Repair Instruction.pdf
960 KBAdded in Solicitation version 1Posted - Download
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf
333 KBAdded in Solicitation version 1Posted - Download
Attachment VII Warranty Tracking Information.pdf
965 KBAdded in Solicitation version 1Posted - Download
Attachment V Contract data.pdf
104 KBAdded in Solicitation version 1Posted - Download
Attachment IV-3 Request for Information Form (SAMPLE).docx
36 KBAdded in Solicitation version 1Posted - Download
Attachment III GFP_List_V3 TYCOM5.xlsx
9.1 MBAdded in Solicitation version 1Posted - Download
Attachment II Proposal Sheet Generator v1.2.xlsx
169 KBAdded in Solicitation version 1Posted - Download
2.01 N6264925RA054 Solicitation.pdf
1.5 MBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
USS BLUE RIDGE 5C1 DSRA TYCOM 5
- 3Version 3SolicitationArchived
USS BLUE RIDGE 5C1 DSRA TYCOM 5
- 4Version 4SolicitationArchived
USS BLUE RIDGE 5C1 DSRA TYCOM 5
- 5Version 5SolicitationArchived
USS BLUE RIDGE 5C1 DSRA TYCOM 5
- 7Version 7SolicitationArchivedCurrent
USS BLUE RIDGE 5C1 DSRA TYCOM 5
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
N6264925RA054
Archive Date
Oct 14, 2025
Place of Performance Country
JAPAN
Office Address
FPO, AP, 96349-1500