GovChime
Notice ID: c578391ff7f3a8ac4b5a1d6f4a79c42dSolicitation

Y--FY20 MCON P-459, BACHELOR ENLISTED QUARTERS H. NAVAL BASE, GUAM, JOINT REGION MARIANAS, GUAM

Archived on September 30, 2020. Full description on SAM.gov.

Overview

Posted
August 16, 2019
Notice type
Solicitation
NAICS
236116: New Multifamily Housing Construction (except For-Sale Builders)
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFACSYSCOM PACIFIC
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Sep 25, 2026

Identifiers

Solicitation number
N6274219R1305
Notice ID
c578391ff7f3a8ac4b5a1d6f4a79c42d

Description

This is a modification to the synopsis issued on March 14, 2019. Procurement will include a pre-priced option to perform full clearance ahead of construction for Munitions and Explosives of Concern (MEC) / Material Potentially Presenting an Explosive Hazard (MPPEH) for areas with high (red) probability of encountering MEC/MPPEH, complete and in accordance with Section 01 57 19.03. The option may be exercised within 150 calendar days from the date of contract award if it is determined to be in the best interest of the Government. ALL OTHER INFORMATION IN PREVIOUS SYNOPSIS REMAINS UNCHANGED

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

A. SAKI-ELI 808-474-5356 A. Saki-Eli

Documents

No documents available.

Lifecycle

Solicitation:N6274219R1305
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    Pre-SolicitationMar 14, 2019

    Y--FY20 MCON P-459, BACHELOR ENLISTED QUARTERS H, NAVAL BASE GUAM, JOINT REGION MARIANAS, GUAM

    Notice 54bee349fa790b10f143fa677f48f901 on SAM.gov

  2. SolicitationCurrentAug 16, 2019

    Y--FY20 MCON P-459, BACHELOR ENLISTED QUARTERS H. NAVAL BASE, GUAM, JOINT REGION MARIANAS, GUAM

    Notice c578391ff7f3a8ac4b5a1d6f4a79c42d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
THIS IS NOT A SOLICITATION. THIS IS A REQUEST FOR INFORMATION ONLY. SEE ATTACHMENTS FOR FULL DETAILS. The anticipated project includes, but is not limited to: • Furnishing and installing a large roll-up door within an existing non-load-bearing concrete masonry unit (CMU) wall. • Demolition, cutting, removal, framing, finishing, and related work necessary to create the new door opening. • Relocation and/or modification of affected utilities, including electrical power, compressed air, and water lines. • Relocation of an existing air-conditioning unit and associated ductwork to accommodate installation and operation of new equipment. • Restoration of affected interior and exterior finishes. • Coordination of work in an operational facility and compliance with installation access, safety, environmental, and utility-outage requirements. See the attached questionnaire for full details available at this time.
-Market Research12/01/2026
Design-Build (DB)/Design-Bid-Build (DBB) Indefinite Delivery Indefinite Quantity (IDIQ) Service Disabled Veteran Owned Small Business Multiple Award Construction Contract (SDVOSB MACC), Various Locations, State of Hawaii
-Solicitation09/16/2026
The purpose of this amendment is to provide the Government's response to a vendor question that was inadvertently omitted from previous posting. Question: Hallway '4-way dimmable switches with ceiling occupancy sensors': please confirm the number of switch locations and sensors per hallway/ What is the quantity of 4-way dimmable switches? Answer: 4-way dimmable switches and 4 ceiling occupancy sensors. 2 locations per hallway for the dimmable switches for a total of 4. All other solicitation terms, conditions, and the proposal due date remain unchanged. No further Q&A permitted. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The full details are included with the previous solicitation notice.
-Combined Synopsis10/30/2026
The U.S. Navy awarded a sole-source procurement in accordance with Federal Acquisition Regulation (FAR) Subpart FAR 6.302-2 Unusual and Compelling Urgency. This post-award notice is not a request for competitive quotes or proposals. The Government determined that only one source was able to meet the technical requirements necessary for this procurement. In accordance with FAR Part 5, the Navy is publishing this notice to promote transparency and provide information regarding the award. Because the procurement has already been awarded, capability statements or other responses will not be considered for this action.
-AwardedOpen
This acquisition is for the construction (design-bid-build (DBB)) of aircraft pavements to support multiple airframes including aircraft parking apron and adjoining taxiway. Construction includes concrete aircraft parking and taxi area. Project will provide adequate concrete aircraft access apron and expansion and improvement of existing taxiway, including provision of all required pavement markings in compliance with Air Force Instruction 32-1042 and Engineering Technical Letter 04-02. Project will provide an access road and vehicle parking area to the rear of the aircraft apron. The work will include one (1) pre-priced option to construct; Option No. 1 is for bulk formation under future hangar zone. In accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item, the Government may exercise the option by written notice to the Contractor within 365 days of contract award. The magnitude of this project is estimated between $25,000,000 and $50,000,000. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 237310 AND AVERAGE ANNUAL RECEIPTS OF $45 MILLION OVER THE PAST THREE YEARS. THIS PROCUREMENT IS UNRESTRICTED. The contract completion period is anticipated to be 615 calendar days. This is a source selection procurement requiring the submission of both technical and price proposals. Proposals submitted in response to this solicitation shall be in the English language and in U.S. dollars. The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.202(a)(2)). Therefore, the initial proposal shall conform to the solicitation requirements and should contain the best offer from a technical and price standpoint. Only the three (3) lowest-priced proposals will be evaluated for fair and reasonable pricing and technical acceptability. If none of the three (3) lowest-priced proposals are found to be technically acceptable, then all remaining proposals will be evaluated for fair and reasonable pricing and technical acceptability. The contract resulting from this solicitation will be awarded to that responsible Offeror whose offer, conforming to the solicitation, is determined to be the lowest evaluated price of proposals (within the funds available) meeting the acceptability standards for the technical evaluation factors. The following evaluation factors shall be used to evaluate the technical proposals. FACTOR 1: EXPERIENCE FACTOR 2: PAST PERFORMANCE FACTOR 3: SAFETY FACTOR 4: MANAGEMENT PLAN For Factor 1 Experience, a relevant construction project is defined as new construction of Airfield that includes at least one (1) of the following individual feature: New construction of Airfield Portland Cement Concrete (PCC) Pavement: New airfield (aircraft runway, taxiway, or apron) PCC pavement of at least 10,000 square meters with a minimum concrete thickness of 300 mm. Flexible pavement construction will not be considered when evaluating experience in Airfield PCC Pavements. Only pavement of aircraft runways, taxiways, or aprons will be considered. Projects submitted to demonstrate Airfield PCC Pavements will only be considered if the work was performed by the specific entity proposed for Airfield PCC pavements. Construction shall be completed or substantially completed no earlier than last fifteen (15) years from the date of issuance of this RFP. Substantially complete means at least 90% physically complete. New construction of Airfield Asphalt Concrete (AC) Pavement: New airfield (aircraft apron, taxiway, or runway) AC pavement of at least 10,000 square meters with a minimum asphalt concrete thickness of 50 mm. Airfield PCC pavement construction will not be considered when evaluating experience in Airfield AC Pavements. Only pavement of aircraft apron, taxiway, or runway will be considered. Projects submitted to demonstrate Airfield AC Pavements will only be considered if the work was performed by the specific entity proposed for Airfield AC Pavements. Construction shall be completed or substantially completed no earlier than fifteen (15) years from the date of issuance of this RFP. Substantially complete means at least 90% physically complete. Projects submitted shall collectively demonstrate experience in both individual features: (1) Airfield PCC Pavement and (2) Airfield AC Pavement. Individual features do not have to be within any single project scope. The Request for Proposal (RFP) is anticipated to be available on or around 13 October 2026. Please note that these dates (RFP issuance and response date) are estimates only and will be as shown in the RFP. Printed copies or CDs will not be issued. The RFP will be available on the SAM website. Amendments will be posted to the SAM website. It is the responsibility of the offeror to check the SAM website periodically for any amendments to the solicitation.
-Pre-Solicitation12/17/2026

Additional Details

Solicitation Number

N6274219R1305

Archive Date

Sep 30, 2020

Office Address