GovChime
Notice ID: dec044e72a51451f8e0087b5df3b6dd2Presolicitation

D/B UFC Renovation of C2 Fusion Center, Basa Air Base, Floridablanca, Pampanga, Philippines

Archived on August 30, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC+07:00
Posted
August 27, 2024
Notice type
Presolicitation
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFACSYSCOM PACIFIC
Place of performance
Pampanga
Last updated
Dec 4, 2025

Identifiers

Solicitation number
N6274224R6706
Notice ID
dec044e72a51451f8e0087b5df3b6dd2

Description

Amendment 0002 to Solicitation N6274224R6706 is issued per attached. Exhibit D - revised BOQ is provided in both pdf. and excel formats, for your use. Only revised price proposals, per amendment 0002, are required, The deadline for submitting your revise price proposal is 30 August 2024 no later than 11:00 a.m. Thailand time. Please acknowledge receipt of the amendment. ************************************************************************** Amendment 0001 for solicitation N6274224R6706 is released. Date for submission of proposals is changed to 2 July 2024, no later than 11:00 a.m. Thailand time. ********************************************************************************* This is a design build project for the design and construction/renovation of the current C2 Fusion Center at Basa Air Base, Floridablanca, Philippines. The scope includes the renovation of an existing facility, construction of a new guard shack, perimeter security fence with integrated lighting, enhancement of building security, sealing gaps in exterior penetration, and the provision of CCTV cameras along the fence and within the existing C2 Fusion Center. The design-build contract requires essential site work, excavation, and the construction of approximately 260 meters of perimeter security fencing and lights. Additionally, enter/exit turnstiles and a gate will be installed within the fence line. A new guard shack, measuring approximately 14 square meters, will be constructed with a covered walkway connecting it to the building's facade. The guard shack will be equipped with climate control, internet connectivity, and necessary electrical and HVAC utilities. CCTV cameras, with specific peripheral views outlined in the attached layout, will be strategically positioned on both the new perimeter fencing and inside the existing C2 Fusion Center. Notably, the guard shack, security fencing, lights, and CCTV installation constitute new construction, while the security enhancements for the exterior ceiling/awnings involve the renovation of existing facility space. Construction and renovation elements include but not limited to the following: site planning, site verification, design, and construction coordinate with utility providers and other local Government agencies acquiring required construction permits site electrical systems; and development of as-built drawings and operation and maintenance manuals. After award, this Statement of Work (SOW) may be modified as determined by the Contracting Officer to address unforeseen conditions or further refine the requirements to better accomplish the project objectives based on new information realized during the administration of the contract. The North American Industry Classification System (NAICS) Code is 236220 and Average Annual Receipts is $45.0 Million. Estimated range is between $1,000,000 million to $5,000,000 million U.S. Dollars. The contract completion period is anticipated to be 210 calendar days. This is a source selection procurement requiring the submission of both technical and price proposals. All contractors are advised that registration in the System for Award Management (SAM) database is required prior to offer submission and award of a contract, refer to FAR 52.204-7 System for Award Management (OCT 2018). Failure to register in the SAM Database may render your firm ineligible for award. For more information, check the SAM Website at http://www.sam.gov. The Federal Acquisition Regulations (FAR) requires the completion of electronic annual representations and certifications prior to award of a contract. Solicitation N6274224R6706 is tentatively scheduled be released by 26 April 2024 and a Pre-Proposal Site Visit (PPSV) and conference for this project is tentatively scheduled for during the week of 20-24 May 2024. The site visit is to provide Offerors with an opportunity to familiarize themselves with the jobsite and conditions to be encountered and is not for the purpose of answering questions. Offerors interested in attending the pre-solicitation site visit shall submit a Site Access Request for PPSV form with IDs/Passports to artitar@state.gov, copy williamsrg@state.gov no later than 11:00 a.m. on 19 April 2024 (Fri) Local Time, Bangkok, Thailand. Contractors may submit up to four names but will be limited to two attendees per contractor to include subcontractors. This base access process is only for the list of attendees the US Government is facilitating. Contractors that request access after the required date will not be added to the US Government list but will still be allowed to attend the site visit with two attendees if they can get access to the base on their own. This is a limitation imposed by the host nation. The Base Access Request is mandatory and the PPSV is required if you intend to submit proposals. Additional name list cannot be added or modified to the base access request after 19 April 2024. ATTACHMENT A Pre-proposal Site Visit (PPSV) Site Access Request ************************************** Solicitation N6274224R6706 D/B UFC Renovation of C2 Fusion Center, BASA Air Base, Floridablanca, Pampanga, Philippines is released. Proposal Delivery: Bid packages should be emailed to the following addresses, artitar@state.gov and williamsrg@state.gov. In order to avoid over limited size of our internet server, the proposal packages shall be broken down to not exceed 5 MB per email. Date for proposal submission is 24 JUNE 2024 no later than 11:00 a.m. Thailand Time. Pre-proposal Site Visit (PPSV) is on 10 June 2024 at 9:00 a.m. local time at BASA Airbase compound, Floridablanca, Pampanga, Philippines, GPS coordinates: 14 58'54.8"N 120 30'18.2"E. - Site access for the PPSV is available for only those who submitted request for the site access for this project in advance before 19 April 2024 due to host nation's restriction. - Please review the solicitation package and submit Request for Information (RFI), using Exhibit A Pre-proposal Inquiry Form, for any questions you may have. RFIs can be submitted from now on. Ensure SAM status is ACTIVE. Inactive or expired status will not be considered for evaluation.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:N6274224R6706
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 8×
    Pre-SolicitationCurrentApr 5, 2024

    D/B UFC Renovation of C2 Fusion Center, Basa Air Base, Floridablanca, Pampanga, Philippines

    Notice dec044e72a51451f8e0087b5df3b6dd2 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

N6274224R6706

Archive Date

Aug 30, 2024

Place of Performance Country

PHL

Office Address

JBPHH, HI, 96860-3134