Notice ID: 1c876325cdd74a96a86ac99ee876b155Solicitation
CLB-Finish Machining Fixture Fabrication
Archived on February 25, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−05:00
- Posted
- February 5, 2020
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 332312: Fabricated Structural Metal Manufacturing
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NSWC PHILADELPHIA DIV
- Place of performance
- Philadelphia, 19112
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- N6449820Q5047
- Notice ID
- 1c876325cdd74a96a86ac99ee876b155
Description
The contractor shall procure material and fabricate two (2) each custom steel finish machining fixtures referenced in Section 2.0 Applicable Documents – DWG-1420-0354. The contractor shall not deviate from the required parts list. The fabrication shall be in accordance with requirements annotated within the general notes, fabrication notes, welding notes, and assembly notes listed on page five (5) of the drawing. The contractor shall not deviate from the drawing specifications. The contractor shall deliver both machining fixtures as quickly as possible, but no later than six (6) weeks After Date of Contract (ADC). The Contractor shall procure material in accordance with (IAW) the List of Materials on page four (4) of the referenced document. No deviation will be acceptable. The contractor shall fabricate two (2) each custom steel finish machining fixtures in accordance with (IAW) the general notes, fabrication notes, machining and assembly notes detailed on sheet five (5). The contractor shall inspect the fixtures in accordance with (IAW) the Inspection Points (IPs) and Datum Information Table on page three (3) of the referenced document. The contractor shall provide an inspection report containing the results of all inspection point measurements (CDRL A001). No deviation will be acceptable. The contractor shall, upon completion of fabrication and inspection, coat the top and bottom faces of the fixtures (including the locating pin holes) with a corrosion inhibiting preservative such as LPS-3. Once preserved, ship the machining fixtures to the address referenced in Section 6. The arrival date shall not exceed six (6) weeks After Date of Contract (ADC) Award. As a part of the Government’s Quality Assurance Program, the Government shall reserve the option to witness any of the manufacturing, testing, machining, or inspection operations conducted by the contractor or the contractor’s subcontractor.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
N6449820Q5047- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×SolicitationCurrentJan 27, 2020
CLB-Finish Machining Fixture Fabrication
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
N6449820Q5047
Archive Date
Feb 25, 2020
Office Address
PHILADELPHIA, PA, 19112-1403