Notice ID: 8d88b0b18ca14908964a04532730abb5Combined Synopsis/Solicitation
Install New Access Control System
Archived on April 22, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 PM UTC−07:00
- Posted
- April 22, 2024
- Notice type
- Combined Synopsis/Solicitation
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVAL AIR WARFARE CENTER
- Last updated
- Sep 9, 2025
Identifiers
- Solicitation number
- N6893624Q0089
- Notice ID
- 8d88b0b18ca14908964a04532730abb5
Description
The purpose of this modification is to extend the closing date to 4/29/2024 02:00 PM PST and there will be not more extensions. To provide answers to questions that were missed from the previous cut off date. This concludes all questions and answers. Questions Answers 1. Are Scaled Drawings available, if so please post. Dont have access to scaled drawing. 2. Are Ceilings Suspended? Or Hard Lid? Open ceiling which will require conduit 3. Are there existing Cable Trays for wiring above ceilings? No cable trays 4 .Can Existing Wiring be utilized? No 5. Is a UPS required? If so, What Time/Power Duration is required? No UPS required. The Identiv and Altronix has dual backup batteries. 6. Are Or Equal Equipment substitutions allowed? As long as the part specified functions, performs, and has the same quality. 7. Is Plenum Wire acceptable? Not for underground. Refer to SOW. 8. Is After Hours Access for said work, available to contractor at no add l cost to the Govt? NO 9. What is the height of Exterior Cameras? (If any) Top of existing fence post is acceptable 10. Please provide/post other Q & A requests. ??????? 11.Please provide a list of equipment to be installed. Refer to SOW 12 Are there pipe chases between floors? Between what floors? Single level. 13. What is the range of the budget for this project, and is it already appropriated? NA This information is not available. When requirement comes to Simplified Acquisition it is submitted for procurement for purchased. 14. Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed? Payment will be Net 30 after completion of Job. (We are Simplified Acquisitions and we dont provide progress payments) 1. How many feet of new wire will have to be run? Refer to SOW, Recommend job walk 2. What is the total count of doors and readers? As stated in the SOW- 2 each Identiv 8336ABTR000 uTrust TS ScrambleProx insert reader
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
N6893624Q0089- Combined Synopsis
- 3×Combined SynopsisCurrentApr 10, 2024
Install New Access Control System
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
N6893624Q0089
Archive Date
Apr 22, 2025
Office Address
CHINA LAKE, CA, 93555-6018