Notice ID: 4f6d92b242a94a5c9f35a9e6449ff23fCombined Synopsis/Solicitation
Network Cabling System and Installation
Archived on July 9, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM UTC−07:00
- Posted
- June 27, 2024
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVAL AIR WARFARE CENTER
- PSC
- 7G21: IT AND TELECOM - NETWORK: DIGITAL NETWORK PRODUCTS (HARDWARE AND PERPETUAL LICENSE SOFTWARE)
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- N6893624Q0146
- Notice ID
- 4f6d92b242a94a5c9f35a9e6449ff23f
Description
The purpose of this amendment is to post the Q&A. The Naval Air Warfare Center Weapons Division at China Lake, CA intends to procure on a full and open competitive basis this requirement for 1) Network Cabling System and Installation (QTY 1 Lot), in accordance with FAR Parts 12 and 13. Complete details can be found in the specifications located in Section C of the solicitation. All responsible sources may submit a quote, which shall be considered by the agency. The Q&A will be posted on or about 6/28/2024. All quotes must be submitted to donell.e.duenassims.civ@us.navy.mil by 7/9/2024. All responsible sources must be registered in the System for Award Management (SAM) database at the following website: https://www.sam.gov/portal/public/SAM/. Going forward, all new entities registering in GSA's System for Award Management (SAM), as well as existing registrations being updated or renewed, will require the submission of an original, signed notarized letter identifying the authorized Entity Administrator for the entity associated with the Data Universal Numbering System (DUNS) number. Effective June 11, 2018, entities who create or update their registration in SAM.gov to apply only for federal assistance opportunities such as grants, loans, and other financial assistance programs, have a notarized letter on file within 30 days of registration. Additionally, Effective June 29, 2018, all non-Federal entities who create or update their registration in SAM.gov, have a notarized letter on file within 30 days of registration. It is recommended that all interested parties be aware that processing this additional information may take several days and are proactive in maintaining the SAM registrations in an "Active" status as the government cannot award to an entity without an "Active" SAM registration. More information can be found at www.gsa.gov/samupdate. Contractors must be certified through Defense Logistics Information Services (DLIS) in order to access Controlled Unclassified Information within FBO. See the DLIS website for registration details: https://www.logisticsinformationservice.dla.mil/jcp/.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
N6893624Q0146- Combined Synopsis
- 3×Combined SynopsisCurrentJun 11, 2024
Network Cabling System and Installation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
AMENDMENT 0017, issued on 2/12/26, requests FPRs from Phase Two Offerors ONLY. AMENDMENT 0016, issued on 2/12/26, Closes Discussions. AMENDMENT 0014, issued on 1/26/26, Opens Discussions with Phase Two Offerors ONLY. Please note that Phase Two is only open to Offerors who successfully qualified during Phase One of the subject solicitation. This acquisition will result in an unrestricted full and open Firm-Fixed-Price (FFP) Design-Build (DB) contract for the design and construction of Design-Build (DB) P-1241 Low Altitude Radio Communication System (LARCS) Communication Towers for Marine Air Ground Task Force Training Command (MAGTFTC) Twentynine Palms, California. The project scope constructs new communication towers and restores and modernizes existing communication towers on remote mountaintops or hilltops. With the exception of Bearmat Hill, work sites are only accessible by helicopter and are without any utilities such as electricity, water, and sewer. The contractor shall provide necessary utilities to the site as required. The project will require coordination and collaboration of multiple Government/Department of Defense (DOD) commands in performing all tasks and work as described in this RFP. Naval Sea Systems Command (NAVSEA) and its contractors shall provide LARCS and other communication infrastructure support, collateral, and Government Furnished Equipment (GFE) to be installed by the P-1241 project as Government Furnished – Contractor Installed (GF-CI) on all Operating Position (OP) sites in the immediate vicinity of the communication tower work items. NAVSEA shall provide oversight for installation, construction, testing, and commissioning leading to LARCS and MAGTFTC training range System of Systems (SoS) acceptance. | - | Solicitation | 02/18/2026 |
Design-Build MILCON Project P-481 Energy Resilience Phases 3 and 4 at Mountain Range Warfare Training Center (MWTC), Bridgeport, CA. | - | Solicitation | 12/04/2025 |
Amendment 0007: Incorporate Government responses to Requests for Information (RFIs) into solicitation. Amendment 0006: Incorporate commissioning requirement(s), revised RFP Sections in Parts 2, 3, and 5; extend Requests for Information (RFI) due date and incorporate Government responses to RFIs. Amendment 0005: Incorporate FAR 52.217-4, an updated Wage Determination, and PIEE Solicitation Module Vendor Access Instructions into the solicitation. Amendment 0004: Incorporate Government responses to Requests for Information (RFIs). Amendment 0003: Incorporate Government responses to Requests for Information (RFIs), and extend RFI due date. Amendment 002: Extension of RFI due date and incorporation of updated Wage Determination. Amendment 001: Provision of Site Walk Attendance Sheet CLIN 0001 (FFP): This is a Firm Fixed-Price (FFP) Design-Build (DB) construction project involving partial demolition and replacement of three (3) unit substations (T6, T7, and T9), medium voltage conductors, and low voltage associated components between the transformers and switchboards in Building 234 at Naval Support Activity Monterey (NSAM) ? Halligan Hall. CLIN 0002 (FFP): Optional Item One (1) - Install a spare 5-inch conduit from Manhole 8 to the new Building 234 substation. CLIN 0003 (FFP): Optional Item Two (2) - Provide and install new distribution switchboards, including circuit breakers. | - | Solicitation | 03/29/2023 |
Amendment 7- Extend proposal due date to 11/13/2026- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project | - | Solicitation | 11/13/2026 |
Login at https://piee.eb.mil and search for 'N6247322RX011' to obtain more details.* | - | Solicitation | 10/27/2026 |
Additional Details
Solicitation Number
N6893624Q0146
Archive Date
Jul 9, 2025
Office Address
CHINA LAKE, CA, 93555-6018