Laser Interferometer Space Antenna (LISA) Frequency Reference System (FRS) Flight
Archived on October 4, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:30 PM EDT
- Posted
- September 15, 2026
- Notice type
- Presolicitation
- Set-aside
- No Set aside used
- NAICS
- 336414: Guided Missile and Space Vehicle Manufacturing
- Agency
- National Aeronautics and Space Administration
Notice details
- Office
- NASA GODDARD SPACE FLIGHT CENTER
- Place of performance
- 7470, Colorado
- PSC
- 1675: SPACE VEHICLE COMPONENTS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- NASA-GSFC-LISA-FRS-FLIGHT
- Notice ID
- 73a5bab1f8944f95a0f5ef241b9dfb2c
Description
NASA/GSFC has a requirement for the design, fabrication, qualification, and delivery of flight Frequency Reference System (FRS) hardware for NASA's Laser Interferometer Space Antenna (LISA) mission, consisting of three Flight Models and one Flight Spare. Each FRS unit comprises two tightly coupled subsystems, the FRS optical reference cavity (FRS-O) and the FRS frequency-locking electronics (FRS-E), which together stabilize the laser frequency using a Pound-Drever-Hall lock to meet LISA's picometer-scale measurement needs, with deliveries required on an aggressive schedule between February 2029 and May 2030. Minimal post-delivery support is included.
NASA/GSFC intends to issue a sole source contract to BAE Systems Space & Mission Systems Inc. (BAE SMS) under the authority of FAR 6.103-1, to acquire the LISA FRS flight hardware. Based on a publicly issued Sources Sought Notice, only BAE SMS is capable of meeting the full FRS-O and FRS-E requirements within the fixed delivery schedule. BAE SMS possesses directly relevant flight heritage across both the FRS-O and FRS-E subsystems, including the GRACE Follow-On and GRACE-C optical cavities that are heritage to the LISA FRS-O, and it is already under contract with NASA GSFC developing mature, pre-flight LISA FRS hardware through a full Technology Readiness Level and Engineering Test Unit phase. This existing hardware baseline, combined with BAE's established relationships with the specialized suppliers of the custom, long-lead FRS components, positions BAE SMS to meet the aggressive delivery dates required for NASA system-level integration and subsequent delivery to ESA under the NASA-ESA Memorandum of Understanding. No other source possesses the hardware maturity, technical heritage, or supplier relationships to successfully meet NASA requirements. Accordingly, only one responsible source can satisfy the Government's requirements, and no other supplies or services will meet the agency's need.
The Government does not intend to acquire a commercial product or commercial service using FAR Part 12.
Interested organizations may submit their capabilities and qualifications to perform the effort electronically via email to stefan.d.flessa@nasa.gov not later than 4:30 PM Eastern Time on September 19, 2026. Such capabilities/qualifications will be evaluated solely for the purpose of determining whether to conduct this acquisition on a competitive basis. A decision by the Government not to compete this acquisition on a full and open competition basis, based upon responses to this notice, is solely within the discretion of the Government.
NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at : https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds-Comp-Advocate-Listing.pdf
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (3)
- Download
Attachment B - LISA FRS Flight Requirements Document.pdf
4.6 MBAdded in Sources Sought version 3Posted - Download
80GSFC27R0002_LISA FRS Flight_Draft SOW.pdf
925 KBAdded in Presolicitation version 4Posted - Download
Attachment A - LISA FRS Flight SOW.pdf
499 KBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchived
Laser Interferometer Space Antenna (LISA) Frequency Reference System (FRS) Flight
- 4Version 4PresolicitationArchived
Type changed from Sources Sought to Presolicitation
Laser Interferometer Space Antenna (LISA) Frequency Reference System (FRS) Flight
- 6Version 6PresolicitationArchivedCurrent
Laser Interferometer Space Antenna (LISA) Frequency Reference System (FRS) Flight
Similar Opportunities
Additional Details
Solicitation Number
NASA-GSFC-LISA-FRS-FLIGHT
Archive Date
Oct 4, 2026
Office Address
GREENBELT, MD, 20771