GovChime
Notice ID: 383c341323c6949654bc7ed30f2acadfSpecial Notice

INTENT TO SOLE SOURCE-PCAS BLDG 101 ELECTRICAL SWITCHGEAR

Archived on June 16, 2017. Full description on SAM.gov.

Overview

Posted
June 6, 2017
Notice type
Special Notice
NAICS
541310: Architectural Services
Agency
Department of CommerceNATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY

Notice details

Office
DEPT OF COMMERCE NIST
Place of performance
100 Bureau Drive, Gaithersburg, 20899
PSC
C: ARCHITECT/ENGINEER SERVICES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
NB195000-17-02086A
Notice ID
383c341323c6949654bc7ed30f2acadf

Description

This is not a request for quotations or an announcement of a forthcoming solicitation, but merely notification of the National Institute of Standards and Technology (NIST) intent to issue, a sole-source, a firm fixed-price purchase order to Mueller Associates for post construction award services (PCAS) for Bldg. 101 Electrical Switchgear Replacement. Mueller Associates is the designer of this work. The State of Maryland requires professional engineers to stamp/seal and sign drawings, Mueller as the "Professional Engineer of Record" is responsible for the design. Mueller Associates will review construction documents, answer request for information, and inspect the construction. Under the authority of Federal Acquisition Regulations (FAR) Part 6.302-1, the Contracting Officer has determined that the circumstances of the contract action deem only one responsible source and no other supplies or services will satisfy agency requirements. The period of performance is 365 days from date of award. A determination by NIST not to compete this proposed requirement based upon responses to this notice is solely within the discretion of NIST. The government does not intend to pay for information provided in response to this notice. The NAICS code 541310 Architectural Services is the applicable for this requirement. Written responses to this notice shall contain sufficient documentation to establish a bona fide capability to fulfill this requirement. Responses shall be submitted by 11:00AM ET on June 16, 2017 to sandra.smith@nist.gov.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Gina Lee
Contract Specialist

Documents

No documents available.

Lifecycle

Solicitation:NB195000-17-02086A
  1. Special NoticeCurrentJun 6, 2017

    INTENT TO SOLE SOURCE-PCAS BLDG 101 ELECTRICAL SWITCHGEAR

    Notice 383c341323c6949654bc7ed30f2acadf on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Modification 2 to Presolicitation Notice 36C25527R0007, P/N 657-27-209JB, Project Title: Renovate Building 1 and 53 Main Lobbies. This modification provides answers to RFIs received, revised evaluation criteria and revised supplement B per below RFIs. The SF330 submission due date is extended from November 10, 2026 to November 16, 2026. RFIs Received with VA Responses in blue text: Construction Budget questions: Is that the Estimated Cost of Construction or the maximum for the A/E Design Fee? Estimated Cost of Construction If the $949,026 is the construction budget, this appears low in today's environment given that over 6,000 SF needs to be renovated. Can the VA please re-evaluate this budget and provide an update? The construction budget that was originally used in the supplement B pre-solicitation notice is incorrect. A revised supplement B is attached, changing the construction cost estimate from $949,026 to $725,873. The Construction budget is set and cannot be changed until the design process is underway. Key Personnel questions: The Presolicitation Notice lists: Supervisory, Fire Protection Engineer, Certified Professional Industrial Hygienist, and Life Safety Engineer. The Statement of Work and Supplement B list: Communications (voice/data), Interior Design, VPIH, Plumbing (including fire protection), and a 3rd Party Fire Protection Review. Questions: Which positions require resumes in Section E? What is the intended role of "Supervisory"? Per the SOW & Supplement B the following positions require resumes: Project Manager, Architectural, Mechanical, Electrical, Communication (voice data) Plumbing (Including Fire Protection), Structural, Interior Design, VPIH, Cost Estimator and a 3rd Party Fire Protection Review. Project manager is Supervisory Industrial Hygienist/Asbeston Project Designer: Question: Is an ABIH Certified Industrial Hygienist (CIH) acceptable for this position, and does a CIH satisfy the requirement for the VPIH and the state-accredited Asbestos Project Designer? If these must be separate individuals, should both be identified in the SF330? A CIH satisfies the requirement for the VPIH and the state-accredited Asbestos Project Designer. They can be the same individual. Site Visit: Supplement B, page 6, Section III.6.g: the A/E "shall meet with the COR at the proposed project site" prior to submitting a response Presolicitation Notice, page 4: "Personal visits to discuss this announcement will not be allowed" and only "the most highly rated firm must physically come to the site" before pricing Question: Please confirm that no site visit is required before the SF330 submission. No site visit is required prior to SF330 submission. Laboratory and Special Room Rquirements: Presolicitation Notice, page 7, Evaluation Criteria 2, Specialized Experience and Technical Competence: "laboratory requirements for the firm" Supplement B, page 18, Section B6.II.1: "floor plans of special rooms such as the endoscopy suite, recovery room, etc." Questions: Neither a laboratory nor an endoscopy suite or recovery room appears in the project scope. Do any of these requirements apply to this project? These requirements do not apply to this project. Can the VA please release updated and corrected documents? The evaluation criteria 2 will be changed to remove laboratory requirements for the firm and the COR will revise Supplement B to remove the endoscopy suite and recovery room from the Supplement B.
59%
Pre-Solicitation11/16/2026
Please be advised that the submission deadline for SF 330 has been extended from November 13, 2026, to November 20, 2026, at 2:00 PM EST. Responses to the RFIs are currently being prepared and will be posted prior to the revised due date.
46%
Market Research11/20/2026
VE Study of RRMC Power Plant Project
46%
AwardedOpen
This notice does not constitute a Request for Quote (RFQ), Invitation for Bid (IFB), or Request for Proposal (RFP), nor does it promise to issue any such solicitations in the future. This notice does not commit the U.S. Government to contract for any supply or service. Further, the U.S. Government is not seeking quotes, bids, or proposals at this time and will not accept unsolicited proposals in response to this sources sought notice. This announcement and the related draft Statement of Work (SOW) are published solely to identify interested firms and to solicit industry comments, suggestions, recommendations, and feedback aimed at supporting and improving the Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The intent of the 374th Contracting Squadron (374 CONS) is to subsequently solicit and award an Indefinite Delivery/Indefinite Quantity (IDIQ) Simplified Acquisition of Base Engineering Requirements (SABER) construction contract. SABER is a single-award, design-build indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on a general statement of work (SOW) further defined with each individual task order. The scope of this contract generally includes non-complex, minor design efforts and multiple construction trades. This includes, but is not limited to, interior renovations and alterations—such as office and restroom renovation and repairs—demolition works, asbestos and hazardous materials (HAZMAT) abatement, as well as general building construction, civil engineering, mechanical, electrical, and telecommunications works. This contract utilizes a Government-furnished Unit Price Guide (UPG) provided in advance. The UPG will be shared with the contractor, who shall prepare all subsequent task order proposals and price quotes based on the established unit prices. The contract maximum amount is $49M. The total Period of Performance of contractual coverage shall not exceed five (5) years and plus optional three (3) years. The anticipated period of performance is 1 June 2027 – 30 May 2034. All companies must be registered within the System for Award Management (SAM) (https://www.sam.gov). DFARS clause 252.225-7042 applies to this procurement. Under this clause, the offeror represents that it is properly authorized to conduct business and commerce in the country or countries where this contract is to be performed, which is a mandatory prerequisite for bidding. This requirement presupposes that the offeror possesses all necessary authority and licenses, including a Construction Business License in Japan, as applicable. In response to this Sources Sought Notice, the Government requests that interested businesses capable of fully supporting this requirement furnish the following information: Name of the firm, Point of Contact (POC), phone number, email address, and CAGE code. Additionally, please indicate whether your company intends to participate in the bidding process for this contract. The U.S. Government will not pay for any information or administrative costs incurred in response to this notice. Submittals will not be returned to the responder. A determination not to compete this requirement, based upon responses to this notice, is solely within the discretion of the Government. However, if a competitive solicitation is released, it will be synopsized on SAM.gov. It is the responsibility of potential offerors to monitor SAM.gov for additional information pertaining to this requirement. Interested parties should provide their written responses via email to Ms. Yuki Kobayashi at yuki.kobayashi.jp@us.af.mil and Ms. Namiko Kaneko at namiko.kaneko.1.jp@us.af.mil. All submissions must be received no later than 20 Nov 2026, 1600 hours, Japan Standard Time (JST).
42%
Market Research11/20/2026
JEFF Cooling Tower Replacement Title III
42%
AwardedOpen

Additional Details

Solicitation Number

NB195000-17-02086A

Archive Date

Jun 16, 2017