GovChime
Notice ID: 197f5eb6b3a3f6eb744c5f85e33a5df1Award NoticeAwarded

Painting Services

Awarded on September 20, 2008. Full description on SAM.gov.

Awarded tounder DG133E-08-SE-5100 (source: SAM.gov award notice)• $33.8K

Overview

Posted
September 25, 2008
Notice type
Award Notice
NAICS
238320: Painting and Wall Covering Contractors
Agency
Department of CommerceNATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

Notice details

Office
DEPT OF COMMERCE NOAA
Place of performance
NOAA/NESDIS/NPOESS-IPO Centre Building, 9th & 10th Floors 8455 Colesville Road, SILVER SPRING, 20910
PSC
R: SUPPORT SVCS (PROF, ADMIN, MGMT)
Last updated
Sep 25, 2026
Award date
Sep 20, 2008
Award amount (SAM.gov award notice)
$33.8K

Identifiers

Solicitation number
NEEL0000-8-44641
Notice ID
197f5eb6b3a3f6eb744c5f85e33a5df1
Award number (PIID)
DG133E-08-SE-5100

Description

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with FAR Part 12 and 13 and in the format in subpart 12.6 of the FAR (Federal Acquisition Regulation) as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The Solicitation Number is NEEL0000-8-44641. This solicitation is issued as a Request for Quote. (iii) Solicitation documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular Number 2005-26 dated June 12, 2008. (iv) This is a 100% small business set-aside. The associated NAICS Code is 238320 (Painting Contractors). The small business size standard is $14M based on the SBA Table of Size Standards dated August 22, 2008. All firms responding must be registered with the Central Contractor Registration (CCR). The Small Business Competitiveness Demonstration Program is not applicable. (v) Contract Line Item Number (CLIN): CLIN 0001 Painting Services Qty: 1 U/I: EA There are no options on this firm fixed price order to be issued under Simplified Acquisition Procedures. (vi) The National Oceanic and Atmospheric Administration is soliciting for painting services for the 9th and 14th Floors of the Centre Bldg, 8455 Colesville Road, Silver Spring, MD 20910. Existing wallpaper is to be removed and properly disposed and walls are to prepared and/or repaired (cracks, holes, stains, marks, nail pops, etc.) prior to painting. (vii) Performance of subject requirements shall commence on or about September 25, 2008 at NOAA/NESDIS/NPOES-IPO, Centre Bldg, 8455 Colesville Road, Silver Spring, MD 20910. A kick-off meeting shall be held on Monday, September 22, 2008 at 9:00 am Eastern Standard Time at the above address on the 8th Floor, Management Operations Conference Room. Acceptance of subject services shall be at the above address. (viii) The provisions at FAR Clause 52.212-1, Instruction to Offerors - Commercial, applies to this acquisition. (ix) The provisions at FAR Clause 52.212-2, Evaluation - Commercial, does not apply to this acquisition. (x) Offerors are required to submit a completed copy of the provisions at FAR Clause 52.212-3, Offeror Representations and Certifications - Commercial Items with their offer. Failure to provide a copy of the Reps and Certs will disqualify the offer submitted. (xi) FAR Clause 52.212-4, Contract Terms and Conditions - Commercial Items, applies to this acquisition with no addenda. (xii) FAR Clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items, applies to this solicitation. Specifically, the following clauses cited are applicable to this solicitation: FAR 52.219-6; FAR 52.219-28; FAR 52.222-3; FAR 52.222-19; FAR 52.222-21; FAR 52.222-26; FAR 52.222-36; FAR 52.222-50; FAR 52.225-13 and FAR 52.232-33. The following FAR clauses are incorporated by reference; FAR 52.204-7, Central Contractor Registration; FAR 52.247-34. FOB; Destination (NOAA/NESDIS/NPOESS-IPO, Centre Bldg, 8455 Colesville Road, Silver Spring, MD 20910). The following local clauses apply to this solicitation: CAR 1352.216-70 Contract Type; CAR 1352.211-70 Statement of Work Specifications; CAR 1352.237-74 Foreign National Visitor and Guest Access to Departmental Resources; CAR 1352.246-70 Inspection and Acceptance; CAR 1352.252-71 Regulatory Notice. (xiii) No additional terms or conditions. (xiv) A Defense Priorities and Allocations System (DPAS) code is not assigned. (xv) Offers are due on September 16, 2008 at 1:00 pm (Eastern Standard Time). Offers are to be sent via e-mail to lester.a.pagano@noaa.gov or by FedEx to the following address: Mr. Lester A. Pagano, Jr Contracting Officer NOAA/NESDIS/NPOESS-IPO Centre Building, 10th Floor, Room 10-004 8455 Colesville Road Silver Spring, MD 20910 Offerors are responsible for ensuring the timely arrival of offers prior to the closing time and date mentioned above. (xvi) The point of contact is Lester A. Pagano, Jr, Contracting Officer. For information concerning this combined synopsis, requests must be received in writing by e-mail. Contact e-mail address is lester.a.pagano@noaa.gov. The phone number is 301-713-4795. Questions will be entertained only by e-mail correspondence.

Full description on SAM.gov

Award Overview

Award Number

DG133E-08-SE-5100

Award Amount (SAM.gov award notice)

$33.8K

Award Date

Sep 20, 2008

Awardee

Original Solicitation

Notice ID: 197f5eb6b3a3f6eb744c5f85e33a5df1

Posted Date: Sep 25, 2008

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Lester A Pagano
Contracting Officer
Fax: 301-427-0021

Documents

No documents available.

Lifecycle

Solicitation:NEEL0000-8-44641
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. 2×
    Combined SynopsisSep 5, 2008

    Painting Services

    Notice d846b687388d516de4e592f57a272fd8 on SAM.gov

  2. AwardedCurrentSep 25, 2008

    Painting Services

    Notice 197f5eb6b3a3f6eb744c5f85e33a5df1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Point of Contact. Jenna Taulman at jenna.taulman@noaa.gov Set-asides. It is anticipated that a small business set-aside will apply to any resultant solicitation(s). 238320 - Z2JZ (i) Codes for services or supplies. (i) window film installation at the National Weather Service Weather Forecast Office (WFO) located in Coraopolis, PA. The scope of service includes (a) installation of type VS20 film on nineteen (19) rectangular glass panels, two triangle glass panels, and one door; (b) re-paint existing interior painted walls and doors at the Weather Forecast Office (WFO) located in Moon Township, PA; (ii) re-paint the interior of the building. The maintenance work includes: preparing surfaces for the re-coating of primer and/or paint on walls, and metal surfaces. These work areas include offices, rooms, and corridors. Upper Level: Approximately thirteen (13) work areas. The approximate combined wall area is 4,600 sq ft. Approximately ten (10) metal doors with jambs (both sides) on this level will require painting. Additional door jambs with wood doors will require paint on the jambs only. Lower Level: Approximately six (6) work areas. The approximate combined wall area is 2,400 sq ft. Approximately 280 sq ft. will require the removal of carpet wall covering. These areas will involve removal of glue, full spackle, sand and surface preparation to the area, then a final dust wipe down prior to paint. Approximately two (2) metal doors with jambs (both sides) will require painting on this level. Additional door jambs with wood doors will require paint on the jambs only; (iii) Approximately six hundred (600) sq ft of sound barrier wall requires re-habilitation which includes surface preparation, removal / replacement of the top course with new block, and re-painting of both sides of the structure. Approximate wall dimensions: 27 ft overall length,10 ft height. (ii) The proposed contract action has an estimated magnitude between $25,000 - $40,000 and simplified procedures in accordance with RFO 12.201-1 will be utilized for the commercial solicitation and award; (iii) The article must be manufactured in the United States; and except for an end product that consists wholly or predominantly of iron or steel or a combination of both, the cost of domestic components must exceed 60 percent of the cost of all the components, except that the percentage is 65 percent for items delivered in calendar years 2024 through 2028; one or more of the items under this acquisition is subject to Free Trade Agreements.; (iv) technical specifications and a statement of work can be requested from Jenna Taulman at jenna.taulman@noaa.gov . Please note that a response may not be provided until around 11/09/2026; (v) a small business set-aside solicitation is expected; the resultant award is subject to all RFO FAR Part 12 and 36 clauses applicable to contracts under the simplified acquisition threshold; (vi) all responsible sources may submit a quotation which will be considered by the agency; (vii) noncompetitive contract actions/sole source - N/A; (viii) Qualification requirements - N/A; – end of Presolicitation Notice–
-Pre-Solicitation11/13/2026
Questions and Answers (84) Solicitation 36C24526Q0637 Set-aside status. The Amendment #3 notice on SAM.gov shows the Original Set Aside field as blank. The SF 1449 (Block 10) and VAAR 852.219-73 in the solicitation reflect a total set-aside for certified SDVOSBs. Please confirm whether this acquisition remains a 100% SDVOSB set-aside after Amendment #3. Correct this BPA/RFQ remains a 100% SDVOSB set-aside Evaluation basis. For the LPTA evaluation, will the Government compare total price for the base year only, or the total of the base year plus all four option years? Will option-year pricing be evaluated? total of the base year plus all four option years Quantities by site. Are the Section B.10 quantities the combined total for Baltimore VAMC, Loch Raven CBOC, and Perry Point VAMC? Please provide the breakdown by site, building, floor and flooring type, and confirm whether each quantity is an annual estimate for each contract year. This is an annual estimate for all sites. Line item reconciliation. Several lines appear not to align, and we would like to price them correctly: Tarkett Sheet Vinyl material is listed at 3,000 SY (27,000 SF), while Installation of Sheet Vinyl is listed at 9,000 SF. Which quantity is correct? SF should be SY. The SY is correct Is the 2,000 SY Tarkett Adapt (Woodlot Holly Oak) material line the material for the 2,000 SY Installation of Carpet Tile line? The carpet tile should be a separate line item. General Demolition, Floor Leveling and Smoothing and Furniture Lift (occupied spaces) are each listed at 30,778 SY. Does this quantity cover the combined area of the LVT and sheet vinyl installations? What is the Government's expectation for demolition and leveling on the Epoxy Flooring (15,000 SF) and Carpet Tile areas? Yes--This combines both areas. The expectation for epoxy flooring installation will not differ from LVT. The recommended application/method is to be specified by the contractor as the SME (Subject matter expert). Materials and selections. Please confirm that the contractor furnishes all materials listed in B.10. Colors and styles are shown as TBD. When will selections be provided, and should offerors price a stated base or average cost? Will substitutions of equivalent products be considered? There are no substitutions Existing floor condition. Has asbestos or lead testing been completed on the existing flooring and adhesives at all three sites? If material is found, who is responsible for abatement and for the related schedule impact? Are moisture and alkalinity test results available? Asbestos and lead testing is completed at all sites. VA ensures the proper personnel are in place for abatement. BPA terms, schedule and labor Order limits. Section B.9 leaves the per-order limit and the ceiling amount blank. Please provide both, any minimum guarantee, the expected number and typical size of orders per year, and the typical lead time between an order and the start of work. The Government estimates, but does not guarantee, that individual BPA Orders placed against this Agreement may reach $1,500,000.00/per Order. This Order Limit may be increased by mutual agreement of the parties as necessary, in whole or part. The authorized Ceiling Limit of the Agreement is set at $6,000,000.00 over the period covered by the Agreement; this ceiling is also not a guarantee. The Ceiling Limit may also be raised in association with order Limit increases or other conditions which, by mutual agreement of the parties, maybe considered necessary. Authorization for individual Task Orders above the stated Task Order and/or Ceiling Limits must be coordinated through the Contracting Officer before larger valued orders can be issued and prior to commencement of work. All unauthorized work, regardless of amount, will be processed through the ratification process. Period of performance. Section B.10 shows a base period of 09-01-2026 through 08-31-2027, and B.2 shows the BPA dates as TBD. Please confirm the revised base and option period dates, given the November 18 quote date. The Installation of Sheet Vinyl line shows a POP end date of 08-16-2027 while other lines show 08-31-2027. Please confirm which date applies. Time frame of contract award Base Year December 1, 2026 to November 30, 2027 plus 4 option renewal years Wage determination. The attached wage determination is dated 7-22-2026 and is titled Baltimore. Does it apply to all three sites, including Perry Point (Cecil County)? Please confirm whether it is a Service Contract Labor Standards or a Davis-Bacon determination. Wage Determination for Baltimore and Cecil County are attached Service Contract Labor Standards Working in occupied facilities. Please describe the requirements for working hours, after-hours and weekend work, infection control (ICRA) and phasing, badging and escorts, material staging and storage areas, and loading and elevator access at each site. Who moves furniture and equipment that is not covered by the Furniture Lift line? The work hours are reflected in the RFQ. The VA observes all national holidays. After work hours are on a case by case and determined by the needs of the service. CLINs x007 "Epoxy Flooring; Color TBD" (B.10): is there a required epoxy system type (e.g., self-leveling, broadcast/slurry, mortar, or flake), minimum thickness, and performance criteria? This will be determined prior to the project of any installations-as epoxy will not be a regular material used. For epoxy areas, who is responsible for concrete moisture/RH and pH testing (ASTM F2170 / F1869)? If readings exceed the system's limits, is moisture mitigation priced under CLIN x009 or handled by task-order modification? handled by task-order modification VAAR 852.219-75 (pp. 55-56) has no box checked. Which limitation on subcontracting applies: services (50%) or special trade construction (75%)? Please confirm that the cost of materials is excluded. Also, will 852.219-73(e) be measured by base/option period or per order? Services (50%) 852.219-73(e) will be measured by base/option period. 14. Does a Buy American requirement (FAR 52.225-1 or 52.225-9) apply to materials? The SF1449 says 52.212-5 is attached, but its text isn't in the posted RFQ. 52.225-1 or 52.225-9 is not listed on the RFQ 52.212-5 is not checked on the SF1449 therefore text would not be posted 15. E.3 (p.61) says award will be LPTA, but E.8 (p.65) says best value with technical, past performance, and price. Which governs? Also, what are the per-order limit and BPA ceiling in B.9, which are left blank (p.8)? Refer to question #7 Order Limits 16. Carpet tile. Please provide the manufacturer, collection and product name, style number, color name and number, tile dimensions, fiber and construction, backing, installation pattern, and approved adhesive. Please confirm whether carpet material is contractor-furnished and identify the applicable material supply line. Carpet tile Spec: Tarkett Carpet Tile Hidden Arbor and Sweater Knit 24x24 color TBD 17. LVT. Please provide the complete specification for the listed Tarkett Contour Series 6 by 48 inch LVT, including exact collection and product number, color name and number, overall thickness, wear-layer thickness, backing, finish, installation method, and approved adhesive. Please clarify how the separately listed Tarkett Adapt, Woodlot Holly Oak relates to this scope. This will be determined prior to installation. 18. Sheet vinyl. Please provide the manufacturer, collection and product name, product number, color name and number, homogeneous or heterogeneous construction, thickness, backing, roll width, finish, and approved adhesive. Please include the compatible weld rod, heat-welding requirements, flash-cove height, cove former, cap, and corner details. Please provide product data sheets and identify any different product or color selections by facility or area. Sheet vinyl spec: Tarkett IQ Optima Sheet Goods 19. Please provide the required wall-base and transition specifications, including manufacturer, product, material, dimensions, profile, and color or finish. Please identify the required transitions between new flooring, existing finishes, and different flooring types. Contractor will determine optimal wall transitions based on the project requirement, as the SME (subject matter expert). 21. During the walkthroughs, we understood that all furniture moving would be performed in-house by the VA. Please confirm that the VA will clear furniture, contents, and equipment before work begins and return them after the required curing period, including any necessary disconnects and reconnects. Please clarify whether Item 0012, Furniture Lift, remains applicable. 22. Please confirm that LVT and sheet-vinyl work areas will be fully cleared and remain clear through installation and required curing, rather than requiring piecemeal installation around furniture. LVT and sheet-vinyl work areas will be fully cleared and remain clear through installation 23. Please confirm whether the VA will provide dumpsters and pay disposal charges at each facility. Please identify the designated disposal locations and confirm whether the contractor is responsible for transporting demolition debris to onsite containers or for offsite hauling and disposal as well. The VA has dumpsters for disposal at each site. 24. Please confirm whether temporary dust partitions, negative-air equipment, and associated monitoring will be provided by the VA or contractor. Please provide the required barrier-system specifications and applicable infection-control requirements, including responsibility for setup, maintenance, relocation, removal, and inspection. Contractor is responsible for providing all ICRA/PICRA materials. To include materials required for wall barriers when required (Level 3 or 4). Contractors are expected to provide materials and construct the wall barriers required. Negative air pressure machine will be provided by the VA if needed. 25. Please identify the VA representative responsible for coordinating room availability, occupant relocation, access, and infection-control approvals. Please confirm whether each released area will remain continuously available through demolition, preparation, installation, and required curing. Please identify any daily reopening requirements and who authorizes reopening. The COR or Interior Designer will provide all necessary coordination for all projects. Contractor is not responsible for the opening of any room. 26. Please reconcile the listed 7:00 a.m. and 7:30 a.m. start times and confirm normal working hours. Please identify any locations or activities that must be performed during evenings, nights, weekends, or holidays. Any work after hours will be coordinated prior to any installations. This will be determined by the needs of the applicable service. 27. Reference: B.11 Scope, p. 26; B.5(c), p. 6. The SOW requires a project manager or project designer and an installation foreman onsite. For each task order, please identify the required supervisory positions, minimum qualifications, approval submittals, and hours of physical presence. Must a superintendent or project manager be a direct employee of the prime, and must that person remain onsite whenever subcontractors work? Each task order will require a designer or project manager to monitor progress and ensure standards are in place. They will be a minimum of COR Level 1 certified. They are required to be onsite at time of the installation. There is no physical amount of time for this requirement, as each project varies. A qualified installation foreman may of course also be present but the VA will require a designer/COR level 1 employee to monitor project. No-- Where projects possibly run concurrently, each project will have it s own designer/project manager. 28. Reference: B.11 Safety and Security Precautions and Personnel Qualifications, p. 28; B.6(a), p. 6. Please identify whether each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative beyond the onsite personnel identified on page 26. Specify prime-employment requirements, certifications, experience, full-time coverage, and whether one qualified person may combine these roles with superintendent or foreman duties. Each task order will require it s own safety personnel, each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative based on the needs of the project. Each project may have it s own requirements (i.e patient care areas etc.) 29. Identify the applicable safety/QC specifications, any EM 385-1-1 requirements and edition, required plans and daily reports, and whether staffing varies with task-order size, location, work shift, or hazard level. Contractors are expected to comply with OSHA standards. No-the Interior Design staff does not vary based on task orders. 30. Reference: B.11 Objective and Scope, pp. 25-26. Before pricing and issuance of each task order, who will prepare and approve the Infection Control Risk Assessment (ICRA), any Preconstruction Risk Assessment (PCRA), and the infection-control permit: VA Infection Prevention, the COR, the contractor, or another party? Please provide the applicable forms, assessment matrix, approving officials, and review time. Confirm that the required class, work-area limits, patient risk group, and controls will be identified in the task-order solicitation before its price and schedule are agreed, including orders at Baltimore, Loch Raven, and Perry Point Interior Design staff will prepare the ICRA & PCRA. ID will coordinate with Infection control for approval of the ICRA & PCRA prior to the start of any project. All ICRA/PCRA requirements are expected to be performed by the contractor. Contractor will be expected to provide necessary materials and the construction of any wall barriers required by ICRA/PCRA. 31. Reference: Site-visit discussion reported by J&G; B.11 Scope, p. 26; Unpacking/Uncrating, p. 27. Our understanding from the site visit is that the Government will remove all furniture before the flooring contractor begins each task order. Please confirm this applies to every order at all three campuses and that the flooring contractor is not required to lift, move, disassemble, store, protect in storage, or reinstall furniture. Clarify responsibility for workstations, beds, file cabinets, appliances, medical equipment, contents, and associated IT/electrical/plumbing disconnections and reconnections. Interior Design will remove all furniture prior to any installation. However, there may be an instant where some furniture may need to be moved/prior. Contractor will not be responsible for the removal of any medical equipment. Equipment or medical items will be removed by VA personnel/Biomed. 32. Confirm that the Government will deliver cleared work areas and keep them clear through installation and required curing and identify the procedure if an area is not ready as scheduled. ID will ensure areas are cleared and remain clear through installation. 33. Reference: B.10, CLINs 0008 and 0012 and corresponding option CLINs, pp. 10-23; E.3, pp. 61-62.CLIN 0012 includes 30,778 SY of Furniture Lift in occupied spaces, repeated in CLINs 1012, 2012,3012, and 4012. This appears inconsistent with the site-visit direction that the Government will remove furniture. Will these CLINs be deleted from the schedule and evaluated price? If retained, define the exact exceptional scope and when it may be ordered, and issue uniform instructions on whether bidders must quote a rate, enter zero, or use another designation. Please confirm that pricing these lines does not place furniture moving in the flooring installation rates or authorize it without an applicable order. ID will ensure furniture is removed from the space prior to installation. However, if there is an instance where furniture must be removed by the contractor-it will be priced accordingly. 34. Reference: B.11 Scope, p. 26; Debris, p. 27; B.10, CLIN 0009 and option equivalents. The SOW assigns removal and disposal to the contractor but directs debris to VA-provided dumpsters and a scrap cage. For each campus, confirm whether the Government provides containers, hauling, and final disposal at no charge for all nonhazardous carpet, carpet tile, pad, LVT/VCT, sheet flooring, epoxy debris, cove base, adhesive/mastic scrapings, underlayment, and floor-preparation waste. Identify prohibited materials, volume or weight limits, and any offsite disposal the contractor must price. Please state whether disposal labor is paid through the demolition CLIN or installation rates, so it is included once, and define payment for required contractor hauling and tipping fees. The VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard. 35. Reference: B.11 Debris, p. 27; Safety and Security Precautions, p. 28. Please identify the approved debris routes, loading points, dumpster/scrap-cage locations, and cardboard recycling locations at each campus. Specify covered or sealed carts, bagging, elevator restrictions, daily removal, cleanup, and container exchange requirements. The VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard. 36. Are carpet take-back, flooring recycling, minimum diversion percentages, waste plans, weight tickets, or disposal receipts required? No, they are not required 37. Identify responsibility for overflow or un37available VA containers and any required contractor roll-off permits or containment. Where hazardous or contaminated waste is expressly included in an order, provide separate segregation, manifest, transporter, disposal-facility, and generator-signature responsibilities; confirm such waste may not enter the ordinary VA dumpsters. There are no hazardous materials areas specified for flooring installations. 38. Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28. For each campus and task order, please identify required contractor site facilities, including a field Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28. For each campus and task order, please identify required contractor site facilities, including a field office or trailer, superintendent/QC workspace, meeting area, storage container, portable toilets, handwashing facilities, and temporary lighting or ventilation. No. The VA will not provide storage containers, portable toilets, and temporary lighting or ventilation. Handwashing facilities are located in the restrooms in all facilities, all sites, all campuses. No temporary facilities will be provided. 39. Reference: B.11 Scope, p. 26; Equipment and Tools and Work Areas, p. 28; Installation, p. 29. The SOW requires contractor storage, directs installation from shipments and warehouse stock, and requires removal of tools when the contractor leaves. Please identify available secure, conditioned storage and acclimation areas at each campus, including space for flooring, adhesives, and hazardous products. May approved tools, containment equipment, and materials remain secured onsite overnight or between phases? There will be no storage provided for contractors. 40. If daily removal is required, confirm the limits and available loading access. Identify responsibility for material receipt, inventory, room tagging, double handling, damaged Government stock, and maintaining manufacturer-required temperature and humidity during storage, acclimation, installation, and cure. Storage for materials will not be provided-other than the immediate area within the project area. This will be included in the scope of the project. 41. Reference: B.11, pp. 25-30; Baltimore floor plans and campus visitor maps; Amendment #3 site-visit notice. The furnished maps identify visitor services and campus locations rather than dimensioned flooring work limits. Before each task-order quote, will the Government provide marked plans identifying buildings, rooms, areas, existing and new flooring, demolition limits, and phasing? Yes prior to the start of any project, the VA/COR will provide building location, room information and floor plans with applicable dimensions to reference. 42. Confirm field measurement access before pricing. Identify contractor entrances, loading docks, freight elevators and reservations, floor-load limits, haul distances, escort requirements, and delivery/parking arrangements at all three campuses. Yes measurements will be provided to the contractor prior to the start of each project. 43. Clarify the Loch Raven buildings covered by the BPA, including the Alameda clinic versus the broader Loch Raven campus, and any access restrictions caused by ongoing construction. All buildings located on the Loch Raven campus are included in the BPA. Ongoing construction will be assessed for access, determined by the current activities. 44. Reference: B.11 Scope, p. 26; B.10, pp. 9-24. The SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and 120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. Correct the figure should reflect 800,000 SY instead of SF. This a rough estimate, of the exact amount of flooring that needs changed it will change over time. 45. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping supply-only quantities, and confirm the quantities controlling price evaluation and ordering. Reference: B.11 Scope, p. 26; B.10, pp. 9-24. The 3.5 total is an educated estimate. As we will now know exactly how much flooring we will utilize each year. 46. The SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. Separately, the annual scheduled flooring product/system quantities total 310,000 SF if CLINs 0001, 0003, 0006, and 0007 are distinct. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping or supply-only quantities and confirm the quantities controlling price evaluation and ordering. The total 3.5 is over the base plus 4 years. It is an estimate of 700k for each year. As we do not know exactly how much we will use each year funds or materials. 47. Reference: B.10, CLINs 0003 and 0013 and corresponding option CLINs, pp. 9-23. Sheet-vinyl material is listed at 3,000 SF, equivalent to 27,000 SF, while sheet-vinyl installation is listed at 9,000 SF in each year. Please confirm whether material quantity should be 1,000 SY, and the installation quantity should be 27,000 SF. Correct-the material quantity should be 1,000 SY, installation quantity should be 27,000 SF 48. Reference: B.10, CLIN 0009 and option equivalents, pp. 10-23; B.11 Scope, p. 26. CLIN 0009 includes 30,778 SY, equivalent to 277,002 SF, for General Demolition, Floor Leveling and Smoothing. Please identify the flooring types, number of existing layers, adhesive removal method, and substrate conditions included in this rate. Is it payable only where demolition is ordered,separately from installation, including Government-furnished material installations? Each flooring type may be different. Most areas are being replaced with carpet/tiles The spaces can include and are not limited to cove-base removal, bonded epoxy removal, mechanical grinding, and underlayment removal are included or separately priced. Underlayment are line items and priced within the task order. 49. Reference: B.10, CLINs 0001-0015 and option equivalents, pp. 9-24; B.11 Scope, p. 26. Please provide a CLIN inclusion matrix defining material-only, labor-only, and furnish-and-install items. In particular, identify the material paired with carpet installation 0008; confirm the relationship of LVT 0006 to installation 0011 and sheet vinyl 0003 to installation 0013; and define whether epoxy 0007 is a complete installed system. Identify where freight, adhesive, fasteners, demolition/disposal, skim coat, protection, transitions, supervision, and final cleaning belong. The SOW says pricing includes demolition and preparation, while CLIN 0009 prices them separately; please establish a consistent method that avoids either duplication or unpaid scope. Each task order will price materials required prior to the installation. This will be determined by the scope each project. 50. Reference: B.6, pp. 6-7; B.9, p. 8; B.10, pp. 9-24; B.11 Ordering Procedures, p. 27. Orders may vary from small to large, but the schedule has no separate mobilization, supervision, ICRA, temporary-facility, testing, or hazardous-material line items. Each project has its own needs and is specific to requirements and will be priced accordingly i.e ICRA requirements. The VA will not provide any temporary facility or storage. 51. Please identify any minimum task order size or charge and the expected order-size range and frequency. No--there is no minimum task order size. Reference: B.10, pp. 9-24; B.11 Ordering Procedures and Performance Monitoring, pp. 27-29.Please define the measurement and payment basis for each unit. Are flooring quantities net installed area, gross room area, or purchased material including cutting waste, pattern match, attic stock, and full-carton/roll rounding? 52. It is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided. The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals. 53. Reference: B.10, CLINs 0001, 0003, 0006, 0008 and 0011, pp. 9-11; B.11 Scope, p. 26. Please provide complete specifications and current product identifiers for Tarkett Adapt/Woodlot Holly Oak, sheet vinyl, and Contour 6-by-48-inch LVT. Confirm the product category paired with carpet installation and whether VCT, although named in installation CLIN 0011, is Governmentfurnished or requires another supply item. Specify thickness, wear layer/backing, dimensions, performance and fire/smoke criteria, slip resistance, chemical resistance, approved adhesives, colors,and required installer qualifications. Are named products mandatory or are approved equals permitted? All Tarkett materials and specs have been provided. There are no substitutions for Tarkett materials. 54. Reference: B.10, CLIN 0007 and option equivalents, pp. 10-22; B.11 Scope, p. 26. For the 15,000 SF annual epoxy item, please identify the required system, manufacturer or performance basis, total thickness, primer, body coats, aggregate, topcoat, finish, and slip/chemicalresistance criteria. The epoxy will be used seldom-therefore it will be specified/determined upon each task order. When used, it will include removal, repairs and all necessary actions to install. 55. Reference: B.10, CLINs 0002, 0004, 0005 and option equivalents, pp. 9-23. Please confirm that one CO for each adhesive means one complete four-gallon pail, and define one EA of weld rod by diameter and length per spool. Verify the annual quantities of 18 C-EX pails, 195 Roll Smart pails, and 15 weld-rod units against the corrected product quantities and manufacturer coverage, including which adhesive serves each flooring product and where LVT adhesive is priced. Are these quantities fixed evaluation estimates, actual consumable quantities, or allowances? It is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided. The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals. 56. Identify whether residual adhesive/rod remains Government property and how additional manufacturer-required consumption is authorized and paid. Any unused materials will be government property. Any unusable material may be disposed of. 57. transitions without a separate CLIN. For 1,600 FT of heat welding and 50 FT of Flash Cove and Corners, define seam requirements, cove height, cove former, cap strip, and inside/outside corner details. Should corners be measured individually rather than by FT, and are weld rod and flash-cove accessories furnished under these rates or other CLINs? Measurements and methods are to be determined by the contractor for efficiency of materials and labor. 58. Reference: B.11 Scope, p. 26; B.10, CLIN 0009 and option equivalents. Please define the quantitative limits of minor preparation/skim coat included in the rates, including maximum depth, average thickness, coverage percentage, flatness tolerance, and required adhesiveresidue removal. The VA cannot determine such rare instances pre-maturely. 59. Distinguish routine patching from self-leveling underlayment, deep fills, failed substrate removal, structural repairs, crack repair, joint treatment, and replacement of deteriorated wood or gypsum underlayment. Measurements and methods are to be determined by the contractor for efficiency of materials and labor. 60. Will each task order identify known repairs before pricing? Yes, each task order will identify known repairs before pricing 61. Establish separate measurable items or another approved pricing mechanism for concealed deterioration or preparation exceeding the defined limits after demolition. This will be determined before installation and will be included in pricing. 62. Reference: B.11 Objective and Scope, pp. 25-26; Installation, p. 29. Who performs and pays for substrate moisture, relative-humidity, pH, adhesion, and other manufacturer-required testing on each task order, and what standards, frequency, and acceptance limits apply? If spaces are identified with moisture issues, the VA will identify these instances prior if needed and make determining factors to rectify prior to installation. 63. Reference: B.11 Scope, p. 26; Installation, p. 29; C.1(b), p. 31. Please identify required product data, room layouts, samples, mockups, installer credentials, shop drawings, and approval periods for each task order. For flooring supplied from Government warehouse stock, identify who verifies condition, quantity, compatibility, batch/shade, and warranty eligibility Specify required contractor workmanship and manufacturer warranties, their duration and commencement, and responsibility for defects in Government-furnished products or preexisting substrate conditions. Identify whether attic stock, maintenance instructions, product/lot records, manufacturer inspections, or warranty registrations are required and the CLIN covering these deliverables. Manufacture warranties will apply to all installations. 64. Reference: B.11, pp. 25-29; furnished campus maps and Baltimore floor plans. Before each task order is priced, will the Government define the number and size of phases, room vacancy windows, sequencing, and maximum area that may remain out of service? Yes, it will be defined 65. Please identify any daily requirement to reopen rooms or corridors, remove/rebuild containment, install temporary walking surfaces, or protect uncured flooring. Confirm responsibility for patient/staff relocation,clinical shutdowns, alternate egress, fire-alarm/HVAC coordination, permits, and after-hours escorts. Re-opening of rooms is the responsibility of VA personnel and the subject matter experts i.e the COR, Infection control, safety etc. 66. Establish the process for Government-directed resequencing and additional mobilizations when rooms cannot be released together or operations interrupt the approved installation/cure sequence. VA/COR will determine. 67. Reference: B.7, p. 7; B.11 Contractor Responsibilities, p. 27; Installation and Overtime, pp. 29-30. The SOW gives a 7:30 a.m. start on page 27 and a 7:00 a.m. installation start on page 29, with occasional evening/weekend work. Please confirm the normal shift, billable/productive hours, delivery windows, and the portion of work bidders must assume occurs after hours. Regular Hours are defined in the RFQ. After hours will be rare and determined based on the service needs. Quoted prior to installation. 68. How are premium shifts, overtime, weekend/holiday work, and repeated short shifts priced when the schedule has no premiumrate items? Clarify the daily/seventh-day overtime wording on page 30 and the required written approval authority, including reconciliation of service-chief approval with CO authorization for additional price or holiday work. COR will coordinate work overtime with service chief prior to installation. 69. Clarify how a task order issued near year-end is completed and which rates apply when performance spans an option boundary or a Government-directed delay Issued by CO Firm Fixed Price 70. Reference: B.9 Authorized Limits, p. 8; B.11, pp. 25-27. The BPA order limit and overall ceiling are blank, and the SOW anticipates emergent failures. Please provide the intended per-order limit, BPA ceiling, anticipated annual spending/order count, typical order size, and any minimum purchase commitment. What maximum number of simultaneous task orders, sites, and shifts must the contractor support? Define routine and emergency response times, estimating turnaround, start/completion requirements, and whether emergency standby or priority service must be included in standard rates. Clarify whether the listed annual quantities are evaluation estimates only and whether no minimum work volume is guaranteed. Estimates only. The VA cannot determine such rare occurrences pre-maturely. 71. Reference: C.2, pp. 37-38; D.1, p. 58; attached Wage Determination 2015-4265, Revision 33, pp. 1-7.The RFQ incorporates Service Contract Labor Standards and attaches WD 2015-4265, Revision 33, dated May 13, 2026. Please confirm the applicable labor-standard treatment for flooring demolition, preparation, replacement, and installation, including any construction wage determination required for particular orders. Identify the governing determination and revision for each campus; the attached locality list does not identify Cecil County for Perry Point. Clarify required classifications for resilient flooring, carpet, epoxy/coating, demolition/preparation, and hazardous-material work; the conformance procedure for unlisted work; applicable fringe benefits; and required payroll reporting.Please issue all governing determinations before final pricing. Please refer to the Wage Determination for Baltimore and Cecil County 72. Bidders must quote the base and four option years. Please clarify whether each year has independently proposed fixed unit rates and how incorporated wage/fringe adjustment provisions will be applied without duplicating escalation already priced. Identify the effective wage-determination revision for each period, required supporting documentation, notice deadlines, and treatment of orders spanning periods. Are any material-price, freight, tariff, or product-discontinuation adjustments permitted during a period, or must those risks be covered entirely in the quoted annual rates? Firm Fixed pricing/ those risks must be covered entirely in the quoted annual rates 73. Define how approved substitute flooring systems are priced if the listed product becomes unavailable during the BPA. No substitutions 74. Reference: C.7-C.8, pp. 40-41; B.9, p. 8. C.8 leaves the general-liability and automobile-liability amounts blank and requires general-liability coverage without an asbestos exclusion before award. Cannot be determined as this will be a case by case occurrence. 75. Please provide all required limits and endorsements and explain whether the asbestos provision applies when testing/abatement is performed by a separate Government contractor. Yes, asbestos provision applies when testing/abatement is performed by a separate Government contractor. 80. Identify any required pollution/professional coverage and whether approved specialty-subcontractor coverage satisfies any portion. Please also confirm whether bid, payment, performance bonds, or other payment protection will be required at BPA award or by individual task order, the applicable order thresholds, and how associated premiums are to be priced. Contractor is expected to maintain all applicable insurance coverages. 81. Confirm whether compliance is measured separately for each task order or over the base and each option period. Compliance is required on all task orders. Does the latest solicitation remain a Service-Disabled Veteran-Owned Small Business set-aside, or has it been revised to unrestricted/full-and-open competition? The public notices and third-party listings appear inconsistent. Correct it is a Service-Disabled Veteran-Owned Small Business set-aside, Were the October 20 21 site visits mandatory for quotation eligibility, or may a contractor that did not attend still quote based on the published documents? One member of the desired contracting bidder must have attended the walk-thru May a prime contractor use qualified flooring subcontractors for portions of the work, provided it quotes and manages all three VA locations and meets all applicable limitations on subcontracting? Contractors must meet all requirements for all three sites.
-Special Notice11/18/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 124PCA27Q0008 is issued as a Request for Quotation (RFQ) for Epoxy Floor Repairs. The project consists of providing all labor and materials to re-coat floors. Floor area to be recoated is approximately 2700 SF with approximately 450 linear feet of cove base. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238330 Flooring Contractors. The small business size standard is $19.0M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
-Combined Synopsis12/01/2026
This is a combined synopsis/solicitation for commercial items, prepared in accordance with the format in subpart 12.6 of the FAR Part 12 - Acquisition of Commercial Products and Commercial Services | Acquisition.GOV and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. Solicitation number 70ZU0327P60316 applies and is used as a Request For Quote (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2024-05, dated 22 May 2024. It is anticipated that a Best Value purchase order shall be awarded as a result of this synopsis/solicitation. All responsible sources may submit a quotation, which if timely received, shall be considered by this agency. Best Value will be evaluated by who can provide the complete requirement, who meets our required time frame and by price. All vendors providing a quotation must either have an active SAM.gov registration or provide proof they have submitted their entity for registration. Payments are NET 30 and will be made in accordance with the FAR 52.232-25 Prompt payment clause 52.232-25 Prompt Payment. | Acquisition.GOV. The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) intends to award a Firm Fixed Price Purchase Order. The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: Vendor Information: Entity Name Entity Unique Entity ID Entity Address Entity POC Entity Phone Number POC Email Address Vendor shall provide: ITEM 1: PANEL, JOINER, 5/8" THK X 48" X 96". ALUMINUM HONEYCOMB 1/4" CELL, PANELS TO BE FACED BOTH SIDES WITH .045" TYPE 6061-T6 ALUMINUM. ADHESIVE IAW MIL-A-25463 CL1 TY1. PANELS TO BE LAMINATED BOTH SIDES WITH ARVEX P DECORATIVE FACING .015: THICK. COLOR TO BE ARVEX FIBERS CASHMERE #71025-153 OR EQUAL. REF NAVSEA 804-4623540 ADVANCED STRUCTURES CORPORATION IS A KNOWN SOURCE. NSN / PART NUMER: 5670 01-LG0-5845 Quantity: 150 EA Unit Price: Line Total: Requested Delivery Date: 11/19/26 Estimated Delivery Date: * Delivery address and terms stated below. * * Access to some drawings may be Export-Controlled and require any recipient to be registered in the Joint Certification Program (JCP) through DLA to receive the drawing. *Any proposed substitutions must be accompanied by a Specification Sheet to undergo evaluation by the requiring officials for compatibility to the Requirement. * ** Total cost shall have delivery and any Freight charges included. ** ** SHIPPING: FOB DESTINATION REQUIRED. ** Preparation For Delivery All material must be shipped to U.S. Coast Guard YARD Baltimore Facilities Management, 2401 Hawkins Point Road, Receiving Room- BLDG 58, Baltimore, MD, 21226 for this Purchase Order. Material must be accompanied by an itemized packaging list securely attached to the outside of the shipment. All packing lists shall cite the Purchase Order Number with the packaging in such a manner to ensure identification of the material provided. Material shall be packed for shipment using Military Packaging, for examples in packaging please reference MIL-STD-2073-1E. Material must be packaged in such a manner as to afford adequate protection to the item against corrosion, deterioration, and physical damage during shipment from the supply course to Surface Forces Logistics Center locations. Packaging shall provide adequate protection for warehouse storage and shipments from the warehouse. All material shall be marked in accordance with MIL-STD-129R and barcoded unless otherwise authorized by the Contracting Officer. All material will have the Purchase Order Number, National Stock Number (if applicable), Vendor name and Part Number clearly marked on the exterior of all material shipped. All Deliveries are to be made Monday through Friday between the hours of 7:00AM to 1:00PM. Invoicing In IPP It is a requirement that all invoicing for Purchase Orders will now be entered and processed through https://www.ipp.gov. All invoices must contain the following information if possible: CG Purchase Order number, vendor’s invoice number, cage number, PO item number, description of supplies or services, unit prices and extended totals Shipping costs will be indicated as a separate line item on the invoice (if applicable). Shipping cost $100 or more must be accompanied by a separate freight invoice when submitting an invoice(s) for payment (if applicable). To submit an invoice, vendor must have access to www.ipp.gov. To gain access please indicate if you don’t have an account so the issuing office can establish one for you. FAR Clauses This order is subject to but is not limited to the following Federal Acquisition Regulations: 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. 52.204-26 Covered Telecommunications Equipment or Services-Representation. 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services. 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services. 52.222-90 Addressing DEI Discrimination by Federal Contractors
-Combined Synopsis11/12/2026
THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION. SEE NEW DUE BY DATE.
-Combined Synopsis09/18/2026

Additional Details

Solicitation Number

NEEL0000-8-44641

Archive Date

Jun 28, 2019

Office Address