Notice ID: 51cb46edf7fdd29d5f80a8159a037deeAward NoticeAwarded
Beryllium Manufactured Components
Awarded on September 27, 2016. Full description on SAM.gov.
Awarded tounder NNC16BA08B (source: SAM.gov award notice)• $950.0K
Overview
- Posted
- September 29, 2016
- Notice type
- Award Notice
- NAICS
- 332313: Plate Work Manufacturing
Notice details
- PSC
- 44: FURNACE/STEAM/DRYING; NUCL REACTOR
- Last updated
- Dec 3, 2025
- Award date
- Sep 27, 2016
- Award amount (SAM.gov award notice)
- $950.0K
Identifiers
- Solicitation number
- nnc16569423q
- Notice ID
- 51cb46edf7fdd29d5f80a8159a037dee
- Award number (PIID)
- NNC16BA08B
Description
NASA and the Department of Energy are preparing a demonstration of system-level technology for a small space nuclear reactor. The ground demonstration at the DOE Nevada Nuclear Security Site will require a neutron reflector made of Beryllium Oxide (BeO). NASA has designed the reflector and provided drawings for the BeO pieces that will be stacked by the demonstration team to make the reflector. The proposer's responsibility is to fabricate and machine the BeO parts to the NASA specifications. NASA GRC received multiple proposals that were technically acceptable. In the RFP, GRC specified that selection would be made based on the cumulative price to purchase all of the components in a single transaction. The cumulative proposal price for Materion is $934,123.35. Because this is a lowest price technically acceptable commercial contract, GRC will award to Materion for having the lowest cumulative total as per the solicitation NNC16569423Q.
Award Overview
Award Number
NNC16BA08B
Award Amount (SAM.gov award notice)
$950.0K
Award Date
Sep 27, 2016
Awardee
Awardee UEI
K4BBAWJU8BN1
Original Solicitation
Notice ID: 51cb46edf7fdd29d5f80a8159a037dee
Posted Date: Sep 29, 2016
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
nnc16569423q- Awarded
This opportunity has been awarded.
- AwardedCurrentSep 29, 2016
Beryllium Manufactured Components
Similar Opportunities
Additional Details
Solicitation Number
nnc16569423q
Archive Date
Oct 12, 2016