GovChime
Notice ID: 5870e8e1d5412743c7b0f0e4c5b2e1a7Combined Synopsis/Solicitation

Sole Source Insulated Pipe Supports

Archived on September 17, 2016. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 PM UTC+02:00
Posted
August 23, 2016
Notice type
Combined Synopsis/Solicitation
NAICS
332919: Other Metal Valve and Pipe Fitting Manufacturing

Notice details

PSC
47: PIPE, TUBING, HOSE, AND FITTINGS
Last updated
Dec 3, 2025

Identifiers

Solicitation number
NNK16599967Q
Notice ID
5870e8e1d5412743c7b0f0e4c5b2e1a7

Description

This combined synopsis/solicitation is a sole source acquisition notice for commercial items (study) prepared in accordance with FAR Subpart 12.6, as supplemented with additional information included in this notice. The NAICS code is 332919, size standard 500 employees. This announcement constitutes the only solicitation; offers are being requested and a written solicitation will not be issued. This is a request for proposal to Piping Technology & Products for procurement of the following: 130 EA of Insulated Pipe Support B7400-1.5SSTx1.5 10 EA of Insulated Pipe Support C4200-1.5SSTX1.5 30 EA of Insulated Pipe Support E1400-1.5SSTX1.5. Competition is impractical for the following reasons: 1. The Insulated pipe supports have been procured in the past for the Mobile Launcher Fluid Distribution System andthe physical and performance characteristics are known. It is desired to keep consistency in the design of the fluid distribution system to reduce the total types of supports used throughout. In order to meet current schedule milestones,the LC39BGCS installation design must be parallel with the support acquisition. The Design cannot progress without knowledge of the physical configuration of the supports and allowable loads. The amount of time it takes to wait for bids and for vendors to create/send drawing submittals will negatively impact the delivery dates of the design. 2. The GCSV schedule is dictating the need for the supports to be delivered for installation within 60 working days. 3. The GCS is in the critical path for testing all the Ground Cooling Subsystems at LC39B. If the GCS installation to the PAD is delayed, the Ground System Development and Operation Program(GSDO)will incur in higher costs related to not launching the first mission EM-1 on time. This purchase will support GSDO EM-1 flight. The Government intends to acquire these items using FAR Part 12 and 13. Interested organizations may submit their capabilities and qualifications to perform the effort in writing to the identified point of contact not later than 3:00 P.M. local time on SEP 2, 2016. Organizations submitting capabilities and qualifications must contain adequate detail and supporting documentation in their submittal. Such capabilities/qualifications will be evaluated solely for the purpose of determining whether to conduct this procurement on a competitive basis. A determination by the Government not to compete this proposed effort on a full and open competition basis, based upon responses to this notice, is solely within the discretion of the government. Oral communications are NOT acceptable in response to this notice. All responsible sources may submit an offer which shall be considered by the agency. An Ombudsman has been appointed. The proposal must contain adequate detail and supporting documentation including commercial labor rates to allow the government to determine the reasonableness of the proposed price. The contractor may provide published catalog price lists or other evidence of pricing of studies conducted. This is a request for Quote (RFQ) subject to the terms and conditions of FAR 52.212-4, Contract Terms and Conditions - Commercial Items, incorporated by reference: FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes and Executive Orders - Commercial Items, attached to this RFQ: and any additional terms and conditions incorporated by reference or included in full text as addenda to 52.212-4. Proposal response is due Sep 2, 2016 or sooner to tyrone.j.frey@nasa.gov.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:NNK16599967Q
  1. Combined Synopsis
  1. Combined SynopsisCurrentAug 23, 2016

    Sole Source Insulated Pipe Supports

    Notice 5870e8e1d5412743c7b0f0e4c5b2e1a7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

NNK16599967Q

Archive Date

Sep 17, 2016