GovChime
Notice ID: 7b974e912edce825358cbcea43a67f18Combined Synopsis/Solicitation

CookTop Controls for CPSC

Archived on July 29, 2010. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
9:00 PM UTC+02:00
Posted
June 24, 2010
Notice type
Combined Synopsis/Solicitation
NAICS
334512: Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use
Agency
General Services AdministrationFEDERAL ACQUISITION SERVICE

Notice details

Office
GSA FAS AAS REGION 11
Place of performance
GSA/NCR/FAS/AAS 301-7th Street, SW - Room 6109, Washington, 20407-0001
PSC
72: HOUSEHOLD/COMMERC FURNISH/APPLIANCE
Last updated
Dec 5, 2025

Identifiers

Solicitation number
NP6100090930
Notice ID
7b974e912edce825358cbcea43a67f18

Description

REQUEST FOR PROPOSAL: PLEASE READ THE REQUEST FOR PROPOSAL AND FOLLOW INSTRUCTIONS. Date: June 23, 2010 Classification Code: 334 - Computer and Electronic Manufacturing; NAICS 334512 Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use. Solicitation Number: NP6100090930. Contracting Office Address: General Services Administration, Federal Acquisition Service, Assisted Acquisition Services, 301 7th Street, SW; Room 6109, Washington, DC 20407-0001 A. DESCRIPTION OF ACTION: This is a combined synopsis/solicitation for the acquisition of contractor services to develop and refine temperature-limiting control technology that will help to reduce the incidence of unattended cooking fires resulting from ignition of food in a cooking vessel on a cooktop/range. This combined synopsis/solicitation is prepared in accordance with the format in Federal Acquisition Regulation (FAR) 12.6 (http://www.arnet.gov/far/current/html/Subpart 12_6.html#wp1088488) in conjunction with the policies and procedures for solicitation, evaluation and award prescribed under FAR Part 13 - Simplified Acquisition Procedures. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-37. This announcement constitutes the only solicitation that will be released. A Proposal from vendors in this business area is being requested and a written solicitation will not be issued. All amendments and any other official communications, if any, from the agency regarding this solicitation will be distributed via https://www.fbo.gov or by a means that provides access to the notice of proposed contract action through the Government-wide point of entry. B. BACKGROUND: From 2002 to 2004, CPSC staff estimates that ignition of food in a cooking vessel while on a cooktop caused an annual average of 31,200 fires, 160 deaths, 1980 injuries, and $274 million in property loss. U.S. Consumer Product Safety Commission (CPSC) staff has conducted or sponsored several studies aimed at reducing fires involving ignition of cooking materials on cooktops. The research demonstrated that food temperatures and pan-bottom temperatures are reliable indicators of pending ignition that can be exploited to initiate automated temperature-limiting controls for the surface elements to prevent food ignition. CPSC staff conducted and sponsored research to develop experimental range control systems for three types of residential cooktops/ranges: electric coil-type, gas, and electric glass/ceramic. Each of these experimental control systems showed promise in preventing cooktop fires. The results of this research were presented to an ANSI/Underwriters Laboratories (UL) 858 Standards Technical Panel (STP) to help establish performance requirements for any range or cooktop to meet to reduce the incidence of cooking fires. An STP working group developed a list of Technical Feasibility Performance Goals (TFPG) to establish a baseline against which candidate systems could be designed and tested. The resultant task order will be awarded to provide engineering services to further develop residential range fire control systems (for electric, gas, electric glass/ceramic thermally-conductive and electric glass/ceramic electromagnetic induction cooktops) and evaluate their performance with respect to the TFPGs. The range control systems being demonstrated shall be applied to production-model residential ranges. C. SCOPE: The General Services Administration (GSA) requires the following services in support of CPSC: CLIN Task /Description Quantity Unit Price TOTAL FIRM FIXED PRICE 0001 Task 1 Task Order Program Management, Project Management and Quality Assurance 1 LOT 0002 Task 2 Design and Construct Prototypes 1 LOT 0002A Task 2 Design and Construct Prototype 1 0002B Task 2 Design and Construct Prototype 2 0002C Task 2 Design and Construct Prototype 3 0002D Task 2 Design and Construct Prototype 4 0003 Task 3 Prepare Test Plans and Test Prototypes 1 LOT 0003A Task 3 Prepare Test Plans and Test Prototype 1 0003B Task 3 Prepare Test Plans and Test Prototype 2 0003C Task 3 Prepare Test Plans and Test Prototype 3 0003D Task 3 Prepare Test Plans and Test Prototype 4 0004 Task 4 Prepare Data Analysis and Testing Results Report 1 LOT 0005 Task 5 Prepare Feasibility Report 1 LOT 0006 Task 6 Prepare Final Report 1 LOT TOTAL NTE Labor CLINS 0001-0006: $___________________ C.1 Travel Long distance travel is not anticipated for this requirement and will not be a cost reimburseable item. Local travel will be required and the cost to the government will not be a reimburseable item. Under the scope of the resultant task order, the contractor shall provide all labor, materials and equipment necessary to develop four prototype range control systems (for electric, gas, electric glass/ceramic thermally-conductive and electric glass/ceramic electromagnetic induction cooktops) to detect pre-ignition conditions as a means of reducing the risk of unattended cooking fires. Local travel to CPSC locations within the Washington DC metropolitan area will be required to support this effort. Long distance travel is not anticipated for completion of any resultant task order requirements. C.2 TASKS TO BE PERFORMED This Statement of Work defines the requirements and acceptable performance levels. Independently, the contractor shall furnish all necessary personnel, materials, services, and facilities to perform the work set forth below, except as provided in Section 8, "Government Furnished Materials." C.2.1 Contractor shall perform the following tasks: C.2.1.1 Task 1: Task Order Program Management, Project Management and Quality Assurance (CLIN 0001) The contractor shall provide all necessary personnel, material, and equipment, administrative, financial, and managerial resources necessary for the support of the resultant task order. The contractor shall participate in a Government-scheduled, Kick-Off Meeting after task order award. Key prime contractor and any shall participate in the Kick-Off Meeting. The purpose of this Kick-Off Meeting is to: (1) aid both the Government and contractor personnel in achieving a clear and mutual understanding of all requirements, and (2) identify and resolve potential problems. The contractor shall be prepared to discuss any issues requiring clarification and gather information necessary for the Project Management. The Government and contractor will schedule the Kick-Off Meeting. It is anticipated that the Kick-Off Meeting will be 1 work day in duration. The contractor shall begin preparation of the work efforts following successful completion of the Kick-Off Meeting. Within a week after task order award (at a mutually agreeable date, time & place), the contractor shall conduct a Kick Off briefing for the Government. The Government does not desire an elaborate orientation briefing nor does it expect the contractor to expend significant resources in preparation for this briefing. Rather, the intent of the briefing is to initiate the communications process between the Government and contractor by introducing key participants and explaining their roles, reviewing communications ground rules, and assuring a common understanding of requirements. C.2.1.1.1 Project Management Plan The contractor shall develop and maintain throughout the task order period of performance, a Project Management Plan (PMP) that shall be used as a foundation for information and resource management planning. The contractor shall deliver the PMP to the Government within 15 work days after Task Order award. The PMP shall include, but not be limited to, the following: Status of current and planned tasks and subtasks Task dependencies and interrelationships Deliverables (draft, interim, final, etc.), Quality Control plan The contractor shall keep the PMP up-to-date, be accessible electronically at any time, and be prepared to brief any PMP content to the Government at short notice (within 24 hours). The PMP shall be used as a foundation for the Status Report. C.2.1.1.2 Quality Assurance The contractor shall institute and maintain a capability to ensure the quality of the products and services required under this task order. The contractor shall apply industry standards and best practices. Quality assurance practices in program management to include, at a minimum, identification of quality control factors and processes, evaluation methods, earned value, and process improvement. The contractor shall prepare a Quality Control Plan (QCP) and perform quality control functions in accordance with the Plan. The contractor shall deliver quality control reports as described in the government-approved QCP. The QCP may be modified as the project progresses by coordinated approval of the contractor and the government. The contractor will be required to provide the government written notice of impending problems with its work efforts on a Problem Notification Report. C.2.1.2 Task 2: Design and Construct Prototypes (CLIN 0002: 0002A-0002D) The contractor shall design and construct prototype range control systems that are capable of detecting pre-ignition conditions of food being heated in a cooking vessel and shutting off or modulating electric power/gas flow to the heating element such that ignition does not occur. The system shall also be capable of meeting the performance requirements prescribed by the Technical Feasibility Performance Goals (TFPGs). The prototype range control systems shall be integrated with current-model production residential cooktop/ranges that are commonly found in homes in order to demonstrate the feasibility and performance of each design. The prototypes shall include the following four heating element types: electric, gas, and electric glass/ceramic thermally-conductive and electric glass/ceramic electromagnetic induction cooktops. The contractor shall meet with CPSC staff at the contractor's facilities to review the prototype designs that will be used in the TFPG testing. C.2.1.3 Task 3: Prepare Test Plans and Test Prototypes (CLIN 0003: 0003A- 0003D) The contractor shall develop a test plan for each prototype. The contractor shall conduct tests in accordance with the final test plans as approved by CPSC staff. The contractor shall test the four prototype range designs in accordance with the requirements contained within the TFPGs. To streamline the test program, the contractor may exclude TFPG requirements that are determined to be unnecessary as a result of the technology being used. The contractor shall provide a test plan describing what tests will be performed to CPSC staff for concurrence. The contractor shall include the rationale for any exclusions from the TFPG requirements in the test plan. C.2.1.4 Task 4: Prepare Data Analysis and Testing Results Report (CLIN 0004) The contractor shall provide a data analysis and results report focusing on the primary objectives of this requirement: Development of prototype range control systems to detect pre-ignition conditions as a means of reducing the risk of unattended cooking fires. Identification of areas where system designs fell short of TFPGs. Recommendations identifying follow-on work to overcome design shortfalls and that will lay the groundwork for development of food ignition-propensity reduction requirements for the voluntary safety standards. The report shall include a list of all parts used in modifying the baseline production-model ranges to meet the TFPG and provide the cost and supplier for each functional component. C.2.1.5 Task 5: Prepare Feasibility Report (CLIN 0005) A report shall be prepared on the feasibility of the prototypes to the TFPGs to establish feasibility for the residential market. C.2.1.6 Task 6: Final Report (CLIN 0006) All of the items identified in 2.5 shall be included in the draft and final reports. The final report shall also include the comments provided by CPSC on the draft report. C.2.2 Section 508 Compliance (resultant task order requirement, not a separate task) Section 508 of the Rehabilitation Act requires Federal agencies to make their electronic and information technology accessible to people with disabilities. This applies to all Federal agencies when they develop, procure, maintain, or use electronic and information technology. All electronic and information technology (EIT) procured through the resultant task order must meet the applicable accessibility standards specified in 36CFR1194.2, unless an agency exception to this requirement exists. Any agency exceptions applicable to the resultant task order are listed below. The standards define Electronic and Information Technology, in part, as "any equipment or interconnected system or subsystem of equipment that is used in the creation, conversion, or duplication of data or information. The standards define the type of technology covered and set forth provisions that establish a minimum level of accessibility. The application section of the standards (1194.2) outlines the scope and coverage of the standards. The standards cover the full range of electronic and information technologies in the Federal sector, including those used for communication, duplication, computing, storage, presentation, control, transport and production. This includes computers, software, networks, peripherals and other types of electronic office equipment. Applicable Standards, which apply to this acquisition Section 1194.21: Software Applications and Operating Systems __________. Section 1194.22: Web-based Internet Information and Applications ____________. Section 1194.23: Telecommunications Products _______________. Section 1194.25: Self-Contained, Closed Products _____X________. Section 1194.26: Desktop and Portable Computers _____________. Section 1194.31: Functional Performance Criteria ______________. Agency Exceptions, which apply to this acquisition National Security System _____________. Acquired by a contractor incidental to a contract _________. Located in spaces frequented only by a service personnel for maintenance, repair or Occasional monitoring of equipment ____________. Would impose and undue burden on the agency ____________. There are no exceptions that apply to this acquisition. Please review and advise if you can meet the government's minimum requirements. Please outline any requirements offered which do not meet the government's minimum requirements and attach as a separate word document. Delivery of the Burn Box Container is required within Sixty(60) Days, After Receipt of Order (ARO). FOB Destination: Welcome, MD 20693. POC for Delivery: Will be disclosed after award of order. D. PACKAGING AND MARKING All reports and deliverables shall be submitted electronically through GSA's electronic task order system (ITSS). D.1 Packaging All reports and deliverables that are in hard copy format, as opposed to electronic format, and that are physically transported through the U.S. mail or private courier services, are to be securely packaged using the contractor's best practices. Materials produced under this task order are to be handled by the contractor as confidential documents and marked For Official Use Only (FOUO). D.2 Marking All reports and deliverables that are in hard copy format, as opposed to electronic format, and that are physically transported through the U.S. mail or private courier services, are to be addressed to the individual at the office or floor at the end destination, with the outside package clearly marked to indicate the order number and the recipient's office telephone number. E. INSPECTION AND ACCEPTANCE BY THE GOVERNMENT E.1 Place of Inspection and Acceptance Inspection and acceptance of all work performed, reports and other deliverables under the resultant task order shall be performed by the following GSA COTR and the client representative at the address specified below: Martha S. Banks, PMP GSA/FAS/AAS Contracting Officer's Technical Representative (COTR) 301 7th Street, S.W. - Room 6109 Washington, D.C. 20405-0001 Phone: 202 205 3339 Email: martha.banks@gsa.gov Client POC to be provided at task order award. Inspection and Acceptance will occur at: Consumer Product Safety Commission (CPSC) Location to be provided upon award. E.2 Scope of Inspection E.2.1 All deliverables will be inspected for content, completeness, accuracy and conformance to task order requirements by the GSA COTR and the client representative. E.2.2 The Government requires a period not to exceed thirty (30) days after receipt of final deliverable items for inspection and acceptance or rejection. E.3 Basis of Acceptance E.3.1 (CLINs 0001-0006) The basis for inspection/acceptance shall be in compliance with the requirements set forth in the resultant Task Order, the Contractor's response and other terms and conditions of the task order including the Government Quality Assurance Surveillance Plan (QASP), Any products/services/deliverables rejected shall be corrected in accordance with the applicable clauses. NOTE: Inspection and acceptance documentation must be received and included in the contract file prior to payment of invoices. E.3.1.1 Items such as travel and ODCs will not be accepted for the resultant task order. E.3.2 Reports, documents, and narrative type deliverables will be accepted when all discrepancies, errors or other deficiencies identified in writing by the Government have been corrected. E.3.2.1 The contractor shall provide delivery of electronic copies of each deliverable. Electronic copies shall be delivered via email attachment or other media by mutual agreement of the parties. The electronic copies shall be compatible with MS Office 2003 or later or other applications as appropriate and mutually agreed to by the parties. E.3.2.2 The contractor shall use best commercial practice for formatting deliverables under the resultant task order . E.3.2.3 If the draft deliverable is adequate, the Government may accept the draft and provide comments for incorporation into the final version. E.3.2.4 All of the Government's comments to deliverables must either be incorporated in the succeeding version or the contractor must demonstrate to the Government's satisfaction why such comments should not be incorporated. E.3.2.5 If the Government finds that a draft or final deliverable contains spelling errors, grammatical errors, improper format, or otherwise does not conform to the requirements stated within this task order, the document may be immediately rejected without further review and returned to the contractor for correction and re-submission. F.1 Deliverables All written deliverables (see Section F.2.4) require at least three iterations - an initial draft, an interim final draft, and a final. The final document must be approved and accepted by the Government. The contractor shall submit draft and final documents using Microsoft Office 2003 or later, to the Government electronically. The Government must have 15 business days for review and submission of written comments to the contractor on initial draft and final draft documents. The contractor shall incorporate the Government comments into the final draft and final deliverable before submission. NOTE: THE COSTS TO DEVELOP, DELIVER, AND IMPLEMENT ALL DRAFTS AND FINAL DELIVERABLES MUST BE INCLUDED IN THE CONTRACTOR'S PROPOSALD LABOR RATES. F.1.1 The Government will provide written acceptance, comments and/or change requests, if any, within fifteen (15) working days from receipt by the Government of the initial deliverable. F.1.2 Upon receipt of the Government comments, the contractor shall have ten working days to incorporate the Government's comments and/or change requests and to resubmit the deliverable in its final form. F.1.3 Written Acceptance/Rejection by the Government The Government shall provide written notification of acceptance or rejection of all final deliverables within 30 days. Absent written notification, final deliverables will be construed as accepted. All notifications of rejection will be accompanied with an explanation of the specific deficiencies causing the rejection. F.1.4 Non-Conforming Products or Services Non-conforming products or services will be rejected. Deficiencies will be corrected, by the Contractor, within ten (10) work days of the rejection notice. If the deficiencies cannot be corrected within ten (10) work days, the Contractor will immediately notify the GSA COTR of the reason for the delay and provide a proposed corrective action plan within ten (10) work days. F.2 DELIVERIES OR PERFORMANCE Contractor personnel shall be required to perform their duties at the contractor's facility (95%), at the government site in the Washington, DC metropolitan area (5%) for in-progress reviews and project meetings. F.2.1 Notice Regarding Late Delivery The contractor shall notify the GSA COTR as soon as it becomes apparent to the contractor that a scheduled delivery will be late. The contractor shall include in the notification the rationale for late delivery, the expected date for the delivery and the project impact of the late delivery. The GSA COTR will review the new schedule and provide guidance to the contractor via a TO modification. Such notification in no way limits the Government's right to any and all rights and remedies up to and including termination. F.2.2 Place(s) of Delivery Originals of all correspondence and reports related to this RFP shall be delivered to the GSA Contracting Officer's Technical Representative at the address below: GSA/FAS/AAS National Capital Region ATTN: Robert Larick, PMP, COTR 301 7th Street, S.W. - Room 6109 Washington, D.C. 20405-0001 Telephone: 202 205-4607 Fax: 202 708-0034 Email: robert.larick@gsa.gov Copies of all correspondence and reports shall be delivered to the POC at the address below: To be provided at task order award. F.2.3 Period of Performance The period of performance begins on the date of task order award. The period of performance for the Task Order is one-year with no options. F.2.4 Task Order Schedule and Milestone Dates The following schedule of milestones will be used by the GSA COTR to monitor timely progress under this Task Order. MILESTONE/DELIVERABLE CLIN Number SOW Reference PLANNED COMPLETION DATE Task Order Program Management, Project Management and Quality Assurance 0001 C.2.1.1 7 Days After Task Order Award Develop Project Management Plan 0001 C.2.1.1.1 10 Days After Task Order Award Prepare Quality Control Plan 0001 C.2.1.1.2 30 Days After Task Order Award Design and Construct Prototypes 0002 C.2.1.2 NLT 120 Days After Completion of CLIN 0001 Prepare Test Plans and Test Prototypes 0003 C.2.1.3 NLT 120 Days After Completion of CLIN 0002 Prepare Data Analysis and Testing Results Report 0004 C.2.1.4 NLT 30 Days After Completion of CLIN 0003 Prepare Feasibility Report 0005 C.2.1.5 NLT 15 Days After Completion of CLIN 0004 Final Report 0006 C.2.1.6 25 Days After Completion of CLIN 0005 F.2.4.1 Letter of Transmittal A transmittal letter that will identify the task order, shall accompany all deliverables submitted under this task order. A copy of the transmittal letter shall be forwarded to the Contracting Officer for inclusion in the contract file. G. GOVERNMENT FURNISHED PROPERTY (GFP) No government furnished property will be provided. G.1 Government Furnished Information (GFI) All Government furnished property shall remain the property of the Government and shall be returned to the Government prior to the end of this task order. In addition, sharing of Government furnished information shall only be done after obtaining written approval from the Government, in advance of sharing Government furnished information. Any Contractor contributions to Government furnished information under this task order shall become property of the Government. The government provides GFI in the form of previous Studies that have been performed for Cook Top Controls and are attached in Section 15.0. Below are the titles of these reports: 1. CPSC GLASS COOKTOP STUDY #10 2. CPSC GLASS COOTOP STUDY II - DRAFT - TEST #2 3. CPSC CERAMIC COOKTOP FINAL REPORT (CLEARED) - REPORT #1 4. CPSC PHASE III - TEST #3 5. CPSC PHASE IV - STUDY #6 6. CPSC RANGE FIRE STUDY REPORT LIST 2010 - REPORT #1 7. CPSC FINAL ADL REPORT - FINAL REPORT 8. ENERGY INTERNAL I - STUDY #5 9. NISTIR 5729 - STUDY #7 10. NISTIR 5950 - STUDY #4 11. RANGE 1999 - STUDY #8 12. RANGE 2001 - STUDY #9 G.2 CONTRACTOR FURNISHED PROPERTY (CFP) Except as specified herein, the contractor will be responsible for furnishing all consumables, workstations, equipment, furniture, computer needs, and any other supplies necessary to perform the work required by the task order. The costs for CFP must be included in the contractor's Proposald labor rates. No CFP shall be separately charged to the Government. At task order completion, the contractor shall remove any CFP that was not charged to the Government. H.1 SECURITY/PRIVACY REQUIREMENTS The contractor shall provide a National Agency Check (NAC) for all contractor employees who are to be provided access to Government e-mail/internet, LAN/WAN and other Government information networks. Work on this project may require that contractor personnel have access to sensitive, privileged, or Privacy Act information. Personnel shall adhere to the Privacy Act, Title 5 of U.S. Code, section 552a and applicable Agency rules and regulations. Contractor personnel shall not divulge or release privacy data or information developed or obtained in the performance of this task order, until made public or specifically authorized by the Government. The Vendor must not use, disclose, or reproduce third party companies propriety data, other than as authorized and required in the performance of this task order. The Contractor shall notify the COTR within 24 hours, identifying personnel that no longer require access to Government information systems. Effective September 8, 2009, all Federal contractors and subcontractors must use E-verify. Executive Order 12909 mandates the electronic verification of all employees working on any federal contract. For more information, visit www.dhs.gov/e-verify. H.2 Organizational Conflict of Interest and non-disclosure requirements H.2.1 Organizational Conflict of Interest If the Contractor is currently providing support or anticipates providing support to the CPSC that creates or represents an actual or potential organizational conflict of interest (OCI) as defined in FAR Subpart 9.5, the Contractor shall immediately disclose this actual or potential OCI in accordance with FAR Part 9.5. The contractor is also required to complete and sign an Organizational Conflict of Interest Statement in which the Contractor (and any Subcontractors, consultants or teaming partners) provide information concerning the actual or potential conflict with any response for any solicitation relating to any work in the TO. All actual or potential OCI situations shall be handled in accordance with FAR Subpart 9.5. H.2.2 Non-Disclosure Requirements All Contractor personnel (to include Subcontractors, teaming partners, and consultants) who will be personally and substantially involved in the performance of the TO issued which requires the Contractor to act on behalf of, or provide advice with respect to any phase of an agency procurement, as defined in FAR 3.104-4, shall execute and submit a "Certificate of Non-Disclosure Agreement for Contractor Employees" Form (See Attachment C). This is required prior to the commencement of any work on such TO and whenever replacement personnel are proposed under an ongoing TO. Any information obtained or provided in the performance of this TO is only to be used in the performance of the TO. All contractor employees assigned to work under this task order shall complete Attachment B. Additionally, the contractor (and any Subcontractors, consultants or teaming partners) is required to complete and sign Attachment C, Sensitive Data Non-Disclosure Agreement. This is required prior to the commencement of any work under the task order. H.3 Invoice Submission For all invoices, the contractor shall provide invoice backup data, including labor categories, rates and quantities of labor hours. The Contractor shall utilize NCR's electronic system to submit invoices. Invoices shall be sent to: www.it-solutions.gsa.gov and www.finance.gsa.gov NOTE: In order to be considered for award, all vendors must be registered in the IT Solutions System. Any contractor that is not registered at time of award, shall not be considered for award. Contractor's can register at: https://web.itss.gsa.gov/itss/v41_helpdocs.nsf/HomeTellMeRegAbout/About+Contractor+Registration?OpenDocument H.3.1 Invoice Requirements The Contractor shall submit Requests for Payments in accordance with the format contained in GSAM 552.232-70, INVOICE REQUIREMENTS (SEPT 1999), to be considered proper for payment. In addition, the data elements indicated below shall be included on each invoice. Task Order number: (from GSA Form 300, Block 2) Paying Number: (ACT/DAC NO.) (From GSA Form 300, Block 4) NCR Project No.: NP 6100090930 Project Title: Cook Top Controls Redesign for Fire Prevention The Contractor shall provide invoice backup data, including labor categories, rates and quantities of labor hours. The Contractor shall submit invoices as follows: H.3.1.1 Invoice Instructions A proper invoice for each task order shall be submitted not later than 5 work days after acceptance by the Government of the product, service, and/or cost item. In the absence of Government acceptance within 30 days, the contractor shall submit an invoice. A separate invoice for each task order shall be submitted on official company letterhead with detailed costs for each of the following categories: Total Price for Each CLIN Total invoice amount Prompt payment discount offered (if applicable) In addition to the above information, the invoice shall include the following minimum task identification: GSA task order number Accounting Control Transaction (ACT) number (assigned by GSA on the Delivery Order, GSA Form 300, Block 4) Period of Performance (month services performed for work request task orders, month deliverable completed for fixed price task orders). Invoice Number Client name and address When the paying office is GSA, the original of each invoice, with supporting documentation, shall be submitted electronically through ITSS www.it-solutions.gsa.gov and www.finance.gsa.gov. Invoices for final payment must be so identified and submitted when tasks have been completed and no further charges are to be incurred. These close-out invoices, or a written notification that final invoicing has been completed, must be submitted to the ordering agency within 30 days of task order completion. A copy of the written acceptance of task completion must be attached to final invoices. If the contractor requires an extension of the 30- day period, a request with supporting rationale must be received prior to the end of the 30-day period. H.4 Contract Administration Client COTR: To be provided upon task order award NCR COTR: Robert Larick, PMP GSA/FAS/AAS 301 7th Street, S.W. - Suite 6109 Washington, DC 20405-0001 202 205 5607 robert.larick@gsa.gov NCR CO: Stephanie Kelly, Contracting Officer GSA/FAS/AAS 301 7th Street, S.W. - Suite 6109 Washington, DC 20405-0001 202 708 7408 stephanie.kelly@gsa.gov H.4.1 Contracting Officer's Technical Representative (COTR) (a) A contracting Officer Technical Representative (COTR) may be appointed to assist the contracting officer in administration of this task order. (b) When the appointment of a COTR is deemed necessary, the contracting officer will issue the Attachment D formal Letter of Appointment defining the scope and limitations of the authority of the designated COTR. A copy of the COTR appointment letter will be m...

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Derrick Dudley
Contract Specialist
Fax: 2027080034

Secondary Contact

Stephanie A Kelly
Contracting Officer
Fax: 2027080034

Documents

No documents available.

Lifecycle

Solicitation:NP6100090930
  1. Combined Synopsis
  1. 2×
    Combined SynopsisCurrentJun 23, 2010

    CookTop Controls for CPSC

    Notice 7b974e912edce825358cbcea43a67f18 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

NP6100090930

Archive Date

Jul 29, 2010