CUP Boiler Repair Services - Sources Sought
Archived on May 9, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM EDT
- Posted
- April 17, 2026
- Notice type
- Sources Sought
- Set-aside
- No Set aside used
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of CommerceNATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
Notice details
- Office
- DEPT OF COMMERCE NIST
- Place of performance
- Gaithersburg, Maryland
- PSC
- J045: MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
- Last updated
- Oct 31, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- OFPM_TEAM_SS26_12
- Notice ID
- 4a1fc3dda04448e9acb9a721b90b8ab6
Description
NIST Gaithersburg Campus is seeking sources who are a ASME “R” stamp qualified boiler repair and welding contractor to perform high pressure steam boiler repair and fuel tank cleaning at Bldg. 302, NIST, Gaithersburg, MD. Please see attached Sources Sought and Statement of Work (SOW) for details.
Award Overview
No prior contract identified
No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.
Contacts
Contracting Officer
Primary Contact
Documents
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
CUP Boiler Repair Services - Sources Sought
- 4Version 4PresolicitationArchived
Type changed from Sources Sought to Presolicitation
CUP Boiler Repair Services - Pre Solicitation Notice
Similar Opportunities
Title | Phase | Deadline |
|---|---|---|
Amendment 1-Solicitation - CUP - Two-Phase Design-Build Acquisition for Modernization and Expansion of Central Utility Plant The purpose of this amendment 1 is to: 1. Provide answers to questions asked in response to this solicitation, 1333ND26RNB190004. 2. Provide previous questions and answers for the first CUP Phase I solicitation, 1333ND26RNB190001. Please see attached 1333ND26RNB190004 Amendment 1 Current Solicitation RFI_Q and A _1333ND26RNB190004_ CUP Phase I Previous Solicitation RFI_Q and A_1333ND26RNB190001_ CUP Phase I *Please review the note on page one (1) of the previous solicitation Q&A sheet. All other terms and conditions remain unchanged. *************************************************************************************** Please see the following attachments for details. 1. 1333ND26RNB190004 CUP Modernization Solicitation (includes attachments for solicitation) 2. Statement of Work Technical Attachments A-I NOTICE: This document is a formal solicitation provided for Phase I of this Two-Phase Design-Build Indefinite Delivery, Indefinite Quantity Single Award Task Order Contract (SATOC). Any additional amendments or updates to the Phase I solicitation will be posted exclusively on SAM.gov. All changes will be clearly identified, with modified sections highlighted or otherwise marked to distinguish them from previous versions. Industry is strongly encouraged to monitor SAM.gov regularly for any subsequent amendments. Note: This solicitation does not contain a Project Labor Agreement (PLA) requirement. Please review all attachments and due dates. | Solicitation | 03/16/2026 |
SOLICITATION NOTICE MULTIPLE-AWARD CONSTRUCTION CONTRACT (MACC) FOR GENERAL CONSTRUCTION SERVICES Solicitation No. 75N99027R00002 The Department of Health and Human Services (HHS), National Institutes of Health (NIH), Office of Acquisition and Logistics Management (OALM), Construction, A&E, Facilities and Leasing Office (CAFLO), anticipates issuing a Request for Proposals (RFP) for a Multiple-Award Construction Contract (MACC) to support the ongoing construction, alteration, repair, and maintenance requirements of the NIH Office of Research Facilities (ORF). The resulting contracts will be multiple-award Indefinite-Delivery, Indefinite-Quantity (IDIQ) construction contracts. Work will be authorized through individually issued task orders. This acquisition is anticipated to be conducted using competitive negotiated procedures under FAR Part 15. The Government intends to award multiple IDIQ construction contracts under FAR Subpart 16.5. Individual task orders will generally be awarded on a firm-fixed-price basis. The anticipated aggregate ceiling is $3 billion over an eight-year ordering period. Individual construction requirements will be competed through task orders among eligible MACC awardees in accordance with the ordering procedures established in the resulting contracts. The solicitation and resulting contracts will include procedures for adding and removing awardees during that period (on/off ramp). The initial seed-project scope estimated construction magnitude, applicable evaluation factors, and proposal submission requirements will be provided in the solicitation. SCOPE OF WORK Work under the MACC will primarily consist of general construction and may include, but is not limited to, maintenance, repair, painting, alterations, architectural work, mechanical systems, electrical systems, plumbing, heating, ventilation and air-conditioning (HVAC), civil work, earthwork, fencing, structural work, steel fabrication and welding, roofing, building renovations, demolition, new building construction, sustainable construction, design-bid-build, and design-build projects. Individual task orders may include one or more construction disciplines and will vary in size, scope, and complexity. All work will be performed in accordance with the requirements, specifications, drawings, and other documents applicable to each individual task order. LOCATIONS OF WORK The National Institutes of Health (NIH), Office of Research Facilities (ORF) is the steward of NIH facilities and is responsible for the planning, design, construction, acquisition, maintenance and operation of NIH owned facilities, which include campuses in: · Bethesda, Maryland, · Frederick, Maryland, · Poolesville, Maryland, · Research Triangle Park, North Carolina, · The Rocky Mountain Laboratories (RML) in Hamilton, Montana. NAICS CODE AND SMALL BUSINESS SIZE STANDARD The North American Industry Classification System (NAICS) code for this acquisition is 236220, Commercial and Institutional Building Construction. PSC Code: Y1JZ The corresponding small business size standard is $45 million. The NAICS code and small business size standard applicable to the initial seed project is also anticipated to be NAICS 236220 and $45 million, respectively. ACQUISITION STRATEGY AND ANTICIPATED AWARDS This acquisition will be conducted using full and open competition with reserves for eligible small business concerns. NIH anticipates awarding up to twenty (20) IDIQ contracts, consisting of: Approximately four (4) unrestricted/full-and-open awards; and Approximately sixteen (16) awards under small business reserves. The small business reserves are anticipated to include eligible concerns in the following categories: Historically Underutilized Business Zone (HUBZone) Small Business; Women-Owned Small Business (WOSB); Service-Disabled Veteran-Owned Small Business (SDVOSB); and Participants in the SBA 8(a) Business Development Program. The solicitation will identify the anticipated distribution of the sixteen (16) reserve awards among the applicable small business and socioeconomic categories and will establish the eligibility requirements applicable to each reserve. NIH anticipates approximately four (4) awards in each socioeconomic reserve. Offerors must meet all applicable SBA eligibility requirements for the category under which they submit an offer. BONDING CAPACITY Offerors competing for an unrestricted/full-and-open award shall provide evidence from their surety demonstrating, at a minimum, bonding capacity of: $100 million for a single project; and $300 million aggregate bonding capacity. Offerors competing for an award under a small business reserve shall provide evidence from their surety demonstrating, at a minimum, bonding capacity of: $3 million for a single project; and $10 million aggregate bonding capacity. The solicitation will establish the specific documentation required to demonstrate bonding capacity. Performance and payment bond requirements applicable to individual construction task orders will be established in accordance with the solicitation, resulting contracts, applicable law and regulation, and the requirements of each task order. SMALL BUSINESS ELIGIBILITY AND JOINT VENTURES Offerors seeking an award under a small business reserve must satisfy all applicable SBA eligibility requirements for the applicable reserve category and NAICS code. The solicitation will identify any documentation required to establish an offeror's eligibility for the applicable small business or socioeconomic category. Small business concerns intending to submit an offer as a joint venture must comply with all applicable SBA joint venture requirements, including applicable requirements governing SBA-approved Mentor-Protégé relationships. Prospective offerors should consult current SBA regulations and guidance concerning joint ventures and the SBA Mentor-Protégé Program at www.sba.gov. CONTRACT CEILING AND ORDERING PERIOD The aggregate maximum value of all contracts and task orders awarded under the MACC will not exceed $3,000,000,000.00 over the entire ordering period. The $3 billion ceiling applies collectively to all MACC contracts and is not a per-contractor ceiling. The anticipated ordering period will consist of one eight-year ordering period. There is no anticipated annual or individual-contractor ceiling other than limitations established by the terms of the resulting contracts and individual task orders. MACC holders will remain eligible to compete for task orders, subject to the terms and conditions of their contracts, until expiration of the ordering period or exhaustion of the aggregate MACC ceiling, whichever occurs first. TASK ORDERS All work under the MACC will be authorized through individual task orders. Individual task orders will generally be awarded on a firm-fixed-price basis and will be separately priced. Each task order will establish the applicable scope of work, specifications and drawings, period of performance, applicable wage determination, bonding requirements, and other project-specific requirements. Task orders may be competed among all eligible MACC holders or restricted to eligible small business MACC holders in accordance with the ordering procedures established in the solicitation and resulting contracts. The anticipated maximum value of an individual task order is $800 million. Eligibility to compete for individual task orders may be subject to project-specific requirements, including required bonding capacity. GUARANTEED MINIMUM The Government's guaranteed minimum under each resulting IDIQ contract will be $1,000. The guaranteed minimum will be satisfied through issuance of a task order. The $1,000 guaranteed minimum is a contractual minimum obligation and should not be interpreted as establishing the minimum dollar value of all future task orders. SEED PROJECT The Government anticipates using an initial seed project in connection with the MACC source selection. The seed project, evaluation requirements, applicable specifications and drawings, and any other project-specific information will be identified in the solicitation. Successful MACC awardees that do not receive a seed-project task order will receive a task order sufficient to satisfy the applicable guaranteed minimum. SITE VISITS The Government anticipates conducting two organized site-visit sessions for the seed project on November 9, 2026. The solicitation will provide the session times, location, registration procedures, and other attendance instructions. To accommodate prospective offerors, the Government anticipates scheduling two site-visit sessions at the applicable location, one in the morning and one in the afternoon. Prospective offerors may attend only one scheduled session. If the solicitation assigns offerors to a particular session based on company name or another administrative method, those assignments will be identified in the solicitation. Offerors are urged and expected to inspect the location where the work associated with the seed project will be performed. No additional site visits are anticipated beyond those identified in the solicitation. SOLICITATION DOCUMENTS Prospective offerors should search SAM.gov using Solicitation No. 75N99027R00002. The solicitation provides instructions for obtaining or accessing specifications, drawings, and other controlled or restricted procurement documents, as applicable. No hard copies of the solicitation, specifications, or drawings will be provided. Prospective offerors are responsible for monitoring SAM.gov for issuance of the solicitation and any amendments, notices, or other updates associated with this procurement. Prospective offerors should follow all procedures identified in the solicitation for obtaining solicitation documents, specifications, drawings, amendments, and other applicable information. All responsible sources may submit a proposal in response to the solicitation, which shall be considered by the Government, subject to the eligibility requirements applicable to the unrestricted competition and small business reserves. QUESTIONS AND POINT OF CONTACT Telephone requests and questions will not be accepted. Questions concerning this solicitation notice should be submitted by email to: Clarion Miller Contracting Officer Matthew Heavey Contracting Officer Email: maccsolicitation@mail.nih.gov Contracting Office Address: National Institutes of Health Office of Acquisition and Logistics Management (OALM) Construction, A&E, Facilities and Leasing Office (CAFLO) Bldg 13, Rm 2E48Y MSC 5711 9000 Rockville Pike Bethesda, MD 20892 The e-mail subject line should include: 75N99027R00002 – NIH MACC Amendment 0001: The purpose of this Amendment is change the location of the pre-proposal conference / site visit. See attachment 75N99027R00002 Amendment 0001. | Solicitation | 12/15/2026 |
The RFI response due date has been extended to November 2, 2026. The RFI response due date has been extended to October 26, 2026. Site Visit The National Institute of Standards and Technology (NIST) will conduct an optional site visit in connection with its Request for Information (RFI) for the Building 215 Cleanroom HEPA Filter Replacement requirement at the NIST Gaithersburg campus. The purpose of the visit is to help interested vendors understand the existing conditions and provide informed responses to the RFI. The visit is for market research only. Attendance is not required to respond to the RFI or to participate in any future solicitation. This site visit does not constitute a solicitation or a request for proposals or quotations. NIST will not award a contract or reimburse attendance or response costs on the basis of the RFI. RFI responses will be used for planning purposes and will be treated as information, not offers. The Government will host a site visit on Friday, October 9, 2026, at 9AM EST at the following location: National Institute of Standards and Technology 100 Bureau Drive, Building 215 Lobby Gaithersburg, MD 20899 Offerors interested in attending the site visit must submit their request for visitor badge via email to Drew.Comley@nist.gov and Warren.Livengood@nist.gov by no later than Wednesday, October 7, 2026. Offerors shall use the email subject line: Site Visit – B215 HEPA Filter RFI All requests must include the following information: Visitor’s full legal name. Visitor’s country of citizenship. NIST Gaithersburg is a secure federal facility. On the date of the site visit, all Visitors to NIST Gaithersburg may access the site, through the Visitor Center from the main gate (Gate A) at W. Diamond Ave. and Bureau Drive. All visitors must be preregistered and present photo identification and vehicle registration information upon arrival. NIST can only accept a state-issued driver’s license or identification card for access to federal facilities if issued by states that are REAL ID compliant or have an extension. For more information about visiting the NIST Gaithersburg campus, please visit https://www.nist.gov/visit. REQUEST FOR INFORMATION (RFI) BUILDING 215 ADVANCED MEASUREMENT LABORATORY (AML) CLEANROOM REPAIR AND HEPA FILTER REPLACEMENT Solicitation/Reference No.: 1333ND26RNB190014 1. PURPOSE OF THIS REQUEST FOR INFORMATION The National Institute of Standards and Technology (NIST) is conducting market research pursuant to Federal Acquisition Regulation (FAR) Part 10 and FAR 15.201 to obtain industry feedback concerning the scope, schedule, phasing, cleanroom outage requirements, technical and performance risks, and estimated construction cost associated with the Building 215 Advanced Measurement Laboratory (AML) Cleanroom Repair and HEPA Filter Replacement project. NIST previously solicited this requirement under Solicitation No. 1333ND26RNB190014. NIST did not receive an acceptable offer under that solicitation. NIST is therefore reassessing the requirement and acquisition approach before determining whether and how to resolicit the project. NIST is particularly interested in identifying aspects of the requirement that may materially affect industry participation, constructability, schedule feasibility, pricing, risk, or the ability of contractors to submit competitive proposals. Industry is encouraged to provide candid feedback and to identify recommended changes that could improve constructability, competition, schedule feasibility, cost certainty, and overall project execution while continuing to meet NIST’s mission and cleanroom operational requirements. 2. RFI / MARKET RESEARCH NOTICE THIS RFI IS ISSUED SOLELY FOR INFORMATION AND ACQUISITION PLANNING PURPOSES. IT DOES NOT CONSTITUTE A REQUEST FOR PROPOSAL (RFP), INVITATION FOR BID (IFB), REQUEST FOR QUOTATION (RFQ), OR OTHER SOLICITATION. The Government does not intend to award a contract based on responses to this RFI. Responses will be treated as information only and shall not be construed as offers or proposals that can be accepted by the Government to form a binding contract. The Government will not reimburse respondents for costs incurred in preparing or submitting information in response to this RFI or for participating in any follow-up discussions. This RFI does not obligate the Government to issue a solicitation or award a contract, nor does it restrict the Government’s ultimate acquisition approach. Respondents are advised that information submitted in response to this RFI may be used by NIST in developing or revising the acquisition strategy, statement of work, specifications, schedule, phasing requirements, outage requirements, Government cost estimate, and future solicitation. Respondents should clearly identify and mark any proprietary, confidential, or commercially sensitive information contained in their responses. Respondents should avoid including proprietary information unless necessary to provide a meaningful response. 3. PROJECT BACKGROUND The project involves repair and modernization work within the Building 215 Advanced Measurement Laboratory cleanroom located at the NIST Gaithersburg Campus. The AML cleanroom encompasses approximately 1,800 square meters and includes approximately 750 square meters of Class 100 cleanroom space. The facility supports sensitive NIST research activities and contains specialized and, in some instances, irreplaceable scientific equipment. The project generally includes, but is not limited to: Replacement of approximately 1,200 terminal supply HEPA filters; Repair and/or modification of HEPA filter connections; Testing, balancing, certification, and recertification of affected HEPA filters and cleanroom spaces; Replacement of approximately 70 variable air volume (VAV) terminal units; Replacement of approximately 54 airflow monitoring devices; Installation of approximately 32 exhaust air control valves; Modification and repair of associated ductwork; Rebalancing of associated air-handling and exhaust systems; Verification and repair, as required, of existing capped ductwork; Controls-related work; Cleaning, testing, balancing, commissioning, and cleanroom certification associated with each affected area; and Protection of existing cleanroom spaces, research operations, and sensitive scientific equipment throughout construction. Detailed project drawings, specifications, and/or relevant portions of the previously issued solicitation may be attached to this RFI or otherwise made available through SAM.gov for purposes of industry review. 4. CURRENT PHASING AND OUTAGE CONCEPT NIST’s previous acquisition strategy was developed to minimize disruption to ongoing research operations by performing the work through phased cleanroom outages rather than shutting down the entire cleanroom for the duration of construction. The previous requirement contemplated 19 construction phases consisting of 18 Critical Cleanroom Outage Phases and one Non-Critical Phase. For each Critical Cleanroom Outage Phase, the contemplated outage period was approximately nine calendar days, generally structured as follows: Outage/construction activities begin at approximately 7:00 p.m. on Friday; Work proceeds continuously, including 24-hour-per-day/seven-day-per-week operations, as necessary; Construction, startup, testing, balancing, cleaning, commissioning, and applicable cleanroom certification are completed during the outage period; and The affected cleanroom area is required to achieve Ready for Re-Occupancy by approximately 7:00 a.m. on the second following Monday. Ready for Re-Occupancy generally means that required construction, startup, testing, balancing, cleaning, commissioning, and applicable cleanroom certification have been completed; the affected area is operationally capable of supporting its intended use without material restriction; and no deficiencies remain that materially impair safe occupancy or cleanroom operations. The previous requirement also contemplated maintaining unaffected cleanroom bays in operation to the maximum extent practicable and included the possibility of limited additional weekend outages affecting larger portions of the cleanroom. NIST recognizes that these operational constraints may significantly affect contractor staffing, sequencing, subcontractor availability, construction risk, pricing, and schedule feasibility. NIST is specifically seeking industry feedback concerning these requirements. 5. INFORMATION REQUESTED FROM INDUSTRY Respondents are requested to review the project information provided with this RFI and address the following topics. Respondents are not required to answer every question; however, detailed and candid responses are encouraged. A. Outage Feasibility and Constraint Identification Critical Path Bottlenecks: Identify the specific trade activities that present the highest risk to achieving a 9-day bay outage window. Realistic Outage Duration: Based on your experience in occupied nanofabrication facilities, what is a realistic, achievable calendar-day duration to complete a single cleanroom bay/module from shutdown to final recertification? Risk & Impact Analysis: Explain how the current 24-hour, 9-day limit impacts project risk, labor density, safety, quality assurance, and total cost (including risk contingencies for $8,000/day liquidated damages). Phasing & Mock-Up Alternatives: Would executing a "mock-up bay" or initial trial phase establish a viable baseline for subsequent production bays? B. Construction Cost Estimate Based on the information provided, what is industry’s rough-order-of-magnitude (ROM) estimated construction cost for the complete project? Respondents may provide either a specific estimated amount or a reasonable estimated range. To the extent practicable, please identify the approximate portion of the ROM estimate attributable to: Direct construction work; HVAC/HEPA/VAV work; Controls work; Testing and balancing; Commissioning and cleanroom certification; Premium time, shift work, or 24/7 outage staffing; General conditions; Phasing and temporary protection; Contingency/risk allowance; and Other significant cost drivers. Approximately what percentage or dollar amount of the estimated construction cost is attributable specifically to the current nine-day phased-outage approach? If NIST modified the outage durations or phasing strategy, what approximate cost reduction or increase would industry anticipate? ROM estimates submitted in response to this RFI are requested solely for market research and acquisition planning. They will not constitute offers, proposals, bids, quotations, or binding commitments. C. Experience Working in an occupied Nano-Fab Cleanroom The previous solicitation included Evaluation Factor #2 which required that the contractor have completed a minimum of two (2) HEPA Filter replacements in an occupied laboratory within the previous six years. Based on your experience in occupied nanofabrication facilities, is this a realistic and practical requirement? D. Competition and Industry Participation Based on the project as currently structured, would your company consider submitting a proposal if NIST resolicits this requirement? Yes / No / Possibly Please explain the primary factors influencing your answer. What aspects of the previous/current requirement would discourage your company or other qualified contractors from submitting a proposal? Are the project’s size, bonding requirements, insurance requirements, cleanroom experience requirements, key personnel requirements, outage schedule, liquidated damages, fixed-price structure, or other contractual requirements likely to limit competition? What changes, if any, would materially increase the likelihood that qualified contractors would compete for this project? What type of contractor and subcontractor experience should NIST reasonably require without unnecessarily restricting competition? E. Additional Industry Feedback Please identify any requirement, specification, schedule constraint, contract term, risk allocation, or other issue not addressed above that NIST should consider before resoliciting this project. Please provide any additional recommendations that could improve competition, constructability, schedule reliability, cost certainty, or successful project execution. 6. RESPONDENT INFORMATION Respondents are requested to provide the following: Company name; Company address; Name, title, telephone number, and email address of the point of contact; Unique Entity ID (UEI), if available; Business size and socioeconomic status under the anticipated NAICS code; Relevant experience performing comparable cleanroom, laboratory, HVAC, HEPA filtration, controls, testing/balancing, or phased occupied-facility construction; Whether the respondent would anticipate performing as a prime contractor or subcontractor; and Whether the respondent would be interested in participating in a future industry day, one-on-one market research meeting, or site visit concerning this requirement. 7. RESPONSE INSTRUCTIONS Responses should be submitted electronically to Richard.stevens@nist.gov and Drew.Comley@nist.gov no later than October 14, 2026. The subject line should state: RFI Response – 1333ND26RNB190014 – Building 215 AML Cleanroom Project NIST recommends but does not require that responses be limited to approximately 10-pages, excluding supporting documentation. Respondents may provide responses in Microsoft Word or searchable PDF format. NIST may contact individual respondents for clarification or additional market research discussions. Participation in this RFI or any subsequent market research activity is voluntary and will not affect a firm’s ability to compete for any future solicitation. Respondents should clearly mark proprietary or confidential business information. NIST requests that respondents also provide, where practicable, a version of their response from which proprietary information has been redacted if the response contains significant proprietary material. 8. GOVERNMENT USE OF RESPONSES Information obtained through this RFI may be used by NIST to develop or revise the acquisition strategy, Government estimate, specifications, statement of work, construction phasing, outage durations, schedule, contract structure, solicitation terms, and other acquisition documents. NIST may summarize industry responses for internal Government planning purposes. NIST does not intend to publicly identify individual respondents’ proprietary business information or attribute proprietary recommendations to a particular respondent. The Government may incorporate concepts, recommendations, or approaches identified through market research into a future solicitation, provided such use is consistent with applicable law, regulation, and protection of proprietary information. 9. FAR 52.215-3 – REQUEST FOR INFORMATION OR SOLICITATION FOR PLANNING PURPOSES FAR 52.215-3, Request for Information or Solicitation for Planning Purposes, is incorporated into this notice. For purposes of paragraph (c) of FAR 52.215-3, this RFI is issued for the purpose of obtaining industry information concerning the feasibility, constructability, schedule, cleanroom outage requirements, risk allocation, acquisition approach, and estimated construction cost for the Building 215 AML Cleanroom Repair and HEPA Filter Replacement project to support NIST’s acquisition planning and potential resolicitation of the requirement. END OF REQUEST FOR INFORMATION | Special Notice | 11/02/2026 |
THIS IS A PRE-SOLICITATION NOTICE ONLY. This is not a Request for Proposal (RFP). No proposals are being solicited or accepted at this time. The Government is not liable for any costs incurred by interested parties in response to this notice. This action will be unrestricted and be competed as a Best Value Tradeoff. Solicitation will be delayed some but anticipated no later than 24 March 2026. Requirement is unchanged from sources sought. Action will require a Project Labor Agreement. This action will also have a brandname requirement for the Mass Fire Alarm system. The Justification and Approval will be posted with the Solicitation. | Pre-Solicitation | Open |
**Down Select Notification will occur on/about 09 November 2026. This special notice is to inform industry that those companies down selected to participate in Phase 2 will be invited to attend a site visit at the place of performance on 18 November 2026. SITE VISIT FOR DOWN-SELECTED OFFERORS - The Government intends to provide a site visit for the three (3) down-selected offerors during the Draft RFP review period. Attendance is not required, but strongly encouraged. The purpose of the site visit is to provide the down-selected offerors a common factual understanding of site conditions relevant to proposal development. Attendance requirements, access procedures, safety requirements, allowable attendees, and other administrative instructions shall be provided by the Government. Any questions arising from the site visit shall be submitted through the official Request for Information (RFI) process. Oral statements made during the site visit are not binding unless incorporated into the solicitation by formal written amendment. Site Visit Date, Time, and Location - A site visit at Letterkenny Army Depot will be held 18 November 2026, 8:00-3:30 p.m. EST, prior to the Proprietary Meetings (2 hours per site visit). Coordinates: Building 2 CAC and ID Center; 39.997017, -77.633519. Meeting Room: TBD; Date: TBD; Time: TBD; Proposed Site Visit Agenda: TBD; Site Visit Access and PPE - To enter the installation, a current and valid REAL ID will be required. Once you have been notified that you have been selected to move forward in the procurement process, email TONJA DREKE at tonja.j.dreke@usace.army.mil, and LAUREN ELAMENUEL at Lauren.N.Elamenuel@usace.army.mil, to confirm you plan to attend the site visit. All site visit attendees must be U.S. citizens. Attendees are also requested to bring their own eye protection, hard hat, and preferably steel-toed boots, though closed-toed shoes will be acceptable. Site Visit Attendee Limit - Offerors are requested to limit site visit attendance to six (6) people. Completed AMLD 4497 forms (as applicable) and a list of attendees must be provided to the Contracting Officer no later than 4 p.m. EST on 10 November 2026 prior to the site visit and shall include each individuals first and last name and associated firm, so that LEAD security can process visitor forms (attached). You will be provided with a secure link to send your completed AMLD 4497 forms. DO NOT email the completed AMLD 4497 form directly to USACE emails due to the required Personal Identifiable Information (PII). Those with non-expired badges will only need names and position titles; those with non-expired CACs should review forms and will need names and position titles. For all others, all forms are required and should be prepared and ready for submission in case you are one of the down selected firms. Submission will be due by 4 p.m. EST on 10 November 2026 allowing for the greatest ability for clearance to the site visit on 18 November 2026. Anyone submitting after that time and date cannot be guaranteed to be cleared due to the Veterans Day holiday. Transportation will be provided for those attending the site visit. We will board the Government provided transportation and travel to the project site, where the actual site visit will occur. No pictures are permitted during this site visit. Participants will be required to identify themselves by signing the attendance sheet. Participants will be required to keep their visitor day pass for the site visit and government issued identification with them for the full duration of the site visit. AGAIN, THIS IS ONLY FOR THOSE WHO RECEIVE NOTICE OF DOWN SELECT ON 09 November 2026. **The purpose of this amendment is to: A. Correct percentage in Factor 1 for General contractor. B. Make clarification on projects for DOR in Factor 1. C. Correct period of performance for clarification; 730 calendar days. D. Remove Item 4 Schedule from Team Integration, Factor 2. E. Add site visit date for reference or planning purposes; noting this will only be applicable to those who are down-selected to Phase 2, F. Provide updated attachments Experience in Relevant Projects and Past Performance Questionnaire. All other terms and conditions remain unchanged. This amendment has four (4) attachments. This is a two-phase Design-Build to Budget (DBtB) solicitation for the design and construction of the Component Rebuild Shop in accordance with procedures at RFO 36 and part 15. This solicitation is being issued on a Full and Open, Unrestricted basis. The Government will evaluate Phase I - Technical Proposals in response to this solicitation in accordance with the criteria described herein. The budget for this project will be $79,600,000.00 The North American Industry Classification System (NAICS) code for this acquisition is 236220 Commercial and Institutional Building Construction, size standard $45M. NOTICE: Procurement Integrated Enterprise Environment - Solicitation Module (PIEE-SOL) is the only authorized means of submitting a response to this Request for Proposal (RFP), any other form of submission WILL NOT BE ACCEPTED. PROJNET is the only authorized platform for submission of Request for Information (RFI) by interested parties. Any other form of submission, including email, WILL NOT BE ACCEPTED. ProjNet provides the official record of RFI submission and responses. Guidance for the use of both PIEE-SOL and PROJNET are located in Section 00 20 00 and 00 21 00 of the solicitation. This solicitation has five (5) attachments. | Special Notice | Open |
Additional Details
Solicitation Number
OFPM_TEAM_SS26_12
Archive Date
May 9, 2026