GovChime
Notice ID: a3d9c2b135dc0fa3dc76114a41c408f5Solicitation

Z--Asphalt Overlay Ohana Campground Loops D & F - MOR

Archived on August 30, 2016. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
August 10, 2016
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
DSC CONTRACTING SERVICES DIVISION
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
P16PS02060
Notice ID
a3d9c2b135dc0fa3dc76114a41c408f5

Description

The purpose of this amendment is to post clarifications resulting from the site visit held August 2, 2016. Clarifications based on discussion during the site visit: - Work includes digging out all unpaved utility trench cuts to a depth of 2 inches, then pre-leveling with HMA to the existing asphalt surface, all prior to the final HMA paving operation. - Pre-leveling with HMA is required for all potholes or other depressions. - Gravel from the utility trench excavations is acceptable to be re-used for constructing ramps from the finished asphalt surface into existing camp site access driveways. No asphalt chunks will be allowed in the access ramps. - No gravel is to be placed on the shoulder of the new pavement except at camp site access driveways. - Excess spoils from utility trench excavation shall be stockpiled at a site designated by the COR. One site will be designated per campground loop. - All excess asphalt, including discarded chunks and small areas of ravel along the side of the road shall be cleaned up and removed from the site by the Contractor. - The Contractor is responsible for all surface preparation including sweeping, duff removal along road edges, and tack coat application. - NPS will provide traffic control which will consist of closing the camp ground Loops D & F, and posting construction warning signs. - F loop - remove existing asphalt along the utility trench up to the existing saw cut prior to or during excavation and pre-level work. No other changes.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Griffin, Pamela

Documents

No documents available.

Lifecycle

Solicitation:P16PS02060
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationJul 14, 2016

    Z--Asphalt Overlay Ohana Campground Loops D & F - MOR

    Notice 2a0e9d29052f859812f97e12990fc037 on SAM.gov

  2. SolicitationCurrentAug 10, 2016

    Z--Asphalt Overlay Ohana Campground Loops D & F - MOR

    Notice a3d9c2b135dc0fa3dc76114a41c408f5 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

P16PS02060

Archive Date

Aug 30, 2016