GovChime
Notice ID: 43d25eead952850ce41f1040edfe95a4Combined Synopsis/Solicitation

23--ASIS PURCHASE 3 MOBILE SOLAR WATER SYS

Archived on August 5, 2017. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
July 19, 2017
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
221310: Water Supply and Irrigation Systems
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
DSC CONTRACTING SERVICES DIVISION
Place of performance
Assateague Island National Seashore<br />Berlin<br />MD<br />21811<br />USA<br /> 21811 USA
PSC
23: MOTOR VEHICLES, CYCLES, TRAILERS
Last updated
Dec 5, 2025

Identifiers

Solicitation number
P17PS01769
Notice ID
43d25eead952850ce41f1040edfe95a4

Description

ASIS PURCHASE 3 MOBILE SOLAR WATER SYS

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Braccia, Daniel

Documents

No documents available.

Lifecycle

Solicitation:P17PS01769
  1. Combined Synopsis
  1. 2×
    Combined SynopsisCurrentJun 22, 2017

    23--ASIS PURCHASE 3 MOBILE SOLAR WATER SYS

    Notice 43d25eead952850ce41f1040edfe95a4 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
GRCA 257282 - Replace Wastewater Plant at South Rim Village
-Solicitation12/18/2026
-Market Research11/17/2026
GRCA 257282 - Replace Wastewater Plant at South Rim Village
-Special Notice11/02/2026
The purpose of this amendment is to update the solicitation number from 140P2025R0093 to 140P2026R0101. The solicitation for GRCA 257282 – Replace Wastewater Plant at South Rim Village will be posted under the number 140P2026R0101.
-Pre-Solicitation11/02/2026
The Federal Bureau of Prisons (FBOP) and the Federal Correctional Institution Oxford located at 350 Elk Avenue, Oxford, Wisconsin, intend to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized water softener for the entire Institution. Awarded Contractor shall provide materials, labor, and equipment to remove existing water softeners, pipe through and install a new centralized water softener and all associated components. FCI Oxford currently has several commercial-grade water softeners which are failing to efficiently reduce water hardness and protect water systems, as well as connected equipment. The new centralized system should improve water quality, minimize calcium buildup, and extend the service life of plumbing infrastructure and appliances. The contractor would place a brine tank and softener to be installed at the water tower. Water would be treated right off the water main, therefore there would be no need for bagged salt to be brought in weekly.
-Combined Synopsis12/04/2026

Additional Details

Solicitation Number

P17PS01769

Archive Date

Aug 5, 2017